Countries › Peru › Guide › 12. Sectors › Renewable power in Peru: what counts as RER, priority dispatch, Osinergmin premium auctions, accelerated depreciation and the end of the 5 percent target
Renewable power in Peru: what counts as RER, priority dispatch, Osinergmin premium auctions, accelerated depreciation and the end of the 5 percent target
Last verified: 2026-10-28 · Status: Changing
Peru's renewable energy regime (RER) covers biomass, wind, solar, geothermal and tidal power and hydro plants up to 20 MW. RER plants are dispatched first by the system operator COES as if their variable cost were zero, and get priority access to spare grid capacity. Osinergmin can auction premiums for RER projects, paid through a surcharge on the transmission connection toll, so that winning plants earn the market price plus a premium up to their awarded tariff. Hydro and other renewable plants may also depreciate plant and civil works at up to 20 percent a year for income tax. Ley 32249 of January 2025 repealed the five yearly target share for renewables in national consumption, so new projects compete mainly in distributor tenders and free contracts rather than in target driven auctions.
USD figures use S/ 3.452 per US dollar, the banking system selling rate published by the Superintendencia de Banca, Seguros y AFP for 27 October 2026, from the Banco Central de Reserva del Perú statistics series PD04640PD. UIT based amounts use the 2026 UIT of S/ 5,500 set by Decreto Supremo Nº 301-2025-EF, as cited in SUNAT Resolución de Superintendencia Nº 000016-2026/SUNAT. Conversions are for orientation only.
Key facts
| Maximum hydro capacity counted as renewable energy resource (RER) | 20 MWDL 1002 art. 3, as of 2026-10-28 · in force |
|---|---|
| Maximum annual accelerated depreciation for hydro and renewable plants | 20 %DL 1058 art. 1, as of 2026-10-28 · in force |
| Five yearly RER target share in national consumption (repealed) | up to 5 %DL 1002 art. 2.2, repealed by Ley 32249, as of 2026-10-28 · repealed |
The rule
Cost to do it: No fee in the decree; concession and EIA costs follow the electricity concessions regime.
Example: A 15 MW run of river plant in Junín qualifies as RER; a 60 MW hydro plant does not and follows the general regime. / A US$25 million 20 MW hydro plant is at the RER ceiling; at 21 MW it falls outside.Decreto Legislativo Nº 1002, promoción de la inversión para la generación de electricidad con el uso de energías renovables (published 2 May 2008), Osinergmin copy, Art. 1 and 3, 2008-05-02 official text · verified 2026-10-28
Cost to do it: No fee; the premium is funded by consumers (rule 3).
Example: A wind farm with an awarded tariff above the hourly marginal cost receives the market price plus the premium needed to reach its tariff. / Priority dispatch means a solar plant runs whenever the sun shines, regardless of gas prices.Decreto Legislativo Nº 1002, promoción de la inversión para la generación de electricidad con el uso de energías renovables (published 2 May 2008), Osinergmin copy, Art. 5, 2008-05-02 official text · verified 2026-10-28
Cost to do it: Bid bonds and terms are set in each auction's rules; connection costs are part of the bid.
Example: An auction winner builds its own line to the nearest SEIN substation because the bid price had to include it. / Consumers fund the premium through the connection toll surcharge, so auction volumes are a policy choice.Decreto Legislativo Nº 1002, promoción de la inversión para la generación de electricidad con el uso de energías renovables (published 2 May 2008), Osinergmin copy, Art. 7, 2008-05-02 official text · verified 2026-10-28
Cost to do it: No fee.
Example: After January 2025 the Ministry no longer sets five yearly RER targets, so the cap on priority connection in art. 8, which is tied to that target, has lost its reference. / Investors should treat priority grid access as uncertain and secure connection capacity contractually.Decreto Legislativo Nº 1002, promoción de la inversión para la generación de electricidad con el uso de energías renovables (published 2 May 2008), Osinergmin copy; Ley Nº 32249 (El Peruano 19 January 2025), sole repealing provision, DL 1002 art. 2 and 8; Ley 32249 sole repealing provision, 2025-01-19 official text · verified 2026-10-28 · changed: Ley 32249 repealed DL 1002 art. 2.2 (five yearly RER target, up to 5 percent in the first five years).
Cost to do it: No fee; notify SUNAT of the rate chosen each year.
Example: A solar plant costing S/ 345,200,000 can deduct up to S/ 69,040,000 a year, worth about S/ 20,366,800 of income tax a year at 29.5 percent, so the cost is recovered for tax over five years. / For a US$100 million plant: up to US$20 million a year of depreciation, about US$5.9 million a year of tax deferral at 29.5 percent.Decreto Legislativo Nº 1058 (El Peruano 28 June 2008), original text, Art. 1, 2008-06-28 official text · verified 2026-10-28
Worked example
- A US$100 million (about S/ 345,200,000) solar plant in Moquegua gets a definitive concession (above 500 kW), is dispatched first by COES, sells to a mining company under a free price contract or to distributors in a tender, and depreciates the plant at up to 20 percent a year, deferring about S/ 20,366,800 (about US$5.9 million) of income tax a year in the first five years.
Step by step
- Confirm the plant qualifies as RER (hydro only up to 20 MW) and seek accreditation with MINEM to use the regime (DL 1002 art. 1 and 3).
- Obtain a definitive concession if above 500 kW and the environmental certification.
- Choose the route to market: Osinergmin premium auction when called, distributor tenders under Ley 28832, or free price contracts.
- Secure grid capacity; priority connection is no longer tied to a live target after Ley 32249.
- Notify SUNAT each year of the accelerated depreciation rate used (DL 1058 art. 1).
Common traps
- Hydro above 20 MW is not RER, so it gets neither priority dispatch as RER nor the premium regime (DL 1002 art. 3).
- Accelerated depreciation applies only to assets acquired or built after DL 1058 took effect and to plants entering operation after that date.
- Premiums are only available through Osinergmin auctions; there is no open feed in tariff.
Sources
- DL 1002, Osinergmin copy on gob.pe
- DL 1058, El Peruano 28 June 2008, MINEM copy on gob.pe
- Ley 32249, Congress consolidated text
- DL 25844 consolidated copy (art. 3 RER concession)
Related pages
- sectors/electricity-market
- sectors/mining-energy-and-key-sectors
- taxes/tax-incentives
- taxes/corporate-income-tax
- /country/peru/
- Live dashboard
Related: Peru country profile · live dashboard · central bank and release calendar · our posts on X
Get rule changes weekly
Free. One email a week from The LatAm Thread.
One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.