The National Assembly approved the electricity reform in first discussion on 2 June 2026 and sanctioned it on 10 November 2026. As reported by the Assembly, it opens self generation and supply to large consumers to private parties, creates a Superintendencia and sets fines of up to 2 percent of gross income. It is not law until promulgated and published in the Gaceta Oficial, and the Assembly has not published the sanctioned text.

Key facts

Sanctioned reform: maximum fine for serious operator breaches2 % of prior year gross incomeSanctioned reform of the LOSSE, art. 102, as of 2026-11-10 · pending
Sanctioned reform: deadline for the regulation180 daysSanctioned reform of the LOSSE, transitional provisions, as of 2026-11-10 · pending
Self generation authorisation threshold, law in force2 MWLOSSE, G.O. 39.573, art. 46, as of 2010-12-14 · in force

The rule

1. Sanctions first. Even if the bill passes, GL 48D bars new joint ventures or entities in Venezuela for electricity, and GL 49B allows only contingent contracts. Performance needs separate OFAC authorisation.OFAC General License 49B, Para. (a), 2026-09-28 official text · verified 2026-11-01
2. First discussion: the Assembly approved the reform unanimously on 2 June 2026. Its sponsor described a 42 article bill that brings mixed and private capital into generation, transmission, distribution and sale under a concession regime, with mixed companies in which the Republic keeps more than 50 percent of the capital.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, first discussion, Asamblea Nacional note, Plenary session of 2 June 2026, 2026-06-02 official text · verified 2026-11-15
3. Status: second discussion began on 22 October 2026 and ran over four ordinary sessions. The Assembly sanctioned the reform on 10 November 2026 and sends it to the Executive for promulgation. We found no Gaceta Oficial publication at our last check.Asamblea Nacional note on the sanction, Plenary session of 10 November 2026, 2026-11-10 official text · verified 2026-11-15 · changed: Sanctioned in second discussion on 10 November 2026; until then it had passed only first discussion (2 June 2026).
4. Second discussion text: the State keeps exclusive reservation of hydroelectric generation in the Caroní, Paragua and Caura river basins and the Uribante Caparo complex, plus trunk transmission networks, distribution of national interest and dispatch.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, second discussion, Asamblea Nacional note, Art. 6 as approved on 22 October 2026, 2026-10-22 official text · verified 2026-11-11
5. The electricity ministry leads the sector. Among its powers: setting public policy, approving the national development plan, fixing tariffs together with the finance area, and granting operating concessions.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, second discussion, Asamblea Nacional note, Arts. 12 and 13 as approved on 22 October 2026, 2026-10-22 official text · verified 2026-11-15
6. A new regulator, the Superintendencia del Sistema Eléctrico Nacional, is created as a public institute with its own legal personality and technical, financial and management autonomy. Its head is freely appointed and removed by the Executive, assisted by a five member board.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, second discussion, Asamblea Nacional note, Arts. 15 and 16 as approved on 3 November 2026, 2026-11-03 official text · verified 2026-11-15
7. Private operators carry the same obligations as Corporación Eléctrica Nacional, with a right to economic remuneration and to access transmission and distribution networks on payment of a toll set by the Superintendencia. Generators must declare all their capacity to the Centro Nacional de Gestión del Sistema Eléctrico, and distributors must compensate users for service deficiencies.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, second discussion, Asamblea Nacional note, Articles approved on 3 November 2026, incl. art. 22, 2026-11-03 official text · verified 2026-11-15
8. Corporación Eléctrica Nacional stays the State operator. It may set up subsidiaries or sign public private partnership, rehabilitation and maintenance contracts over its facilities without giving up public ownership of the assets, and such contracts do not pass its earlier labour, environmental or tax liabilities to the new operator.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, second discussion, Asamblea Nacional note, Art. 23 as approved on 3 November 2026, 2026-11-03 official text · verified 2026-11-15
9. Private role as explained in plenary by the Assembly president: private parties may self generate, install a plant or import electricity and supply users at tariffs set under the law, aimed at large consumers such as industry and shopping centres, while the State keeps the networks and the duty to serve households. Tariffs are to be indexed to the highest value currency, with a social tariff and subsidies that a regulation will develop through the Superintendencia.Ley Orgánica de Reforma Parcial de la LOSSE, sanctioned text as reported by the Asamblea Nacional, Art. 64 and tariff provisions, as explained in plenary, 2026-11-10 official text · verified 2026-11-15
10. Oil producers must secure their own power through self generation or contracts with third parties, and may use companies with an exclusive purpose that supply only those facilities under the ministry's authorisation. Connecting these systems to the national grid needs prior authorisation from the Superintendencia, and surplus power goes through the Centro Nacional de Gestión. The bill under second discussion had 119 articles.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, second discussion, Asamblea Nacional note, Arts. 77, 78 and 80 as approved on 5 November 2026, 2026-11-05 official text · verified 2026-11-15
11. Users with demand above 2 MW must implement specific energy saving plans.Proyecto de Ley Orgánica de Reforma Parcial de la LOSSE, second discussion, Asamblea Nacional note, Art. 35 as approved on 5 November 2026, 2026-11-05 official text · verified 2026-11-15
12. Operator fines reach 2 percent of the prior year's gross income for serious breaches, such as repeated breach of quality rules, unjustified refusal of network access or altering supply or tariffs, and 0.2 percent for less serious ones, such as occasional operating irregularities or late settlement of market transactions.
Example: On Bs 100,000,000 of prior year gross income, up to Bs 2,000,000 at 2 percent and Bs 200,000 at 0.2 percent. / On US$10 million of prior year gross income, up to US$200,000 at 2 percent and US$20,000 at 0.2 percent.Ley Orgánica de Reforma Parcial de la LOSSE, sanctioned text as reported by the Asamblea Nacional, Arts. 102 and 103, 2026-11-10 official text · verified 2026-11-15
13. Self generators face fines of 1,000 to 10,000 times the BCV official rate of the highest value currency, that is the bolívar value of 1,000 to 10,000 units of that currency, for breaches during states of exception or emergencies. Owners of self generation above 2 MW who refuse supply during a state of exception decreed by the Executive lose their administrative authorisation, on top of fines.Ley Orgánica de Reforma Parcial de la LOSSE, sanctioned text as reported by the Asamblea Nacional, Arts. 104 and 105, 2026-11-10 official text · verified 2026-11-15
14. Users face fines of 50 to 50,000 times the same BCV rate for illegal connections, meter tampering, refusing access to authorised staff or clandestinely supplying power to third parties. Unauthorised works that disturb or damage easement zones and electrical installations carry fines of 100 to 10,000 times that rate. Administrative actions and sanctions lapse after five years.Ley Orgánica de Reforma Parcial de la LOSSE, sanctioned text as reported by the Asamblea Nacional, Arts. 106 to 110, 2026-11-10 official text · verified 2026-11-15
15. Stealing electricity for profit through unauthorised connections above 5,000 kWh a month carries two to six years in prison, and stealing equipment used to supply or meter the service carries two to five years.Ley Orgánica de Reforma Parcial de la LOSSE, sanctioned text as reported by the Asamblea Nacional, Arts. 114 and 115, 2026-11-10 official text · verified 2026-11-15
16. Transitional terms: the State operator has five years to normalise supply points, with alternative billing agreed with community organisations for up to two years where meters cannot be installed; two years to update the user database; one year for the Executive to set up the subsidy fund; and 180 days for the regulation.Ley Orgánica de Reforma Parcial de la LOSSE, sanctioned text as reported by the Asamblea Nacional, Transitional provisions, 2026-11-10 official text · verified 2026-11-15
17. Promulgation: the President must promulgate a sanctioned law within 10 days of receiving it, and within that period may ask the Assembly to amend it or lift the sanction, or ask the Constitutional Chamber to rule on its constitutionality. A law is promulgated on publication in the Gaceta Oficial with the Cúmplase.Constitución de la República Bolivariana de Venezuela, G.O. 36.860, Arts. 214 and 215, 1999-12-30 official text · verified 2026-11-15
PointIn force, 2010 lawSanctioned reform, as reported
Private roleSelf generation for own use, authorisation from 2 MW (arts. 45 and 46)Self generation and supply to large consumers; network access on a toll
ReservationArt. 8 reserves generation, transmission, distribution, sale and dispatchHydro in the Caroní, Paragua and Caura basins and Uribante Caparo, trunk transmission, distribution of national interest and dispatch (art. 6)
FinesSet in unidades tributariasUp to 2 or 0.2 percent of gross income, and multiples of the BCV rate
RegulatorMinistryNew Superintendencia del Sistema Eléctrico Nacional

Law in force (LOSSE, G.O. 39.573 of 14 December 2010) against the sanctioned reform as reported by the Asamblea Nacional.

Step by step

  1. Treat the Assembly's description of the sanctioned text as a planning scenario, not a right.
  2. Under GL 49B, keep any term sheet contingent on OFAC authorisation.
  3. Model revenue on the assumption that tariffs, the social tariff and toll rules await the regulation, due within 180 days.
  4. Raise network access, toll, liability transfer and termination terms in your contract.
  5. Read the Gaceta Oficial text once promulgated before relying on any article here.

Common traps

  • The Assembly has not published the sanctioned text; article numbers and terms here come from its official notes and may differ in the gazette text.
  • Figures reported for the first discussion draft differ from the sanctioned text; rely only on the gazette text once published.
  • Sanction by the Assembly is not entry into force: a law is promulgated only on Gaceta Oficial publication.
  • Tariffs, the social tariff and the concession process depend on a regulation that does not exist yet.

Sources

Related pages

Related: Venezuela country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.