Countries › Brazil › Guide › 3. Investing › Energy transition incentives in Brazil: low carbon hydrogen (Rehidro and PHBC credits) and offshore wind
Energy transition incentives in Brazil: low carbon hydrogen (Rehidro and PHBC credits) and offshore wind
Last verified: 2026-10-27 · Status: Changing
Brazil has a legal framework for low carbon hydrogen (at most 7 kg of CO2 equivalent per kg of hydrogen) with a tax regime, Rehidro, that gives producers the REIDI suspensions on capex for projects habilitated within five years from 1 January 2025. On top, the PHBC program will award CSLL tax credits in competitive auctions for hydrogen sold from 2028 to 2032, capped at R$18.3 billion in total. Offshore wind has its own law since January 2025: seabed areas are granted by authorization or concession, against a signing bonus, an area fee and a share of energy revenue.
USD figures use the Banco Central do Brasil PTAX selling rate of R$5.3346 per US dollar for 27 October 2026 (the rate was R$5.5007 on 26 October and R$5.0377 on 23 October, so conversions move with the market). Conversions are for orientation only; the rate on the day of each FX contract will differ.
Key facts
| Maximum life cycle emissions for low carbon hydrogen | 7 kgCO2eq per kgH2Lei nº 14.948 art. 4 XII, as of 2026-10-27 · in force |
|---|---|
| Window to be habilitated in Rehidro, from 1 January 2025 | 5 yearsLei nº 14.948 art. 27, as of 2026-10-27 · in force |
| PHBC tax credit caps, 2028 to 2032 combined | 18300000000 BRLLei nº 14.990 art. 4 § 1, as of 2026-10-27 · in force |
| Maximum PHBC credit as share of the price gap to substitutes | 100 %Lei nº 14.990 art. 3 § 1, as of 2026-10-27 · in force |
| Maximum fine for non implementation of a PHBC project | 20 % of creditLei nº 14.990 art. 4 § 10, as of 2026-10-27 · in force |
| Union share of the offshore proportional participation | 50 %Lei nº 15.097 art. 14 II a, as of 2026-10-27 · in force |
The rule
Cost to do it: ANP production authorization; certification by an accredited certifier for sales as low carbon hydrogen.Lei nº 14.948 (low carbon hydrogen framework), Art. 4 items XII and XIII; art. 36 (adding item XXIII to Lei nº 9.427 art. 3), 2024-08-02 official text · verified 2026-10-27
Cost to do it: Habilitação under the regulation, with local content and R&D investment commitments.Lei nº 14.948, Arts. 26 §§ 2 and 3, 27, 28 and 29, 2024-08-02 official text · verified 2026-10-27
Cost to do it: Prior project habilitação (the regulation must keep the window to 90 days or less) and, where the auction rules require it, a performance guarantee.
Example: Illustration only (the credit level is set by each auction): a green ammonia plant wins at a credit of R$5 per kg of hydrogen and sells 20,000 tonnes a year: R$100,000,000 of CSLL credit a year, usable against federal taxes. / About US$0.94 per kg and about US$18.7 million of credit a year.Lei nº 14.990 (PHBC), Arts. 3, 4 §§ 6 to 9, 5 and 6, 2024-09-27 official text · verified 2026-10-27
Cost to do it: Exposure to a fine of up to 20 percent of the awarded credit if the project is not delivered.
Example: Total caps of R$18.3 billion over five years. / About US$3.43 billion in total; 2028 cap about US$319 million.Lei nº 14.990, Art. 4 §§ 1 to 4 and 10, 2024-09-27 official text · verified 2026-10-27
Cost to do it: Signing bonus, annual fee per square kilometer and a revenue share percentage, each set in the tender.Lei nº 15.097, Arts. 13 and 14, 2025-01-10 official text · verified 2026-10-27
| Year | Cap (R$) | About US$ |
|---|---|---|
| 2028 | 1,700,000,000 | 319 million |
| 2029 | 2,900,000,000 | 544 million |
| 2030 | 4,200,000,000 | 787 million |
| 2031 | 4,500,000,000 | 844 million |
| 2032 | 5,000,000,000 | 937 million |
| Total | 18,300,000,000 | 3.43 billion |
PHBC tax credit caps by year (Lei nº 14.990 art. 4 § 1); USD at R$5.3346
Worked example
- A European developer plans a 300 MW electrolyzer in a northeastern port zone fed by onshore wind and solar. It incorporates a Brazilian company, seeks ANP authorization and habilitates in Rehidro before 1 January 2030, so equipment and construction materials for the plant come with PIS and COFINS suspended and, as the reform proceeds, IBS and CBS suspended (Lei nº 14.948 art. 28; LC nº 214 art. 106 § 7). It funds part of the capex with incentivized debentures (art. 29) and bids in the PHBC auction for credits on sales from 2028: at an illustrative R$5 per kg on 20,000 tonnes a year, that is R$100,000,000 (about US$18.7 million) of CSLL credit a year, at the risk of a fine of up to 20 percent of the credit if the plant is not delivered (Lei nº 14.990 art. 4 § 10). If the plant is in the SUDENE area and approved by 31 December 2028, the regional income tax reduction may also apply (see Foreign investment regime).
Step by step
- 1. Confirm the product meets the 7 kgCO2eq per kgH2 life cycle threshold and plan certification.
- 2. Incorporate the Brazilian project company (ANP authorization requires head office and management in Brazil).
- 3. Apply for Rehidro habilitação before the 5 year window from 1 January 2025 closes, with the local content and R&D commitments the regulation sets.
- 4. Prepare for the PHBC: project habilitação, then the competitive procedure; price the bid as credit per unit of product.
- 5. For offshore wind, follow the permanent offer route (propose an area for authorization) or the planned offer tenders, and model the signing bonus, area fee and revenue share.
- 6. Layer financing: incentivized debentures, regional incentives and development bank lines.
Common traps
- Assuming the PHBC credit is automatic. It is awarded only through the competitive procedure and within yearly caps that must also be in the budget (Lei nº 14.990 art. 4).
- Selling hydrogen before 2028 and expecting PHBC credits. Only sales from 1 January 2028 to 31 December 2032 qualify (art. 6).
- Missing the Rehidro window. Habilitation must happen within 5 years from 1 January 2025 (Lei nº 14.948 art. 27).
- Diverting Rehidro or REIDI items. Items not used in the works lose the suspension with interest and late fines (Lei nº 11.488 art. 3 § 3).
- Picking an offshore area that overlaps oil and gas blocks, shipping routes or protected areas; such prisms cannot be granted (Lei nº 15.097 art. 6 § 1).
Sources
- Lei nº 14.948 of 2 August 2024 (low carbon hydrogen framework), Diário Oficial da União
- Lei nº 14.990 of 27 September 2024 (PHBC), Diário Oficial da União
- Lei nº 15.097 of 10 January 2025 (offshore power generation), Diário Oficial da União
- Lei nº 11.488 of 15 June 2007 (REIDI), Planalto
- Lei Complementar nº 214 of 16 January 2025, art. 106, Planalto
- Banco Central do Brasil PTAX exchange rates
Related pages
- investing/foreign-investment-regime
- investing/infrastructure-concessions-and-ppps
- sectors/key-sectors-and-regulators
- finance/capital-markets-and-finance
- taxes/tax-incentives