The LatAm Thread

Countries › El Salvador › Guide › 3. Investing › Renewable energy incentives

Renewable energy incentives

Last verified: 2026-11-15 · Status: Changing

New renewable generation gets income tax exemption of 10 years up to 10 MW or 5 years above it, plus ten years of duty free equipment. Geothermal has its own 2025 law, and rooftop and storage suppliers have a 2025 law. Since July 2026 the electricity regulator role of SIGET sits with the energy directorate.

El Salvador is dollarized, so every amount here is already in US dollars, the unrestricted legal tender. Colón equivalents use the fixed legal rate of ¢8.75 per US$1 (Decreto Nº 201, Ley de Integración Monetaria, art. 1) and are for reference only.

Key facts

Income tax exemption, up to 10 MW10 yearsDecreto 148 of 2015, as of 2026-11-15 · in force
Income tax exemption, above 10 MW5 yearsDecreto 148 of 2015, as of 2026-11-15 · in force
Geothermal concession30 yearsDecreto 404 art. 24, as of 2026-11-15 · in force

The rule

1. New plants or expansions using hydro, geothermal, wind, solar, marine, biogas or biomass qualify. For ten years, imported machinery and materials for preinvestment and construction are free of duties, requested at least 15 days before import.Decreto Legislativo Nº 148, reforming Decreto 462, Art. 2, replacing art. 3 a), 2015-10-15 official text · verified 2026-11-15
2. Income from generation is free of income tax for ten years for projects of 10 MW or less and five years above 10 MW, counted from the fiscal year of first income.Decreto Legislativo Nº 148, reforming Decreto 462, Art. 2, replacing art. 3 b), 2015-10-15 official text · verified 2026-11-15
3. Income from certified emission reductions is free of all taxes if the project is registered and reporting conditions are met.Decreto Legislativo Nº 148, reforming Decreto 462, Art. 2, replacing art. 3 c), 2015-10-15 official text · verified 2026-11-15
4. Geothermal exploitation for electricity needs a concession approved by the Assembly, of no more than 30 years. CEL and related entities are outside this rule.Decreto Legislativo Nº 404, Ley de Energía Geotérmica, Art. 24, 2025-09-10 official text · verified 2026-11-15
5. Geothermal plants get ten years of duty exemption, ten years of income tax exemption, tax free carbon and renewable certificates, and deduction of reinjection costs for up to ten years.Decreto Legislativo Nº 404, Ley de Energía Geotérmica, Art. 67, 2025-09-10 official text · verified 2026-11-15
6. Direct use permits, up to 5 MW thermal with no drilling, reach up to 25 years and are renewable.Decreto Legislativo Nº 404, Ley de Energía Geotérmica, Art. 60, 2025-09-10 official text · verified 2026-11-15
7. Suppliers of renewable systems to end users, with a qualification agreement, are exempt from income tax, withholding, VAT on local sales and import taxes on such activity.Decreto Legislativo Nº 436, Ley de Fomento para el Uso de la Energía Renovable, Art. 7, 8, 2025-10-21 official text · verified 2026-11-15
8. End users buying from a qualified supplier pay no VAT and can deduct the cost from taxable income for that year.Decreto Legislativo Nº 436, Ley de Fomento para el Uso de la Energía Renovable, Art. 9, 2025-10-21 official text · verified 2026-11-15
9. End users may feed surplus into the grid, with the tariff in a regulated schedule.Decreto Legislativo Nº 436, Ley de Fomento para el Uso de la Energía Renovable, Art. 5, 6, 2025-10-21 official text · verified 2026-11-15
10. These incentives last ten years from the law taking effect.Decreto Legislativo Nº 436, Ley de Fomento para el Uso de la Energía Renovable, Art. 11, 2025-10-21 official text · verified 2026-11-15
11. Electricity references to SIGET now mean the DGEHM.Decreto Legislativo Nº 620, Art. 3, 2026-07-02 official text · verified 2026-11-15 · changed: July 2026 transfer of electricity functions.

Worked example

  • A rooftop buyer with US$50,000 (¢437,500.00) of qualified equipment pays no VAT and may deduct the cost in that year. At 30 percent income tax, assumed for illustration, the deduction is worth US$15,000 (¢131,250.00).

Step by step

  1. Size the project: 10 MW is the line.
  2. Get certification from the energy authority.
  3. Ask Hacienda at least 15 days before importing.
  4. Keep metering for added generation in expansions.

Common traps

  • Expansions count only if added generation can be measured.
  • The duty exemption does not reach household furniture or passenger vehicles.
  • The Assembly must approve geothermal concessions.
  • The consolidated Decreto 462 was read through its 2015 reform only.
  • VAT credit on preinvestment follows a special rule in the reform.

Sources

Related pages

Related: El Salvador country profile · live dashboard · central bank and release calendar · our posts on X