The LatAm Thread

Countries › Guatemala › Guide › 13. Regulation › Wastewater and solid waste in Guatemala: technical study, discharge limits and the end of the waste regulation

Wastewater and solid waste in Guatemala: technical study, discharge limits and the end of the waste regulation

Last verified: 2026-11-15 · Status: Changing

Generators of wastewater must keep a technical study and meet limits that tighten by stage under Acuerdo Gubernativo 236-2006. In June 2024 the Constitutional Court provisionally left several of its articles without effect, and MARN said in August 2025 the case was still pending. The solid waste regulation, Acuerdo 164-2021, was declared unconstitutional in August 2025; MARN plans a waste law instead.

USD figures use Q7.64187 per US dollar, the Banco de Guatemala reference rate (TCR) in the 31/10/2026 row of the Banguat historical series (https://www.banguat.gob.gt/cambio/historico.asp?kmoneda=02&ktipo=5&kdia=30&kmes=10&kanio=2026&kdia1=31&kmes1=10&kanio1=2026&submit1=Consultar). Conversions are for orientation only.

Key facts

Total phosphorus limit for lake basins, end of stage four5 mg/lAcuerdo Gubernativo 236-2006 art. 62, as of 2026-11-15 · in force
Oils and fats limit for discharges to water bodies, stage four10 mg/lAcuerdo Gubernativo 236-2006 art. 20, as of 2026-11-15 · in force
Suspended solids limit for discharges to water bodies, stage four100 mg/lAcuerdo Gubernativo 236-2006 art. 20, as of 2026-11-15 · in force
Quetzales per US dollar used on this page7.64187 GTQ per USDBanco de Guatemala reference rate, row 31/10/2026, as of 2026-10-31 · in force

The rule

1. Technical study. Anyone generating or managing special, ordinary or mixed wastewater, whether discharged to a water body or public sewer, must prepare an expert study characterizing effluents, discharges, reuse and sludge, and keep it for MARN. Single family homes and buildings with only ordinary water connected to authorized sewers are exempt.
Cost to do it: Lab and expert fees are private.
Example: A food plant needs a study. / A foreign hotel operator with its own plant needs one too.Acuerdo Gubernativo Nº 236-2006, Reglamento de las Descargas y Reúso de Aguas Residuales y de la Disposición de Lodos (5 May 2006), compiled text with reforms published by AMSA, the government authority for Lake Amatitlán, Art. 5, 6 and 61, 2006-05-05 official text · verified 2026-11-15
2. Limits and stages. Art. 20 sets limits for discharges to water bodies in four stages. For example, oils and fats 100, 50, 25 and 10 mg/l, and suspended solids 600, 400, 150 and 100 mg/l, with pH 6 to 9. Under art. 21, new generators must meet the final values (for example 10 mg/l oils and fats, 100 mg/l suspended solids) from the start of operations. Under art. 62, discharges into lake, lagoon or natural reservoir basins must meet 5 mg/l total phosphorus at the end of stage four, and new generators from the start.
Cost to do it: Treatment plant cost is a private capital item.
Example: A new plant goes straight to the final limits. / Design to the final stage from day one.Acuerdo Gubernativo Nº 236-2006, Reglamento de las Descargas y Reúso de Aguas Residuales y de la Disposición de Lodos (5 May 2006), compiled text with reforms published by AMSA, the government authority for Lake Amatitlán, Art. 20, 21 and 62, 2006-05-05 official text · verified 2026-11-15
3. Sanctions. Breaches lead to the sanctions of the Ley de Protección y Mejoramiento del Medio Ambiente, weighing the gravity of the impact, harm to the population, the conditions and repetition. Failing to meet the technical study requirements of art. 6 lets MARN open an administrative process under arts. 29, 31 and 34 of that law.
Cost to do it: See enforcement page.
Example: A repeat discharge can lead to suspension. / Lenders may treat this as a covenant.Acuerdo Gubernativo Nº 236-2006, Reglamento de las Descargas y Reúso de Aguas Residuales y de la Disposición de Lodos (5 May 2006), compiled text with reforms published by AMSA, the government authority for Lake Amatitlán, Art. 60, 2006-05-05 official text · verified 2026-11-15
4. Court suspension. In June 2024 the Constitutional Court granted the national association of municipalities (ANAM) a provisional measure that left without effect several articles of the regulation, those obliging municipalities to build treatment systems and file technical and financial studies. In August 2025 the environment minister said the Court still kept the wastewater regulation on hold while the challenge was pending. We found no final ruling on an official host.
Cost to do it: None.
Example: A municipality should check whether the provisional measure still stands before planning its plant timetable. / Private generators should not treat the measure as a waiver of their own discharge limits.Acuerdo Gubernativo Nº 236-2006; Corte de Constitucionalidad provisional measure on the ANAM challenge, as reported by Diario de Centro América, Not stated in the official reports, 2024-06-05 official text · verified 2026-11-15 · changed: Round 2 fix, 15 Nov 2026: the earlier case number and list of suspended articles could not be confirmed on an official host that loads and were removed; status now cited to Diario de Centro América reports of June 2024 and August 2025.
5. Solid waste. MARN and the health ministry announced on 28 August 2025 that they would comply with a Constitutional Court ruling declaring Acuerdo Gubernativo 164-2021, the Reglamento para la Gestión Integral de Residuos y Desechos Sólidos Comunes, unconstitutional. MARN said it would not reform the text but would propose a waste law to Congress, and that municipalities still have to manage waste. The national sorting duties of that regulation therefore no longer bind.
Cost to do it: Municipal or collector charges vary.
Example: A shopping centre follows municipal waste rules and its collector contract, not the annulled regulation. / A foreign retail chain should check municipal ordinances in each city where it operates.Acuerdo Gubernativo Nº 164-2021, declared unconstitutional by the Corte de Constitucionalidad (August 2025), as reported by Diario de Centro América, Whole regulation, 2025-08-28 official text · verified 2026-11-15 · changed: August 2025: the Constitutional Court declared Acuerdo 164-2021 unconstitutional. This page said until 15 Nov 2026 that the regulation was in force with three way sorting; corrected.

Worked example

  • A beverage plant buys a Q2,000,000 treatment system (about US$261,716) designed to the stage four limits of art. 20 and keeps its technical study. This avoids a redesign when limits tighten and helps defend against an administrative process under the environment law.

Step by step

  1. Commission the technical study (art. 5 and 6).
  2. Sample discharges with an accredited lab.
  3. Compare results with art. 20, or art. 21 if you are a new generator.
  4. Check current stage dates and the status of the court challenge with MARN.
  5. Follow municipal waste rules and set hauler contracts; the national waste regulation was annulled in 2025.

Common traps

  • The art. 20 dates in the compiled copy we read (2011, 2015, 2020 and 2024) have been moved by amending agreements. Do not rely on a stage date without confirming it with MARN.
  • The court measure on Acuerdo 236-2006 concerns articles aimed at municipalities; we found no official text of the ruling, so do not assume it suspends private generators' limits.
  • Acuerdo 164-2021 was annulled in August 2025. Contracts, policies or audits that still cite its three way sorting duty need updating.
  • Municipal rules can add to these duties.

Sources

Related pages

Related: Guatemala country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.