Minerals belong to the State and are granted by INHGEOMIN as exploration, exploitation or processing concessions, or as permits for small and artisanal mining. Metallic concessions cover 100 to 1,000 hectares, exploration lasts up to 5 years plus 5, and exploitation up to 30 years renewable. Before an exploitation concession is granted, an open town meeting must vote in each affected municipality and its decision is binding, with prior consultation for indigenous and Afro Honduran territories.

USD figures use L26.9080 per US dollar, the Banco Central de Honduras reference exchange rate (buying) for 3 November 2026, from the BCH daily dollar price series retrieved on the verification date. Conversions are for orientation only.

Key facts

Maximum term of a metallic exploitation concession (renewable)30 yearsDecreto 109-2019 (art. 22-A), as of 2026-11-03 · in force
Maximum metallic exploration term (extendable once)5 yearsDecreto 238-2012 art. 16, as of 2026-11-03 · in force
Maximum area of a metallic concession on land1000 haDecreto 238-2012 art. 41, as of 2026-11-03 · in force
Maximum number of concessions per holder10 countDecreto 238-2012 art. 43, as of 2026-11-03 · in force
Municipal open town meeting binding before exploitation grantyes textDecreto 109-2019 (art. 67-A), as of 2026-11-03 · in force
Mining authorityInstituto Hondureño de Geología y Minas (INHGEOMIN) textDecreto 238-2012 art. 96, as of 2026-11-03 · in force

The rule

1. The State holds inalienable and imprescriptible dominion over all minerals in the territory, territorial sea and continental shelf; a mining right is a real property right separate from ownership of the surface land.Decreto 238-2012 (Ley General de Minería), art. 2 and 7, 2013-04-02 official text · verified 2026-11-03
2. Concessions may be for exploration, exploitation or processing (beneficio), and for metallic, non metallic, gems and precious stones or crushed stone aggregates; small and artisanal mining operate under permits.Decreto 135-2020, art. 1 (Ley General de Minería art. 8), 2020-12-16 official text · verified 2026-11-03 · changed: Art. 8 reformed by Decreto 135-2020 to add crushed stone aggregates.
3. Exploration concessions last up to 2 years for non metallic minerals and gems and up to 5 years for metallic minerals, extendable once for the same term.Decreto 238-2012 (Ley General de Minería), art. 16, 2013-04-02 official text · verified 2026-11-03
4. Exploitation concessions last up to 20 years for non metallic minerals and gems and up to 30 years for metallic minerals, renewable for equal periods on request with proven reserves, a certified exploitation plan, and compliance with social commitments, environmental mitigation and investment.Decreto 109-2019, art. 1 (Ley General de Minería art. 22-A), 2019-11-25 official text · verified 2026-11-03 · changed: Original art. 22 was declared unconstitutional by the Supreme Court on 23 June 2017 (La Gaceta 34,479 of 31 October 2017) and replaced by art. 22-A through Decreto 109-2019.
5. Every exploration, exploitation and processing concession needs an environmental licence before operations start, and activities must follow international environmental standards and the precautionary principle.Decreto 109-2019, art. 1 (Ley General de Minería art. 27-A), 2019-11-25 official text · verified 2026-11-03
6. Metallic exploration and exploitation concessions cover 100 to 1,000 hectares (100 to 10,000 on the continental shelf); non metallic and gem concessions cover 100 to 400 hectares, with alluvial exploitation capped at 10 hectares; small mining permits cover up to 10 hectares; one person may hold at most 10 concessions.Decreto 238-2012 (Ley General de Minería), art. 41 to 43 and 45, 2013-04-02 official text · verified 2026-11-03
7. No mining rights are granted in declared protected areas, declared water producing zones, beaches and low tide zones of tourism vocation, areas under environmental recovery, renewable energy zones where incompatible or less profitable, and national or UNESCO heritage sites.Decreto 238-2012 (Ley General de Minería), art. 48, 2013-04-02 official text · verified 2026-11-03
8. Exploitation is banned within 200 metres of the centre line of primary roads and within 500 metres upstream and downstream of bridges, dams and urban infrastructure in river beds.Decreto 238-2012 (Ley General de Minería), art. 65, 2013-04-02 official text · verified 2026-11-03
9. Before the exploitation concession, the mining authority asks each municipal council in the project's area of influence to hold an open town meeting (cabildo abierto) within 90 calendar days; its decision binds the grant, and after a rejection a new consultation can only be held after one year. Projects in recognized indigenous and Afro Honduran territories need free, prior and informed consultation under ILO Convention 169.Decreto 109-2019, art. 1 (Ley General de Minería art. 67-A and 68-A), 2019-11-25 official text · verified 2026-11-03 · changed: Original art. 67 and 68 (60 day consultation, three year bar) were struck down in 2017 and replaced by art. 67-A and 68-A through Decreto 109-2019.
10. Concessions may be held by individuals and companies incorporated in Honduras or authorized to trade there; senior officials, legislators, judges, mining officials, local authorities in their territory, their close relatives and tax debtors are barred.Decreto 238-2012 (Ley General de Minería), art. 75, 2013-04-02 official text · verified 2026-11-03
11. A concession cannot be modified, assigned, encumbered or transferred without prior authorization of the mining authority and publication in La Gaceta and two newspapers in the project area; breach leads to cancellation.Decreto 238-2012 (Ley General de Minería), art. 60, 2013-04-02 official text · verified 2026-11-03
12. Before INHGEOMIN authorizes any mineral export, the exporter must present a no objection certificate from the municipality where the mine operates or pays municipal taxes, in addition to assay certificates, origin certificate and the marketing registration.Decreto 195-2026, art. 1 (Ley General de Minería art. 35), 2026-09-23 official text · verified 2026-11-03 · changed: New municipal no objection requirement added by Decreto 195-2026, in force 23 September 2026.
13. Mining rights end by nullity, cancellation or extinction; non payment of canon, penalties and national or municipal taxes is a cause of cancellation.Decreto 238-2012 (Ley General de Minería), art. 79 to 82, 2013-04-02 official text · verified 2026-11-03
ItemMetallicNon metallic and gems
Exploration termUp to 5 years, plus 5Up to 2 years, plus 2
Exploitation termUp to 30 years, renewableUp to 20 years, renewable
Area100 to 1,000 ha100 to 400 ha (alluvial 10 ha)
ConsultationBinding cabildo abierto, 90 daysBinding cabildo abierto, 90 days

Mining concession parameters (Decreto 238-2012 as reformed by Decreto 109-2019 and 135-2020).

Worked example

  • A Canadian junior incorporates a Honduran subsidiary and applies for a 900 hectare metallic exploration concession. It may explore for up to 5 years, extendable once. To move to exploitation, it files exploration results, obtains the environmental licence and waits for the cabildo abierto in each municipality of the area of influence, which must be held within 90 days and binds INHGEOMIN. If granted, the exploitation concession can run up to 30 years and be renewed.

Step by step

  1. 1. Check the cadastre at INHGEOMIN for free areas and exclusion zones.
  2. 2. File the exploration application and pay the first year canon on filing.
  3. 3. Obtain the environmental licence before field work.
  4. 4. Present exploration results and request exploitation; the municipal consultation and, where relevant, ILO 169 consultation follow.
  5. 5. Post the closure guarantee and operating caution before works; register with the municipality and obtain export no objection certificates for each shipment.

Common traps

  • Consultation outcomes are binding; a no vote blocks the grant for at least one year.
  • Several original articles were struck down in 2017, so rely on the 2019 and 2020 reform texts for terms, canon, consultation and taxes.
  • Since 23 September 2026 exports also need a municipal no objection certificate; unpaid municipal taxes now stop shipments.
  • Transfers of concessions or of control without INHGEOMIN authorization cause cancellation.

Sources

Related pages

Related: Honduras country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.