Zoning and building permits

Last verified: 2026-11-15 · Status: Changing

Municipal plans set what you can build and limit ownership without compensation in most cases. The 1987 law works by notice: file, get a receipt, and the municipality checks urban variables in 30 days. The 2026 law adds fixed reply terms for homes and voids permits that lack basic services.

USD figures use Bs 914.0218 per US dollar, and euro amounts use Bs 1,010.56078251 per euro, the Banco Central de Venezuela reference selling rates fixed on 13 November 2026 for value date Monday 16 November 2026 (BCV fourth quarter 2026 rate file, sheet 13112026, USD and EUR rows). The bolívar moves often, so bolívar amounts lose dollar value quickly. Conversions are for orientation only.

Key facts

Bolívares per US dollar used for conversions914.0218 VES per USDBCV reference selling rate, sheet 13112026, value date 16 November 2026, as of 2026-11-16 · in force
Municipal check of urban variables, buildings30 continuous daysLOOU art. 85, as of 2026-11-11 · in force
Preliminary design reply, housing30 business daysLey 2026 art. 13, as of 2026-11-11 · in force

The rule

1. Sanctions first. U.S. persons may pay taxes and fees, and buy permits and registrations, from the Government of Venezuela only where necessary and ordinarily incident to day to day operations, and U.S. dollar payments carry a reporting duty. The licence covers no other dealing with blocked persons. Other payers should check their exposure with counsel.OFAC General License 35, Paras. (a), (b) and (c), 2019-11-05 official text · verified 2026-11-11
2. Town plans delimit ownership, and limits from them do not by themselves give compensation, except ones that denature the right.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Art. 53, 1987-12-16 official text · verified 2026-11-11
3. Land use plans limit ownership in the same way, and permits against plans are void.Ley Orgánica para la Ordenación del Territorio, G.O. 3.238 Ext., National Assembly scan, Arts. 63 and 66, 1983-08-11 official text · verified 2026-11-11
4. Any builder may ask for the urban variables in a preliminary consultation. The municipality replies within 15 business days, or 60 for urbanisations.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Arts. 81 and 82, 1987-12-16 official text · verified 2026-11-11
5. You may seek reconsideration within the same office, with 15 business days to reply, then appeal to the municipal council, which has 30 business days.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Art. 83, 1987-12-16 official text · verified 2026-11-11
6. To start building, the owner notifies the municipality with the project, service capacity certificates and municipal tax receipts, and gets a dated receipt. Works may not start before the record under art. 85 is issued, and utilities must answer service capacity queries within 30 continuous days.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Art. 84, 1987-12-16 official text · verified 2026-11-11
7. The municipality has 30 continuous days for buildings or 90 for urbanisations to check the urban variables only, and then issues a record.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Art. 85, 1987-12-16 official text · verified 2026-11-11
8. Urban variables for buildings are use, front setback and access, gross density, site coverage and floor area, side and rear setbacks, height, safety or environmental limits, and any other variable the plan sets for the plot.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Art. 87, 1987-12-16 official text · verified 2026-11-11
9. If the project does not fit, the municipality notifies the owner and, if works have begun, orders a stop within eight days. On a modified filing it has 15 continuous days to issue the record or refuse it.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Art. 88, 1987-12-16 official text · verified 2026-11-11
10. Works that meet the variables but skip the notice are stopped until the owner complies with arts. 84 and 85, and may resume once the filing is complete and the record is issued.Ley Orgánica de Ordenación Urbanística, G.O. 33.868, National Assembly scan, Art. 109, 1987-12-16 official text · verified 2026-11-11
11. For housing developments, cadastre and urban variables must come in 10 business days, preliminary design in 30, and service feasibility in 20.Ley de Promoción y Protección de la Construcción de Viviendas, G.O. 7.071 Ext., MINHVI copy of the gazette, Arts. 9, 13 and 15, 2026-08-25 official text · verified 2026-11-11 · changed: New terms in force 25 August 2026, housing projects only.
12. Housing permits must rest on studies for environmental and road impact, sewage, water, power, gas, telecoms and soil.Ley de Promoción y Protección de la Construcción de Viviendas, G.O. 7.071 Ext., MINHVI copy of the gazette, Art. 14, 2026-08-25 official text · verified 2026-11-11
13. Permits without the required services are void. Near gas, oil and large water pipelines, high tension lines, national parks, special regime areas, seismic zones and faults, rivers, major roads, rail, ports and airports, municipalities need prior written approval from the specialised body.Ley de Promoción y Protección de la Construcción de Viviendas, G.O. 7.071 Ext., MINHVI copy of the gazette, Art. 16, 2026-08-25 official text · verified 2026-11-11
14. Added value from a change of use or intensity may be recovered by municipalities, capped at 5 percent of the resulting property value under the land use law, and at 15 percent of the gain under the 2010 municipal law, which applies only where value rises by 25 percent or more.Ley Orgánica para la Ordenación del Territorio, G.O. 3.238 Ext.; Ley de Reforma Parcial de la Ley Orgánica del Poder Público Municipal, G.O. 6.015 Ext., National Assembly scans, Art. 68; Arts. 181 and 182, 2010-12-28 official text · verified 2026-11-11 · changed: Municipal law citation moved from the 2005 text (art. 184) to the official 2010 reform (art. 182) on 11 November 2026.
Step1987 law2026 housing law
Urban variables15 business days10 business days
DesignCheck after notice, 30 continuous days30 business days plus 15
Service feasibilityAttach to notice20 business days
OccupancyNot in the arts. readFire service final inspection, then permit in 30 days (art. 33)

Two clocks

Worked example

  • A 60 unit tower falls in the 51 to 100 unit band, so a very serious breach of the housing law costs 36,000 times the BCV euro rate: Bs 36,380,188.17, about US$39,802 at the rates in the note. The permit file matters far more than the filing itself.

Step by step

  1. Request urban variables and cadastre.
  2. Check the plan and any special area regime.
  3. Get service feasibility letters.
  4. File the project with municipal tax receipts.
  5. Keep the dated receipt and follow up the record.
  6. For housing, enrol in the national registry and open the trust.

Common traps

  • The 1987 law is a filing system; the 2026 law reads closer to a permit system for housing, so expect mixed practice.
  • Earthquake zones may see new rules. Art. 16 already names high seismic zones, and we found no updated seismic code in this session.
  • The 1983 land use law still governs. Its 2005 replacement had its start date deferred and was repealed by G.O. 38.633 of 27 February 2007, per the National Assembly record.
  • The two caps on value capture differ (5 percent of value against 15 percent of the gain), so check the ordinance.
  • Local practice in Caracas municipalities varies. Ordinances were not reviewed.

Sources

Related pages

Related: Venezuela country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.