Cuba's grid stays in State hands through the Unión Eléctrica (UNE), but private and foreign investors may now generate renewable power: UNE must buy all compliant renewable output, at CUP 90 per kWh at any hour since 2026, with profit tax exempt up to the investment value for up to eight years and duty free equipment listed to 31 December 2027. Businesses can also buy shares of UNE solar parks from US$90 to US$600 per kW to cut their bills. Energy is a sector named in U.S. Executive Order 14404.

USD figures use CUP 800 per US dollar, the Segment III floating rate (tasaEspecial) in the Banco Central de Cuba rate service for 9 November 2026, read on 9 November 2026. Segment I is CUP 24 and Segment II CUP 120 per US dollar, so the dollar value of a peso amount depends on the segment open to you. Conversions are for orientation only.

Key facts

Grid purchase tariff for renewable electricity90 CUP/kWhMFP Res. 114/2026 as amended by Res. 179/2026, as of 2026-11-15 · in force
Maximum period of profit tax exemption for renewable investment (capped at investment value)8 yearsMFP Res. 180/2026 apartado Sexto, as of 2026-11-15 · in force
Price of UNE solar park capacity, 20 year contract600 USD/kWMINEM Res. 76/2025 Anexo Único, as of 2026-11-15 · in force
Minimum solar park capacity a customer may contract0.5 kWMINEM Res. 76/2025 apartado Primero a), as of 2026-11-15 · in force
Grid owner and single buyerUnión Eléctrica (UNE), State owned textDecreto-Ley 345/2019 art. 15.2, as of 2026-11-15 · in force
Customs duty exemption lists for renewable equipment valid until2027-12-31 dateMFP Res. 180/2026 Anexos I and II, as of 2026-11-15 · in force

The rule

1. Sanctions first. Executive Order 14404 lets the U.S. Secretary of State or the Secretary of the Treasury block the property of any foreign person determined to operate, or to have operated, in the energy sector of the Cuban economy. A foreign developer of power plants selling to the State utility would fall within that sector.Executive Order 14404 (91 FR 25061), Sec. 2(a)(i)(A), 2026-05-01 official text · verified 2026-11-15
2. Private Cuban businesses, cooperatives and self employed workers may generate electricity from renewable sources and sell it. Transmission, distribution and sale over the national grid is a conditioned activity: management of the national grid is not authorised except through an economic association or a mixed company between Cuban entities.Decreto 160/2026 (Gaceta Ordinaria 62 of 2026), Anexo Único item 21, 2026-07-28 official text · verified 2026-11-15
3. Foreign investment using renewable energy is approved and authorised by the Council of Ministers. Projects to manage public services such as electricity need prior Council of State approval, followed by a Council of Ministers authorisation.Ley 118 De la Inversión Extranjera (consolidated text, Gaceta Especial 11 of 2026), Art. 21.2 b) and 21.3 f), 2014-03-29 official text · verified 2026-11-15
4. The Unión Eléctrica buys all electricity generated from renewable sources by independent producers (any producer outside UNE) that meets technical standards; the purchase price takes into account, among other things, the avoided cost of fossil fuel generation. Foreign investment in renewables and energy efficiency is a priority sector eligible for tax benefits that rise with its contribution to the economy.Decreto-Ley 345/2019 Del desarrollo de las fuentes renovables y el uso eficiente de la energía (Gaceta Ordinaria 95 of 2019), Arts. 9 and 15, 2019-11-28 official text · verified 2026-11-15
5. UNE pays a single tariff of CUP 90.00 per kWh for renewable electricity delivered to the national grid (SEN) at any hour of the day, by non residential and residential producers. Income from these sales is exempt from the tax on services.
Example: A 1 MW solar plant exporting 1,500,000 kWh a year earns CUP 135,000,000. / The same CUP 135,000,000 is about US$168,750 at the Segment III rate of CUP 800, or US$1,125,000 at the Segment II rate of CUP 120.MFP Resolución 114/2026 (Gaceta Ordinaria 45 of 2026) as amended by MFP Resolución 179/2026 (Gaceta Ordinaria 66 of 2026), Res. 114 apartados Primero and Segundo; Res. 179 apartado Único, 2026-08-07 official text · verified 2026-11-15 · changed: Res. 114 of 6 May 2026, published and in force on 21 May 2026, set CUP 90 per kWh for non residential (C1F) and residential (CFR) producers; Res. 179, in force on publication on 7 August 2026, rewrote apartado Primero without those tariff codes to widen the tariff to power from any renewable source.
6. Legal and natural persons doing business who install renewable sources for own use, for their business or to supply the grid are exempt from profit tax or personal income tax up to the value of the investment during its payback period, for up to eight years. They need an energy certificate (Dictamen Energético) from ONURE, then apply to the ONAT office where they are registered with the payback period from the feasibility study; ONAT sets the start date within 60 days. ONURE can cancel the benefit after inspection.MFP Resolución 180/2026 (Gaceta Ordinaria 66 of 2026), Apartado Sexto, 2026-08-07 official text · verified 2026-11-15 · changed: Res. 180, in force on publication on 7 August 2026, regrouped and widened renewable incentives and repealed MFP Resolución 41/2026.
7. Customs duty exemptions: solar photovoltaic systems and their main parts, solar water heaters, PV pumps, small wind turbines, biodigesters, biogas pumps, solar lighting and air conditioning, renewable powered EV chargers and biomass equipment listed in Annex I are duty free for everyone; raw materials, parts and equipment for renewable investment projects or manufacture listed in Annex II are duty free for legal persons, and generation projects of State and non State actors may ask the ministry to cover goods outside the annex. Both annexes run to 31 December 2027. Wholesale and retail sales of renewable technologies are exempt from sales tax for one year from 7 August 2026, and their prices may carry a margin of no more than 25 percent over cost.MFP Resolución 180/2026, Apartados Primero, Segundo, Cuarto, Quinto, Octavo, Duodécimo, Disposición Especial Única and Anexos I and II, 2026-08-07 official text · verified 2026-11-15
8. Businesses and households can buy installed capacity in UNE solar parks: the minimum is 500 W with no maximum, and the price, paid into UNE accounts, depends on the contract term: US$600 per kW for 20 years, US$312 for 10 years, US$168 for 5 years and US$90 for 2 years. UNE must reduce the buyer's monthly consumption by 125 kWh per contracted kW, buys any monthly net surplus at the applicable tariff, and issues a renewable generation certificate.
Cost to do it: US$600 per kW for a 20 year contract; US$90 per kW for 2 years.
Example: A workshop buying 10 kW for 20 years pays US$6,000 (about CUP 4,800,000 at CUP 800) and gets 1,250 kWh a month off its bill. / 10 kW for 20 years costs US$6,000; for 5 years US$1,680; for 2 years US$900.MINEM Resolución 76/2025 (Gaceta Ordinaria 30 of 2026), Apartados Primero, Segundo, Cuarto and Anexo Único, 2026-03-26 official text · verified 2026-11-15 · changed: Res. 76/2025, dated 13 August 2025 and published 26 March 2026, repealed MINEM Res. 242/2021 and updated solar park capacity prices, citing the fall in solar technology prices.
9. Foreign investment forms that enjoy the special treatment for renewables under article 9 do not use the general customs and tax stimulus for legal persons in articles 10 and 11 of the same decree-law; their benefits come instead from article 9, which grants the exemptions and other tax benefits the law provides on a rising scale tied to their contribution to the economy.Decreto-Ley 345/2019, Arts. 10 to 12, 2019-11-28 official text · verified 2026-11-15
Capacity contracted20 years10 years5 years2 yearsMonthly kWh off the bill
0.5 kW300.00156.0084.0045.0063
1 kW600.00312.00168.0090.00125
5 kW3,000.001,560.00840.00450.00625
10 kW6,000.003,120.001,680.00900.001,250
Above 10 kWCapacity × 1 kW priceCapacity × 1 kW priceCapacity × 1 kW priceCapacity × 1 kW price125 per kW

UNE solar park capacity prices, US$ (MINEM Res. 76/2025 Anexo Único)

Worked example

  • A private manufacturer installs a 1 MW rooftop and ground solar system costing the equivalent of US$700,000, uses part of the output and exports 1,500,000 kWh a year to the grid. Grid sales earn CUP 135,000,000 a year, free of the services tax. With an ONURE energy certificate, ONAT exempts its profit tax up to the US$700,000 investment value over the payback period, for up to eight years, starting within 60 days of the request. Panels and inverters listed in Annex I enter duty free. At CUP 800 per dollar the grid income is about US$168,750 a year, so the payback depends on which FX segment the company can use to service foreign costs.

Step by step

  1. Check whether your structure is a private Cuban business (Decreto 160 item 21) or a foreign investment needing Council of Ministers approval (Ley 118 art. 21.3 f).
  2. Screen the project, suppliers and banks against Executive Order 14404 and the Cuba Restricted List.
  3. Agree grid connection and the purchase contract with the UNE provincial company at the CUP 90 per kWh tariff.
  4. Import listed equipment under Res. 180 Annex I or II, or ask the Ministry of Finance and Prices for a specific exemption for unlisted project goods.
  5. After commissioning, obtain the ONURE Dictamen Energético and apply to ONAT for the profit tax exemption with the feasibility study.
  6. If buying solar park capacity instead, sign the UNE proforma and pay the US$ price into the UNE account.

Common traps

  • The grid tariff is in pesos; the dollar value swings almost sevenfold between Segment II (CUP 120) and Segment III (CUP 800).
  • The sales tax exemption on renewable equipment trade ends one year after 7 August 2026.
  • The profit tax exemption is capped at the investment value and the payback period; it is not a flat eight year holiday.
  • Joint ventures and wholly foreign owned plants do not get the DL 345 art. 10 and 11 benefits; their incentives rest on art. 9 and the foreign investment regime.
  • Private actors may not manage the grid itself; any grid asset must go through an association or mixed company between Cuban entities.

Sources

Related pages

Related: Cuba country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.