Environmental enforcement in Guatemala: fines, closure, crimes and public complaints

Last verified: 2026-11-15 · Status: Changing

MARN fines projects with no assessment Q5,000 to Q100,000, set in units by category, and closure follows after six months. It can also suspend, confiscate, order demolition and fine for damage. Anyone can report, and pollution is also a crime, with up to ten years for managers.

USD figures use Q7.64187 per US dollar, the Banco de Guatemala reference rate (TCR) for 31 October 2026, from the Banguat historical exchange rate query for that date (row 31/10/2026): https://www.banguat.gob.gt/cambio/historico.asp?kmoneda=02&ktipo=5&kdia=31&kmes=10&kanio=2026&kdia1=31&kmes1=10&kanio1=2026&submit1=Consultar . Conversions are for orientation only.

Key facts

Minimum fine, no assessment5000 GTQDecreto 68-86 art. 8, as of 2026-10-31 · in force
Maximum fine, no assessment100000 GTQDecreto 68-86 art. 8, as of 2026-10-31 · in force
Months to comply before closure6 monthsDecreto 68-86 art. 8, as of 2026-10-31 · in force
Quetzales per US dollar used on this page7.64187 GTQ per USDBanco de Guatemala reference rate (TCR, resolución JM-126-2006), row 31/10/2026, as of 2026-10-31 · in force

The rule

1. No assessment. Fine of Q5,000 to Q100,000, and closure if not fixed in six months after the fine. Officials who fail to require the study are personally liable.
Cost to do it: Fine Q5,000 to Q100,000, about US$654 to US$13,086.
Example: A workshop with no instrument is fined and has six months. / A foreign buyer inherits the site's position.Decreto Nº 68-86 del Congreso, Ley de Protección y Mejoramiento del Medio Ambiente, Art. 8, 1986 official text · verified 2026-10-31
2. Unit scale. The base unit is Q100, adjusted for the exchange rate. Category C 50 to 250 units; B2 251 to 500; B1 501 to 750; A 751 to 1,000. The same bands apply to unauthorized activities, project splitting, and lapsed insurance or licence. Breach of commitments is 50 to 1,000 units in total. Damage is fined at MARN's valuation.
Cost to do it: At Q100 a unit: Q5,000 to Q25,000 for C, up to Q100,000 for A.
Example: A B2 site with a lapsed licence pays at least about Q25,100. / That is about US$3,285.Acuerdo Gubernativo Nº 137-2016, Reglamento de Evaluación, Control y Seguimiento Ambiental (11 July 2016), as reformed, Art. 108 and 109, as reformed by Nº 121-2018, 2018-07-18 official text · verified 2026-10-31
3. Voluntary regularization. Acuerdo 171-2025, published in the official gazette on 26 September 2025, provides that projects operating with no environmental instrument that come forward to MARN on their own are fined the minimum units of their category under art. 109 lit. a: 50, 251, 501 or 751. This applies only if no complaint or proceeding is open against them and their activity does not breach Decreto 68-86. The 2018 text of the transitional regularization article (art. 119) had set a flat Q5,000 fine whatever the category.
Cost to do it: About Q5,000, Q25,100, Q50,100 or Q75,100 at the base unit.
Example: A category A site pays about Q75,100. / That is about US$9,827.Acuerdo Gubernativo Nº 171-2025, reforming Acuerdo Gubernativo Nº 137-2016 (Reglamento de Evaluación, Control y Seguimiento Ambiental), Regularization rule, by reference to art. 109 lit. a; earlier art. 119 as reformed by Nº 121-2018, 2025-09-26 official text · verified 2026-11-15 · changed: From 26 September 2025, voluntary filers pay the minimum units of their category instead of the earlier flat Q5,000.
4. Other sanctions. Warning, time to correct, suspension, confiscation, modification or demolition of works, damage fines and other corrective measures, weighing gravity, public harm, conditions and repetition. Infractors are heard first, under the incident procedure.
Cost to do it: Depends on the case.
Example: A plant can be ordered to tear down a non compliant wall. / Project finance should cover this risk.Decreto Nº 68-86 del Congreso, Ley de Protección y Mejoramiento del Medio Ambiente, Art. 29, 31, 33 and 34, 1986 official text · verified 2026-10-31
5. Precaution and collection. MARN can suspend temporarily when a risk exists, even without full scientific certainty. A certified fine resolution is an enforcement title for coercive collection. Fines do not replace civil damages.
Cost to do it: Fine plus damages.
Example: A spill can stop a plant before any fine. / Business interruption cover may be needed.Acuerdo Gubernativo Nº 137-2016, Reglamento de Evaluación, Control y Seguimiento Ambiental (11 July 2016), as reformed, Art. 105, 110 and 111, 2016-07-11 official text · verified 2026-10-31
6. Public action. Anyone may report any act that pollutes or damages resources, to the authority or municipality.
Cost to do it: No fee in the article.
Example: Neighbors may trigger an inspection. / A community complaint can delay a foreign project.Decreto Nº 68-86 del Congreso, Ley de Protección y Mejoramiento del Medio Ambiente, Art. 30, 1986 official text · verified 2026-10-31
7. Crimes. Pollution of air, soil or water: one to two years and Q300 to Q5,000; negligent: Q200 to Q1,500. Industrial pollution allowed by a director or manager: two to ten years and Q3,000 to Q10,000. Officials approving a polluting plant face the same.
Cost to do it: Low fines; prison is the main exposure.
Example: A manager may answer for a toxic discharge. / Fines peak at about US$1,309.Decreto Nº 17-73 del Congreso, Código Penal, added by Decreto Nº 33-96, Art. 347 A, 347 B and 347 C, 1996 official text · verified 2026-10-31
CategoryUnitsAt Q100 a unitVoluntary minimum
C50 to 250Q5,000 to Q25,00050 units, Q5,000
B2251 to 500Q25,100 to Q50,000251 units, Q25,100
B1501 to 750Q50,100 to Q75,000501 units, Q50,100
A751 to 1,000Q75,100 to Q100,000751 units, Q75,100

Fine bands, Acuerdo Gubernativo 137-2016 art. 109. The unit is adjusted for the exchange rate under art. 108, so paid amounts can differ.

Worked example

  • An A category plant with no instrument comes forward. It pays 751 units, about Q75,100 (about US$9,827), and files. If MARN finds it first, the fine can reach 1,000 units, Q100,000 (about US$13,086), with closure after six months if it still has not filed.

Step by step

  1. Audit each site's instrument, licence and insurance.
  2. Self report gaps before an inspection.
  3. Keep monitoring records.
  4. Set a spill response plan.
  5. Review M&A warranties for this exposure.

Common traps

  • Press reports give quetzal amounts per category that differ from the unit bands. We use the units in art. 109 lit. a. The full gazette text of 171-2025 was not read; the rule above rests on the official gazette notice, which quotes the regularization provision.
  • Art. 108 indexes the unit to the rate at the date of the regulation, which was not verified, so Q100 is the base.
  • The law still mentions the old Comisión; MARN carries out its duties under the reg.

Sources

Related pages

Related: Guatemala country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.