Countries › Mexico › Guide › 12. Sectors › Sectors in Mexico: foreign ownership caps by activity, electricity under the 2025 Electricity Sector Law, oil and gas through Pemex mixed contracts, mining concessions and duties, and telecom concessions
Sectors in Mexico: foreign ownership caps by activity, electricity under the 2025 Electricity Sector Law, oil and gas through Pemex mixed contracts, mining concessions and duties, and telecom concessions
Last verified: 2026-10-26 · Status: Changing
Most of the Mexican economy is open to 100 percent foreign ownership, but a short list of activities is reserved to the State or to Mexicans, a few carry 10 or 49 percent caps, and others need Foreign Investment Commission approval above 49 percent. The 2024 constitutional energy reform and the laws of 18 March 2025 keep oil and gas exploration and the power grid with the State: private power plants need a permit from 0.7 MW, the State keeps at least 54 percent of energy injected into the grid, and private oil companies enter mainly through Pemex mixed contracts in which Pemex holds at least 40 percent. Mining concessions now last 30 years plus one 25 year extension, are granted only by public tender and never for lithium, and pay an 8.5 percent special duty on mining profit, a 1 percent duty on gold, silver and platinum sales and a fee per hectare; telecom has no foreign cap, while broadcasting is capped at 49 percent.
USD conversions use MXN 18.5026 per US dollar, the US Federal Reserve H.10 noon buying rate in New York for 16 October 2026 (FRED series DEXMXUS), the latest observation available when this page was verified. Legal conversions in Mexico use the Banxico FIX, which differs slightly. Conversions are for orientation only.
Key facts
| Default foreign ownership limit in activities not listed in the Foreign Investment Law | 100 %LIE art. 4, as of 2026-10-26 · in force |
|---|---|
| Foreign ownership cap in broadcasting | 49 %LIE art. 7, section III, item x), as of 2026-10-26 · in force |
| Foreign ownership cap in domestic air transport | 49 %LIE art. 7, section III, item y), as of 2026-10-26 · in force |
| Foreign ownership allowed in domestic land transport of passengers and freight | 0 %LIE art. 6, section I, as of 2026-10-26 · in force |
| Minimum State share of average energy injected into the grid per calendar year | 54 %Ley del Sector Eléctrico art. 12, section VI, as of 2026-10-26 · in force |
| Plant capacity from which a generation permit is required | 0.7 MWLey del Sector Eléctrico art. 19, as of 2026-10-26 · in force |
| Minimum CFE stake in a mixed investment power project | 54 %Ley del Sector Eléctrico art. 40, section I, as of 2026-10-26 · in force |
| Minimum Pemex participating interest in a mixed contract | 40 %Ley del Sector Hidrocarburos art. 31, as of 2026-10-26 · in force |
| Cost recovery cap in a mixed assignment, share of revenue (up to 40 percent with approval) | 30 %Ley del Sector Hidrocarburos art. 30, as of 2026-10-26 · in force |
| Mining concession term | 30 yearsLey de Minería art. 15, as of 2026-10-26 · in force |
| Single mining concession extension | 25 yearsLey de Minería art. 15, as of 2026-10-26 · in force |
| Special mining duty on mining profit | 8.5 %Ley Federal de Derechos art. 268, as of 2026-10-26 · in force |
| Extraordinary mining duty on gold, silver and platinum sales | 1 %Ley Federal de Derechos art. 270, as of 2026-10-26 · in force |
| Mining fee per hectare each half year from year 11 of the concession, 2026 | 230.41 MXNLey Federal de Derechos art. 263, section VI; RMF 2026 Annex 4, as of 2026-10-26 · in force |
| Lithium concessions available to private parties | No Ley de Minería art. 5 Bis; Constitution art. 27, as of 2026-10-26 · in force |
| Maximum term of a telecom single concession, renewable | 30 yearsLey en Materia de Telecomunicaciones y Radiodifusión art. 51, as of 2026-10-26 · in force |
The rule
Cost to do it: No fee to invest in an open activity. Where art. 8 applies, the investor files for a Foreign Investment Commission resolution before exceeding 49 percent; see investing/overview for the procedure and the general asset threshold for CNIE review under art. 9.
Example: A US group buying 100 percent of a Mexican auto parts maker, a data center operator or a mobile network needs no sector approval. Buying 60 percent of a Mexican private university or a rail operator needs a prior CNIE resolution; buying more than 49 percent of a domestic airline or a radio station is not allowed. / The caps are percentages, so they bind the same way whatever the deal size, for example a USD 50 million stake in a MXN 1,000 million (about USD 54 million) company.Ley de Inversión Extranjera (LIE), DOF 27 December 1993, art. 5 reformed DOF 11 August 2014, art. 7 reformed DOF 26 June 2017, last reform of the law DOF 27 May 2024 (Chamber of Deputies consolidated text), Arts. 5, 6, 7 and 8, 2017-06-26 official text · verified 2026-10-26
Cost to do it: Before building, the project also needs an energy sector social impact assessment (MIS), which the Ministry of Energy must decide within 90 calendar days (LSE art. 139). CNE permit fees are not stated here because the fee schedule in the Ley Federal de Derechos (art. 56) still refers to the former regulator and the former permit categories.
Example: A manufacturer in Nuevo León installs a 15 MW rooftop and ground solar plant for its own plant, interconnected to the grid. At 15 MW it needs a CNE generation permit, but it falls within the 0.7 to 20 MW band eligible for the simplified self supply procedure. A 0.5 MW rooftop system would need no generation permit. / The thresholds are in megawatts, so they apply whatever the project cost, for example a 15 MW plant costing on the order of USD 10 million to USD 15 million.Constitución Política, art. 27, sixth paragraph, and art. 28, reformed DOF 31 October 2024; Ley del Sector Eléctrico (LSE), new law DOF 18 March 2025, in force the following day; Reglamento de la Ley del Sector Eléctrico, DOF 3 October 2025, LSE arts. 12, 16 to 20, 30, 35, 38 to 40 and transitory articles Quinto and Noveno; Reglamento art. 73, 2025-03-18 official text · verified 2026-10-26 · changed: The LSE of 18 March 2025 repealed the Ley de la Industria Eléctrica of 2014, moved permitting to the new National Energy Commission, wrote the 54 percent State share into law and created the long term production and mixed investment schemes. Its regulation followed on 3 October 2025.
Cost to do it: Permit fees and hydrocarbon duties are outside this page; the key economic terms of a mixed contract are the 40 percent minimum Pemex interest and the 30 percent cost recovery cap (40 percent with approval).
Example: A field produces MXN 1,000 million of hydrocarbons in a year under a mixed contract with a 60 percent private partner. After the assignment's taxes, at most MXN 300 million can go to cost recovery under the 30 percent cap; the remaining revenue is split 40 percent to Pemex and 60 percent to the partner. / MXN 1,000 million is about USD 54.0 million; the 30 percent cost recovery cap is about USD 16.2 million.Constitución Política, art. 27, seventh paragraph, reformed DOF 31 October 2024; Ley del Sector Hidrocarburos (LSH), new law DOF 18 March 2025, LSH arts. 6, 24, 30, 31, 37, 39, 40 and 76, 2025-03-18 official text · verified 2026-10-26 · changed: The LSH of 18 March 2025 repealed the Ley de Hidrocarburos of 11 August 2014 and the administrative rules on tenders for exploration and extraction contracts. Pemex mixed assignments with a 40 percent Pemex floor became the main route for private capital and State contracts became exceptional.
Cost to do it: Per hectare mining fee and mining duties are set out in the next rule. Tender terms, including any economic consideration offered, are set in each tender's bases (art. 13 Bis).
Example: A Canadian group wants to mine copper in Sonora. It sets up a Mexican S.A. de C.V. with a mining corporate purpose, wins the Ministry of Economy tender for the lot, registers the title and has until year 5 for pre operational work. If it wants to operate past year 30, it applies for the single 25 year extension between years 28 and 29. / Term limits are in years, so they apply whatever the investment, for example a USD 500 million (about MXN 9,251 million) copper project.Ley de Minería (formerly Ley Minera), DOF 26 June 1992, reformed DOF 8 May 2023 (Chamber of Deputies consolidated text); Constitución Política, art. 27, sixth paragraph, Ley de Minería arts. 5 Bis, 10, 11, 13 and 15, 2023-05-08 official text · verified 2026-10-26 · changed: The reform of DOF 8 May 2023 set the concession term at 30 years plus one 25 year extension, made public tenders the only way to obtain a concession, tied extensions to having an industrial water concession, required community agreements and renamed the law Ley de Minería; the lithium reservation (art. 5 Bis) was added by DOF 20 April 2022.
Cost to do it: 2026 per hectare fee each half year (LFD art. 263, RMF 2026 Annex 4): MXN 10.52 in years 1 and 2, MXN 15.76 in years 3 and 4, MXN 32.55 in years 5 and 6, MXN 65.47 in years 7 and 8, MXN 130.94 in years 9 and 10 and MXN 230.41 from year 11 (about USD 0.57 to USD 12.45 per hectare).
Example: A miner in its 12th concession year holds 5,000 hectares and has taxable income from sales of MXN 1,000 million, of which MXN 800 million is gold and silver, and allowed deductions of MXN 600 million. Special duty: 8.5 percent of MXN 400 million, MXN 34,000,000. Extraordinary duty: 1 percent of MXN 800 million, MXN 8,000,000. Per hectare fee: MXN 230.41 times 5,000, MXN 1,152,050 each half year, MXN 2,304,100 a year. Total mining duties: MXN 44,304,100, on top of 30 percent corporate income tax. / Special duty about USD 1,837,580; extraordinary duty about USD 432,372; per hectare fees about USD 124,528 a year; total about USD 2,394,480.Ley Federal de Derechos (LFD), arts. 268 and 270 reformed DOF 19 December 2024 (rate of 8.5 percent and March deadline), last reform of the law DOF 7 November 2025; 2026 amounts updated by Resolución Miscelánea Fiscal 2026, Annex 4, DOF 28 December 2025, LFD arts. 263, 264, 268, 269 and 270, 2024-12-19 official text · verified 2026-10-26 · changed: The reform of DOF 19 December 2024 set the special mining duty rate at 8.5 percent and the filing deadline at the last business day of March, for both the special and the extraordinary duty.
Cost to do it: Spectrum considerations are set in each tender; concession and spectrum fees are in the Ley Federal de Derechos and are not detailed on this page.
Example: A US fiber operator can own 100 percent of a Mexican S.A. de C.V. that obtains a commercial concesión única for up to 30 years. A US media group can hold at most 49 percent of a Mexican radio concessionaire, and only with a prior CNIE opinion. / The caps are percentages and apply whatever the investment size.Ley en Materia de Telecomunicaciones y Radiodifusión (LMTR), new law DOF 16 July 2025, repealing the Ley Federal de Telecomunicaciones y Radiodifusión of 2014, LMTR arts. 50, 51, 56 and 57; LIE art. 7, section III, item x), 2025-07-16 official text · verified 2026-10-26 · changed: The LMTR of 16 July 2025 replaced the 2014 law and moved regulation from the autonomous Federal Telecommunications Institute to the new Commission and Agency.
| Sector | Foreign ownership | Main route for private capital | Licensing authority | Rule |
|---|---|---|---|---|
| Manufacturing, services, retail, technology | Up to 100 percent | Ordinary company; CNIE review only above the general asset threshold | None sector specific | LIE arts. 4 and 9 |
| Electricity generation | Up to 100 percent in the private company | Self supply, distributed generation, wholesale market plants, or mixed schemes with CFE (CFE at least 54 percent in mixed investment) | National Energy Commission (permit from 0.7 MW); Ministry of Energy for planning and imports or exports | LSE arts. 12, 17 to 20 and 38 to 40 |
| Electricity transmission and distribution | Reserved to the State | No concessions | Not applicable | Constitution art. 27; LIE art. 5, section III |
| Oil and gas exploration and production | Through contracts only; subsoil owned by the Nation | Pemex mixed contracts (Pemex at least 40 percent); exceptional State contracts | Ministry of Energy | LSH arts. 6, 24, 31 and 37 |
| Fuel and gas transport, storage, distribution and retail | Up to 100 percent | Permits | Ministry of Energy or National Energy Commission | LSH art. 76 |
| Mining (except lithium and radioactive minerals) | Up to 100 percent in a Mexican company | Concession won by public tender, 30 plus 25 years | Ministry of Economy | Ley de Minería arts. 11, 13 and 15 |
| Lithium and radioactive minerals | Reserved to the State | No concessions | Not applicable | Constitution art. 27; Ley de Minería art. 5 Bis |
| Telecommunications | Up to 100 percent | Single concession up to 30 years; spectrum by tender | Telecommunications Regulatory Commission | LMTR arts. 50, 51 and 57 |
| Broadcasting | Up to 49 percent, with reciprocity | Single concession; prior CNIE opinion if foreign capital | Telecommunications Regulatory Commission | LIE art. 7; LMTR art. 56 |
| Domestic air transport | Up to 49 percent | Ordinary company within the cap | Not covered on this page | LIE art. 7, section III, item y) |
| Railways, private education, legal services, public aerodromes | Above 49 percent with CNIE approval | Ordinary company | Foreign Investment Commission | LIE art. 8 |
| Domestic land passenger and freight transport | Mexicans only | Mexican company with foreigners exclusion clause | Not applicable | LIE art. 6 |
Who may invest in which Mexican sector, verified 26 October 2026 against the official texts cited on this page.
Worked example
- A US investor compares two Mexican projects of MXN 1,000 million each (about USD 54.0 million). A 100 percent owned auto parts plant in Coahuila needs no sector approval and may add a 15 MW self supply solar plant with a CNE permit under the simplified 0.7 to 20 MW procedure (LSE arts. 19 and 30). A gas field interest, by contrast, can only be held through a Pemex mixed contract in which Pemex keeps at least 40 percent and cost recovery is capped at 30 percent of revenue (LSH arts. 30 and 31).
- A gold and silver miner in its 12th concession year with 5,000 hectares, MXN 1,000 million of sales (MXN 800 million gold and silver) and MXN 600 million of allowed deductions pays MXN 34,000,000 special duty, MXN 8,000,000 extraordinary duty and MXN 2,304,100 in per hectare fees, MXN 44,304,100 in total (about USD 2,394,480), before 30 percent corporate income tax (LFD arts. 263, 268 and 270).
Step by step
- 1. Classify the activity against LIE arts. 5 to 8: open, State reserved, Mexicans only, capped, or CNIE approval above 49 percent. This decides the ownership structure before anything else.
- 2. Set up the Mexican vehicle with the right corporate purpose (a mining corporate purpose is a legal condition for a mining concession) and register foreign investment in the RNIE; see entities/choosing-an-entity and investing/overview.
- 3. Electricity: confirm the plant fits the Ministry of Energy binding plan, file the energy social impact assessment (decision within 90 calendar days, LSE art. 139), then the CNE generation permit if 0.7 MW or more, and the interconnection request.
- 4. Oil and gas upstream: engage with Pemex on a mixed assignment or watch for an exceptional Ministry of Energy tender; for midstream or retail, apply for the Ministry or CNE permit under LSH art. 76.
- 5. Mining: follow Ministry of Economy tender calls, negotiate any community agreement required, register the title in the Public Mining Registry, then obtain environmental, water and local permits and notify each within 15 business days.
- 6. Calendar recurring charges: mining fees in January and July, special and extraordinary mining duties by the last business day of March, and permit or concession renewal windows (mining extension request between two years and one year before expiry).
Common traps
- Using a trust, shareholder agreement or pyramid structure to exceed a cap or enter a Mexicans only activity. LIE arts. 6 and 7 expressly bar any mechanism that gives control or a larger stake.
- Assuming an old self supply or 2014 law permit can be renewed. Permits under the former electricity laws stay valid only until they expire and cannot be extended (LSE transitory articles Quinto and Noveno); plan migration to the new routes.
- Building a power plant before the social impact assessment is approved. LSE art. 139 requires the definitive MIS authorization before work on related infrastructure starts.
- Expecting an oil block in your own name. Mixed assignments stay with Pemex, which cannot transfer them (LSH art. 24); the partner's rights are contractual.
- Missing the mining extension window. The request must be filed between two years and one year before expiry and needs an industrial water concession in place (Ley de Minería art. 15).
- Treating the special mining duty as income tax. It is a separate 8.5 percent charge with its own base that denies interest and most investment deductions (LFD art. 268).
- Holding idle hectares. Two continuous years without work triggers the additional per hectare duty of 50 percent, then 100 percent, of the top fee (LFD art. 269).
Sources
- Ley de Inversión Extranjera, Chamber of Deputies consolidated text
- Ley de Inversión Extranjera, last reform DOF 27 May 2024 (copy consulted)
- Constitución Política de los Estados Unidos Mexicanos, Chamber of Deputies consolidated text
- Constitución Política, last reform DOF 7 October 2026 (copy consulted)
- Ley del Sector Eléctrico, DOF 18 March 2025, Chamber of Deputies text
- Ley del Sector Eléctrico (copy consulted)
- Reglamento de la Ley del Sector Eléctrico, DOF 3 October 2025, Chamber of Deputies text
- Reglamento de la Ley del Sector Eléctrico (copy consulted)
- Ley del Sector Hidrocarburos, DOF 18 March 2025, Chamber of Deputies text
- Ley del Sector Hidrocarburos (copy consulted)
- Ley de Minería, last reform DOF 8 May 2023, Chamber of Deputies text
- Ley de Minería (copy consulted)
- Ley Federal de Derechos, last reform DOF 7 November 2025, Chamber of Deputies text
- Ley Federal de Derechos (copy consulted)
- SAT, Resolución Miscelánea Fiscal 2026, Annex 4, DOF 28 December 2025
- Ley en Materia de Telecomunicaciones y Radiodifusión, DOF 16 July 2025, Chamber of Deputies text
- Ley en Materia de Telecomunicaciones y Radiodifusión (copy consulted)
- US Federal Reserve H.10 via FRED, Mexican pesos to one US dollar (DEXMXUS)
Related pages
- investing/overview
- entities/choosing-an-entity
- taxes/overview
- trade/overview
- real-estate/overview
- labor/overview
- start/start-here
- /country/mexico/
- /calendar/
- /dashboard/
- https://theargentinethread.com/guide/
Related: Mexico country profile · live dashboard · central bank and release calendar · our posts on X