The LatAm Thread

Countries › Honduras › Guide › 13. Regulation › Environmental licensing in Honduras: SINEIA categories 1 to 4, the 2021 categorization table, public notice and fines up to L1,000,000

Environmental licensing in Honduras: SINEIA categories 1 to 4, the 2021 categorization table, public notice and fines up to L1,000,000

Last verified: 2026-11-03 · Status: Stable

Under the Ley General del Ambiente (Decreto 104-93) every project or activity that may pollute or degrade the environment needs a prior environmental impact assessment, and every project needs an environmental license from MiAmbiente. The SINEIA regulation sorts projects into categories 1 (low) to 4 (very high impact) using the 2021 categorization table; activities below category 1 need no license. Category 4 adds a full impact study, press and radio notices and 30 business days of public access. Administrative fines run from L1,000 to L1,000,000.

USD figures use L26.9080 per US dollar, the Banco Central de Honduras reference exchange rate (buying) for 3 November 2026, from the BCH daily dollar price series retrieved on the verification date. Conversions are for orientation only.

Key facts

Prior environmental impact assessment requiredYes, for activities that may pollute or degrade textDecreto 104-93 art. 5, as of 1993-06-30 · in force
Environmental license categories4 categoriesSINEIA art. 30, as of 2019-08-21 · in force
Maximum administrative environmental fine1000000 HNLDecreto 104-93 art. 97, as of 1993-06-30 · in force
Minimum administrative environmental fine1000 HNLDecreto 104-93 art. 97, as of 1993-06-30 · in force
Public access to category 4 impact study30 business daysSINEIA art. 28, as of 2019-08-21 · in force
Hotel rooms at which category 1 licensing starts25 roomsAM 705-2021 item 293, as of 2021-05-10 · in force

The rule

1. Projects, industrial facilities or any public or private activity that may pollute or degrade the environment, natural resources or historic and cultural heritage must be preceded by an environmental impact assessment; the protection measures that result are binding during construction and the useful life of the works.Decreto Nº 104-93, Ley General del Ambiente (La Gaceta Nº 27,083), Art. 5, 1993-06-30 official text · verified 2026-11-03
2. All public or private projects, works or activities must hold an environmental operating license. The Simplified Environmental Licensing System (SLAS) categorizes the project online, gives pre feasibility, lists the technical and legal requirements and, at the end, issues the admission receipt, the compliance contract for mitigation measures and the license. Where the system sends a project to consultation, MiAmbiente's Consultative Committee defines the procedure within 10 business days.Acuerdo Ejecutivo Nº 008-2015, Reglamento del SINEIA, as reformed by Acuerdo Ejecutivo Nº 005-2019 (La Gaceta Nº 35,028), Art. 3(55), 11-A and 24, 2019-08-21 official text · verified 2026-11-03
3. Projects are placed in four categories by size and potential impact or risk: 1 low, 2 moderate, 3 high, 4 very high (megaprojects are category 4). Activities below category 1 are very low impact, need no license and may ask for a certificate that no license is required. Projects in environmentally fragile or protected areas follow the area's management plan or need the competent agency's opinion before the license.Reglamento del SINEIA as reformed by Acuerdo Ejecutivo Nº 005-2019, Art. 30, 2019-08-21 official text · verified 2026-11-03
4. The categorization table, organized by ISIC (CIIU Rev. 4) codes, is issued by ministerial agreement and reviewed at least every four years; the applicant must show that the project belongs to the category claimed, and unlisted activities are categorized by MiAmbiente on written request.Acuerdo Ministerial Nº 705-2021, Tabla de Categorización Ambiental (La Gaceta Nº 35,595), Art. 16 and 19, 2021-05-10 official text · verified 2026-11-03
5. For hotels, lodges, resorts and country clubs the table sets 25 to 50 rooms as category 1, 51 to 100 rooms as category 2 and more than 100 rooms as category 3; permanent amusement parks of 5 to 10 hectares are category 2 and above 10 hectares category 3; golf courses of 5 hectares or more are category 3; community solar or wind micro grids up to 1 MW are listed in category 1.Acuerdo Ministerial Nº 705-2021, Annex 3, items 219, 220, 293, 294 and 296, 2021-05-10 official text · verified 2026-11-03
6. For category 4, the proponent publishes notices in a national and a local newspaper and on national and local radio when the impact study starts, posts a sign at the site, publishes the results again (radio three times a day for five days) and makes a printed copy of the study available to the public for 30 business days, preferably at the municipal environmental unit. Neighbors must be involved as early as possible in preparing the study.Reglamento del SINEIA as reformed by Acuerdo Ejecutivo Nº 005-2019, Art. 26, 28 and 59, 2019-08-21 official text · verified 2026-11-03
7. Before the license is issued, the proponent must post an economic guarantee of compliance with the mitigation measures set by MiAmbiente; public sector projects post a guarantee certificate and their private contractors a bank guarantee.Acuerdo Ejecutivo Nº 011-2016 (La Gaceta Nº 34,245), amending art. 33 of the SINEIA regulation, Art. 33, 2017-01-21 official text · verified 2026-11-03
8. If a licensed project is sold, leased, transferred or inherited, the new owner must prove the assignment of the license to MiAmbiente by public deed and takes on the obligations in its resolutions. Expansions within 100 meters of the original project limits are notified with a technical report.Reglamento del SINEIA as reformed by Acuerdo Ejecutivo Nº 005-2019, Art. 13 and 50, 2019-08-21 official text · verified 2026-11-03
9. Administrative infractions, including operating potentially polluting activities without the required licenses or permits, obstructing inspections and giving false data, are fined L1,000 to L1,000,000 by gravity, plus possible suspension, closure and confiscation; sanctions weigh gravity, recurrence, social and economic impact and the offender's proven economic capacity.
Cost to do it: L1,000 to L1,000,000 (US$37.16 to US$37,163.67).
Example: Operating a category 2 plant without a license: up to L1,000,000 plus suspension. / Up to about US$37,164.Decreto Nº 104-93, Art. 87, 88, 96 and 97, 1993-06-30 official text · verified 2026-11-03
10. Importing, manufacturing or recycling lead acid batteries is not prohibited if a lawfully operating, certified recycling industry exists; companies handling Basel Convention listed products or wastes must register with MiAmbiente, and unregistered battery imports for recycling are treated as unauthorized transboundary movement.Decreto Nº 80-2020 (La Gaceta Nº 35,546), interpreting the Ley General del Ambiente, Art. 1 and 2, 2021-03-17 official text · verified 2026-11-03
CategoryImpact or riskHotel exampleWhat the file needs
Below 1Very lowUnder 25 roomsNo license; optional certificate of not requiring one
1Low25 to 50 roomsSLAS online file and license
2Moderate51 to 100 roomsSLAS file with technical documents
3HighMore than 100 roomsEnvironmental impact or audit study by registered consultants
4Very high, megaprojectsNot listed for hotelsFull impact study, five copies, press and radio notices, 30 business days of public access

SINEIA categories (Reglamento art. 30) with sample thresholds from the 2021 table

Worked example

  • A 60 room beach hotel is category 2. The developer files through the SLAS with a registered environmental consultant, posts the mitigation guarantee and signs the compliance contract before the license. Building without it exposes the project to fines up to L1,000,000 (US$37,164) and suspension. A 120 room resort would be category 3 and needs a full impact study.

Step by step

  1. 1. Find the project's ISIC code and size parameter in the 2021 categorization table; if absent, request a category from MiAmbiente in writing.
  2. 2. Hire a consultant registered with MiAmbiente; they are jointly liable for the data filed.
  3. 3. File through the SLAS; for categories 3 and 4 prepare the study and the public notices and consultation.
  4. 4. Post the mitigation guarantee and sign the compliance contract to obtain the license.
  5. 5. On acquisition of a licensed project, record the license assignment by public deed.

Common traps

  • The table measures size by parameters such as rooms, square meters or megawatts; a phased project may cross a category line in a later phase.
  • Sites in protected or fragile areas need the managing agency's opinion first, which adds time.
  • Buying a project without assigning its license leaves the buyer exposed to the seller's unmet mitigation measures.
  • Criminal environmental offences are now governed by the 2019 Penal Code, so the old criminal articles of Decreto 104-93 should not be relied on alone.

Sources

Related pages

Related: Honduras country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.