The LatAm Thread

Countries › Cuba › Guide › 11. Real estate and land › Coastal zone and beach rules in Cuba

Coastal zone and beach rules in Cuba

Last verified: 2026-11-09 · Status: Stable

Beaches and coastal land are State property that cannot be sold, and Decreto-Ley 77 of 2023 sets a coastal zone whose inland edge depends on the type of coast, plus a protection zone of at least 20 or 40 metres behind it. New buildings and new residential or lodging areas in the coastal zone are banned unless provided for in the law and the territorial plan, only activities that cannot be placed elsewhere are allowed, and freed spaces cannot get new permanent installations. Usufruct of farmland in the coastal and beach protection zone is barred, and public access must be kept at least every 200 metres of coast and every 100 metres of beach.

Key facts

Minimum width of the protection zone behind beaches and mangroves40 metresDecreto-Ley 77/2023 art. 8.3 b), as of 2026-11-09 · in force
Minimum width of the protection zone behind terraces, cliffs and river mouths20 metresDecreto-Ley 77/2023 art. 8.3 a), as of 2026-11-09 · in force
Maximum spacing of public beach accesses100 metresDecreto 97/2023 art. 8.2, as of 2026-11-09 · in force

The rule

1. Beaches, waters and natural resources are socialist property of the whole people and their ownership cannot be transferred.
Cost to do it: No fee is stated in this norm.Constitución de la República de Cuba, Art. 23, 2019-04-10 official text · verified 2026-11-09
2. The coastal zone's inland edge is set by coast type: on rock terraces and cliffs the line is 20 metres inland from the vegetation line or cliff top, on beaches the inland edge of the nearest dune or 40 metres inland, on mangrove coasts the mangrove limit, and at river mouths at least 300 metres along the river and 60 metres on each bank.
Cost to do it: No fee is stated in this norm.Decreto-Ley 77 De Costas, Art. 6.2, 2023-09-18 official text · verified 2026-11-09
3. The protection zone behind the coastal zone is at least 20 metres wide for terraces, cliffs and river mouths and at least 40 metres for beaches, mangroves and other listed types; both zones can be widened where studies justify it.
Cost to do it: No fee is stated in this norm.Decreto-Ley 77 De Costas, Arts. 8.3 and 9, 2023-09-18 official text · verified 2026-11-09
4. In the coastal zone only activities or installations that by their nature cannot be placed elsewhere are allowed, after environmental impact assessment, and when coastal spaces are vacated no new permanent installations may be placed except for declared public utility or social interest.
Cost to do it: No fee is stated in this norm.Decreto-Ley 77 De Costas, Art. 31, 2023-09-18 official text · verified 2026-11-09
5. In the coastal zone new buildings are banned except as provided in the law and identified in the territorial and urban plan, as is creating or extending residential or lodging areas towards the coast, building any installation outside art. 31.3, and parking or driving vehicles save listed exceptions.
Cost to do it: No fee is stated in this norm.Decreto-Ley 77 De Costas, Art. 40 a), c), d) and h), 2023-09-18 official text · verified 2026-11-09
6. In the protection zone it is banned to build longitudinal interurban roads, destroy sand and gravel deposits, install permanent towers or antennas, run high voltage overhead lines, dump waste and place billboards or audiovisual advertising.
Cost to do it: No fee is stated in this norm.Decreto-Ley 77 De Costas, Art. 41, 2023-09-18 official text · verified 2026-11-09
7. Public access to the coastal zone must be provided at least every 200 metres and to beaches at least every 100 metres where geomorphology allows, and entities using coastal resources must fund those accesses.
Cost to do it: No fee is stated in this norm.Decreto 97 Reglamento del Decreto-Ley 77 De Costas; Decreto-Ley 77, Decreto 97 art. 8.2; Decreto-Ley 77 art. 32, 2023-10-16 official text · verified 2026-11-09
8. State land within the coastal zone and the beach protection zone cannot be granted in agricultural usufruct.
Cost to do it: No fee is stated in this norm.Ley 185 Ley de Tierra Agropecuaria y Forestal, Art. 44.1 e), 2026-07-29 official text · verified 2026-11-09

Step by step

  1. Map the coastal zone and protection zone lines for the site with the territorial planning office.
  2. Check that the project is listed in the territorial and urban plan before designing anything in the coastal zone.
  3. Run the environmental impact assessment and obtain the environmental licence.
  4. Design public access routes at the required spacing and budget for their cost.
  5. For tourism developments, combine these rules with Ley 118 approval and Council of Ministers authorisation.

Common traps

  • Coastal zone lines move with the coast type and can be widened by studies, so old plans may understate the restricted area.
  • Existing structures do not create a right to rebuild once they are removed (art. 31.3).
  • Beach and coastal land is never sold; tourism investors hold rights through approved structures only.

Sources

Related pages

Related: Cuba country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.