Building permits and land use

Last verified: 2026-11-15 · Status: Changing

Since 2024 the DOT, a national authority, issues permits for new subdivisions and for projects of 250 square meters or more, in one system with three phases. Smaller works go to municipalities, while the DOT keeps most prior steps. Fees are in the law, and turning land to a use refused at site approval costs a payment of 20 percent of commercial value.

El Salvador is dollarized, so every amount here is already in US dollars, the unrestricted legal tender. Colón equivalents use the fixed legal rate of ¢8.75 per US$1 (Ley de Integración Monetaria, art. 1 and 3, SSF copy) and are for reference only. Wage based amounts use the US$408.80 monthly minimum for industry, commerce and services from 1 June 2025 (Ministry of Labor release of 27 May 2025).

Key facts

Area from which the DOT grants the permit250 square metersLey DOT art. 3, as of 2026-11-15 · in force
Compensation for change of land use20 %D.L. 437 of 2025, Ley DOT art. 38-A, as of 2026-11-15 · in force
Territorial condition report350 USDD.L. 437 of 2025, Ley DOT art. 47 A no. 1, as of 2026-11-15 · in force

The rule

1. The DOT is the national authority for permits on new subdivisions, works, urbanization and construction, and sets land use policy.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 1, 2, 2024-10-16 official text · verified 2026-11-15
2. The DOT handles new subdivisions and projects of 250 square meters or more. Municipalities or their planning offices handle site approval, building line, rain drainage, permit and reception under that size, but the other DOT steps in articles 38, 40 and 42 stay as prerequisites.Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 1 (Ley DOT art. 3, second paragraph), 2025-10-21 official text · verified 2026-11-15 · changed: D.L. 437 of 21 October 2025 widened the DOT role in small projects and added a fee table and land use change rule.
3. The law does not apply to the San Salvador Historic Centre, to projects under the OPAMSS law, to agricultural subdivisions, to building and upkeep of public roads, or to certain public infrastructure, among others.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 33, 2024-10-16 official text · verified 2026-11-15
4. Projects qualified as social interest by the Housing Ministry are also excluded, but the DOT still grants the individual steps in articles 38, 40 and 42 for them.Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 6 (Ley DOT art. 33 no. 6), 2025-10-21 official text · verified 2026-11-15 · changed: D.L. 437 of 21 October 2025 (D.O. 202, T. 449, 27 October 2025) added the social interest exclusion and others for telecom, quarries and fuel storage.
5. Anyone may ask for a territorial condition report, delivered within five working days. It is for information only and starts no permit process.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 35, 2024-10-16 official text · verified 2026-11-15
6. The territorial condition report is an optional service that costs US$350 per property.
Cost to do it: US$350 (¢3,062.50).Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 10 (Ley DOT art. 47 A no. 1), 2025-10-21 official text · verified 2026-11-15
7. Works need permits before they start. The process has a feasibility phase, a permit phase and a compliance phase.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 36, 2024-10-16 official text · verified 2026-11-15
8. Feasibility covers site approval with building line and rain drainage, project category, water and sewer, well exploration, the individual septic system, the major or minor works ruling, cultural review of the land and road side uses.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 38, 2024-10-16 official text · verified 2026-11-15
9. The permit phase covers plans approval for major works, archaeological research, water uses, discharges, the building and subdivision permits, the environmental permit and plans for workplaces and water systems.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 40, 2024-10-16 official text · verified 2026-11-15
10. Since 2025 fire review and tree felling sit in the permit phase, which also gains land use change and earthworks permits. Feasibility gains cultural review of buildings, road review and zoning, and demolition.Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 7, 9 (Ley DOT art. 38, 40), 2025-10-21 official text · verified 2026-11-15 · changed: D.L. 437 of 21 October 2025 reordered the steps in articles 38 and 40.
11. Notice of start of works is due at least 15 working days before the start. The compliance phase ends in reception of the works and a permit to occupy.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 41, 42, 2024-10-16 official text · verified 2026-11-15
12. Where a site approval is refused, a land use change may be sought, paying a cash compensation of 20 percent of commercial value, set by an appraiser on the financial regulator's register at the applicant's cost. Land protected near the Claudia Lars ring road and in the Zapotitán irrigation district is excluded.
Example: ¢1,750,000.00. / US$1,000,000 parcel: US$200,000 plus the land use change fee of US$0.35 per square meter.Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 8 (Ley DOT art. 38-A), 2025-10-21 official text · verified 2026-11-15
13. Building permits cost US$200 up to 500 square meters for housing and US$300 for other uses, then US$0.40 and US$0.50 per square meter from 501 to 50,000.Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 10 (Ley DOT art. 47 B no. 11), 2025-10-21 official text · verified 2026-11-15
14. Subdivision permits cost US$0.20 per square meter of the project up to 50,000 for housing, and US$0.45 for other uses.Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 10 (Ley DOT art. 47 B no. 10), 2025-10-21 official text · verified 2026-11-15
15. Express service costs US$565 per phase, or 30 percent more per step.Decreto Legislativo Nº 437, Reformas a la Ley de Creación de la DOT, Art. 10 (Ley DOT art. 47 A no. 2, 3), 2025-10-21 official text · verified 2026-11-15
16. No other public body or municipality may add fees for works within the DOT remit.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 48, 2024-10-16 official text · verified 2026-11-15
17. Minor offenses carry fines up to 50 monthly minimum wages for commerce, services and industry, serious ones up to 1,000, and very serious up to 10,000.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 52, 2024-10-16 official text · verified 2026-11-15
18. Minor offenses carry fines up to 50 monthly minimum wages, serious ones up to 1,000, and very serious up to 10,000.
Example: US$20,440; US$408,800; US$4,088,000.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 70 to 72, 2024-10-16 official text · verified 2026-11-15
19. Works outside technical rules, off the building line or in a banned use can be ordered demolished at the offender's cost.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 75, 2024-10-16 official text · verified 2026-11-15
20. The law repealed the 2013 Ley Especial de Agilización de Trámites and overrides conflicting rules, including the Código Municipal.Decreto Legislativo Nº 122, Ley de Creación de la DOT (DOT text with D.L. 160 reforms), Art. 86, 93, 2024-10-16 official text · verified 2026-11-15
21. D.L. 655 of September 2026 sets professional liability for those on the DOT register of professionals and service providers.Decreto Legislativo Nº 655, Ley Especial de Responsabilidad Profesional, Art. 1, 2, 2026-09-09 official text · verified 2026-11-15 · changed: New law, D.O. 169 T.452, 11 September 2026.

Worked example

  • Non housing building of 2,000 square meters: permit US$300 for the first 500, then 1,500 at US$0.50 is US$750, total US$1,050 (¢9,187.50), if the band applies only above 500.
  • Site approval for the same project: US$150 plus 1,500 at US$0.30, total US$600.
  • Plans approval for major works: US$95.

Step by step

  1. Order the territorial report.
  2. Register on the DOT platform with a certified electronic signature.
  3. File feasibility, usually in one integrated request.
  4. Get the permit, then give notice 15 working days before work.
  5. Record the works in the log and ask for reception.

Common traps

  • Item 11 of fee table B says the fee is per square meter of the total area to build, yet sets a flat fee up to 500, so it is unclear if US$0.40 or US$0.50 applies to the whole area or only above 500. Ask the DOT for a fee quote.
  • Projects in the metro area may fall outside the DOT. Check OPAMSS.
  • The owner shares liability, so a landlord should not leave permits to a tenant.
  • A site approval is the gate. A refusal costs far more to fix than an early report.

Sources

Related pages

Related: El Salvador country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.