Countries › Cuba › Guide › 12. Sectors › Cuba oil and gas: production sharing contracts, concessions, accreditation and tenders

Cuba oil and gas: production sharing contracts, concessions, accreditation and tenders

Last verified: 2026-11-15 · Status: Changing

Upstream oil and gas in Cuba now runs under Decreto-Ley 135/2026 and its regulation, Decreto 184/2026, in force since 19 October 2026: foreign companies first get accredited by the Oficina Nacional de Recursos Minerales (ONRM), then take a production sharing contract (up to 40 plus 10 years) or bid for a petroleum concession (up to 30 plus 10 years), with Council of State approval and a Council of Ministers title. Energy is a sector named in U.S. Executive Order 14404, so sanctions advice comes first.

USD figures use CUP 800 per US dollar, the Segment III floating rate (tasaEspecial) in the Banco Central de Cuba rate service for 9 November 2026, read on 9 November 2026. Segment I is CUP 24 and Segment II CUP 120 per US dollar, so the dollar value of a peso amount depends on the segment open to you. Conversions are for orientation only.

Key facts

Production sharing contract maximum term (extendable by up to 10 years)40 yearsDecreto-Ley 135/2026 art. 28.1, as of 2026-11-09 · in force
Petroleum concession maximum term (extendable by up to 10 years)30 yearsDecreto-Ley 135/2026 art. 31.1, as of 2026-11-09 · in force
ONRM deadline to issue an accreditation certificate45 daysDecreto 184/2026 art. 27.1, as of 2026-11-09 · in force
Minimum bid submission window in a concession tender (maximum 60)45 working daysDecreto 184/2026 art. 73.3, as of 2026-11-09 · in force
State fee on assignment or change of control of a petroleum concession1 %Decreto 184/2026 art. 59, paragraph 10 c), as of 2026-11-09 · in force
Oil and gas regulatorOficina Nacional de Recursos Minerales (ONRM), under the Ministry of Energy and Mines textDecreto-Ley 135/2026 arts. 7 and 9, as of 2026-11-09 · in force

The rule

1. Sanctions first. Executive Order 14404 lets the U.S. block any foreign person determined to operate, or to have operated, in the energy sector of the Cuban economy, and Section 4 lets Treasury cut off correspondent accounts of, or block, any foreign bank that conducts or facilitates a significant transaction for a blocked person. An upstream oil and gas investor and its lenders are therefore exposed even with no U.S. nexus of their own.Executive Order 14404 (91 FR 25061), Sec. 2(a)(i)(A) and Sec. 4, 2026-05-01 official text · verified 2026-11-15
2. Deposits of oil, gas and accompanying substances belong to the whole people and are inalienable. National or foreign persons may take part only once authorised, through one of four routes: a production sharing contract, a petroleum concession, a petroleum services contract, or another association form under Cuban law (for example a Ley 118 joint venture). Contracts and concessions cover only the resources they name, and any other substance found must be reported to the ONRM within three working days.Decreto-Ley 135/2026 De Petróleo y Gas (Gaceta Ordinaria 85 of 2026), Arts. 3, 20, 21 and 26, 2026-10-12 official text · verified 2026-11-09 · changed: Decreto-Ley 135/2026 entered into force seven days after publication on 12 October 2026 and replaced the 1938 combustible minerals law; Decreto 184/2026 repealed the 2018 MINEM qualification procedure (Res. 191/2018) and five other technical resolutions.
3. Every exploration and production title needs prior approval by the Council of State under article 23 of the Constitution; the Council of Ministers then grants the title (concession, authorisation, permit or licence). The State may refuse any title on national security grounds. Ley 118 art. 21.2 a) also puts non renewable resource projects before the Council of State, except risk association contracts, which the Council of Ministers approves (art. 21.3 d).Decreto-Ley 135/2026; Ley 118 (consolidated text, Gaceta Especial 11 of 2026), DL 135 arts. 22 and 23; Ley 118 art. 21, 2026-10-12 official text · verified 2026-11-09
4. Before negotiating or bidding, a company must be accredited by the ONRM. A foreign applicant files its constitutive documents, a home registry certificate no older than 180 calendar days, the appointment of its top management, a notarial statement that it is not bankrupt or in suspension of payments and a power of attorney, all in Spanish, legalised at a Cuban consulate (or before the Ministry of Justice) and protocolised before a Cuban notary, plus three years of exploration and production history (or, for a new vehicle, evidence of the team's competence). The ONRM decides within 45 calendar days; categories are A (water depth over 300 metres), B (up to 300 metres) and C (onshore), and a higher category covers the lower ones. The certificate lasts three years if no contract is signed, and accreditation does not oblige the State to negotiate.
Cost to do it: The application carries the ONRM procedure fee (art. 22), whose amount is not published in the decree; registry filings are subject to the stamp tax on documents (art. 6 e). Budget separately for consular legalisation, sworn translation and Cuban notarial protocolisation.Decreto 184/2026, Reglamento del Decreto-Ley 135 (Gaceta Ordinaria 85 of 2026), Arts. 19 to 32, 2026-10-12 official text · verified 2026-11-09
5. A production sharing contract is signed with a Cuban public entity or State authorised company acting for the State; the partners carry the technical and financial risk. Its term depends on the area, up to 40 years, extendable by up to 10 years if resources remain, with the extension requested between three years and one year before expiry. It is awarded by tender or, exceptionally, directly for reasons of public interest, urgency or national convenience.Decreto-Ley 135/2026, Arts. 27 to 29, 2026-10-12 official text · verified 2026-11-09
6. A petroleum concession is an administrative concession granted by the Council of Ministers to a Cuban or foreign legal person, which explores and produces at its own risk. The term is set per area, up to 30 years, extendable by up to 10 years on a request filed between five and three years before expiry. The State owns the hydrocarbons until extraction and transfers title to the concessionaire at the fiscal metering point; the concession gives no right to the surface land or to other resources.Decreto-Ley 135/2026; Decreto 184/2026, DL 135 arts. 30 and 31; Decreto 184 arts. 55 to 57, 2026-10-12 official text · verified 2026-11-09
7. Concessions are awarded by open tender, and only exceptionally by restricted tender. An interested company may ask the ONRM for a specific area: a call is then published for that area and, if no one else comes forward, the area is awarded to the applicant once it meets the requirements. In a full tender the draft terms go out for consultation for at least 30 working days (up to 40), bids are received for 45 to 60 working days from publication of the call, the tender commission has three working days for the technical and three for the economic evaluation, and the concession agreement is signed within 30 working days of notice of the award. The full agreement is published in the Gaceta Oficial and on the ONRM website.Decreto 184/2026, Arts. 60, 66 to 80, 2026-10-12 official text · verified 2026-11-09
8. A concession is personal (intuitu personae). Any total or partial assignment, any change of control that changes the operator or the beneficial owner, and any pledge over concession rights need prior express State approval; the assignee must meet the original tender's technical and financial standards, and the State charges a transfer fee of 1 percent of the total transaction value (except for project finance security). A change of direct or indirect control of 50 percent or more must be notified at once, and closing without prior approval is a ground for forfeiture.
Cost to do it: Transfer fee of 1 percent of the total transaction value.
Example: A farm out valued at CUP 8,000,000,000 pays a CUP 80,000,000 transfer fee. / A farm out valued at US$10,000,000 pays a US$100,000 transfer fee.Decreto 184/2026, Art. 59, paragraphs 8 d) and 10, 2026-10-12 official text · verified 2026-11-09
9. The concession agreement must contain a stability clause: the royalty, surface fee and specific petroleum tax regime in force on the award date can only be changed in the cases and conditions set in the agreement itself. Safety, environmental, occupational health and public order rules are expressly excluded from stability and apply immediately, without compensation.Decreto 184/2026, Art. 59, paragraph 11, 2026-10-12 official text · verified 2026-11-09
10. Exploration runs in two phases, prospect identification and discovery evaluation, ending in a declaration of commerciality approved by the ONRM. The operator must then file a development plan within 180 calendar days for onshore fields and within two years for offshore fields, and annual production rates need ONRM approval before wells may produce. Routine flaring and venting are banned except where the regulation allows.Decreto-Ley 135/2026; Decreto 184/2026, DL 135 arts. 36, 39, 42 and 44; Decreto 184 arts. 99 and 100, 2026-10-12 official text · verified 2026-11-09
11. All geological, geophysical and production data belong to the State and must be delivered free of charge to the ONRM; it cannot be disclosed to third parties without ONRM approval. Cuban suppliers of goods and services have a first option when they match quality, deadlines and competitive prices, permanent residents have a first option for jobs, and Cuban insurers have a first option on property, liability and environmental cover at internationally competitive terms.Decreto-Ley 135/2026, Arts. 72, 73, 109, 110 and 111, 2026-10-12 official text · verified 2026-11-09
12. Contracts, concessions and petroleum service companies must be registered in the Registro Central Minero Petrolero de Permisos y Licencias before any activity starts. The filing is due within 30 working days of approval, the ONRM checks it within seven working days and decides within 30 working days of filing.Decreto-Ley 135/2026; Decreto 184/2026, DL 135 arts. 14 to 17; Decreto 184 art. 6, 2026-10-12 official text · verified 2026-11-09
13. Breaches are fined in quotas: operational, safety, environmental and obstruction breaches carry 60 to 200 quotas and documentary or reporting breaches 20 to 59 quotas, with a quota worth CUP 50 to 1,000 for legal persons and CUP 10 to 200 for individuals, plus orders to stop work or repair damage. Appeals go first to the ONRM director general (reforma, 10 working days) and then to the Minister of Energy and Mines (alzada, 10 working days) before the courts.Decreto-Ley 135/2026; Decreto 184/2026, DL 135 arts. 118 and 119; Decreto 184 arts. 212, 213 and 216, 2026-10-12 official text · verified 2026-11-09
14. Contracts and agreements in force when the decree-law took effect keep their terms. For production sharing contracts already signed, the new cost recovery limits apply only from any extension.Decreto-Ley 135/2026; Decreto 184/2026, DL 135 Disposición Especial Única; Decreto 184 art. 189, 2026-10-12 official text · verified 2026-11-09
RouteCounterpartyRiskMaximum termAwardFiscal take
Production sharing contractCuban State entity or authorised companyContractor carries technical and financial risk40 years plus up to 10Tender, exceptionally direct awardCost oil capped at 65 or 75 percent of gross output, rest shared
Petroleum concessionThe State, by Council of Ministers titleConcessionaire at own risk30 years plus up to 10Open tender, exceptionally restrictedSurface fee, royalty, taxes, extraordinary share
Petroleum services contractEntities carrying out petroleum activitiesFee for specialised workBy contractUnder foreign trade rulesGeneral tax regime
Other association formsCuban partner under Ley 118As agreedAs approvedLey 118 approvalLey 118 regime

Routes into Cuban upstream oil and gas (Decreto-Ley 135/2026; Decreto 184/2026)

Worked example

  • A foreign mid cap wants a 1,500 km² onshore block. It obtains ONRM category C accreditation (up to 45 calendar days after a complete file), asks the ONRM to open the area, and if no rival bidder appears within the call it is awarded the concession. It then signs the agreement within 30 working days, posts a standby letter of credit for 100 percent of the first phase firm work programme and registers the concession within 30 working days. If a later farm out sells 40 percent for US$10,000,000, the State's 1 percent transfer fee is US$100,000, and the sale needs prior approval. Because energy is named in Executive Order 14404, the company and its banks should take U.S. sanctions advice before the first step.

Step by step

  1. Screen the project, partners, banks and offtakers against Executive Order 14404, 31 CFR Parts 515 and 516 and the Cuba Restricted List.
  2. Prepare the accreditation file (Decreto 184 arts. 23 and 24): legalise and translate corporate documents and protocolise them before a Cuban notary.
  3. File with the ONRM and pay the procedure fee; expect a decision within 45 calendar days, with 15 working days to cure any defect notice.
  4. Choose the route: negotiate a production sharing contract with the State entity, or ask the ONRM to open an area for a concession call.
  5. Bid within the 45 to 60 working day window; sign the concession agreement within 30 working days of the award and post the guarantees.
  6. Register the title in the Registro Central Minero Petrolero within 30 working days of approval and obtain the environmental licence before field work.
  7. After a commercial discovery, file the development plan within 180 days onshore or two years offshore.

Common traps

  • Accreditation gives no right to a contract; the State entity's decision to negotiate is discretionary (Decreto 184 art. 31.2).
  • Selling or restructuring the parent can trigger the 50 percent change of control notice and forfeiture risk, not only a direct sale of the concession.
  • Stability covers the royalty, surface fee and specific tax regime only; new safety and environmental rules apply at once with no compensation.
  • Data you generate cannot be shared with partners, buyers or financiers without ONRM approval (DL 135 art. 73.2).
  • Council of State approval is needed for each exploration and production title, so timetables depend on its sessions as well as on the ONRM.
  • Cuban approval does not cure U.S. exposure: the energy sector is named in Executive Order 14404, and Section 4 reaches foreign banks.

Sources

Related pages

Related: Cuba country profile · live dashboard · central bank and release calendar · our posts on X