Under the 2010 law the State reserves generation, transmission, distribution and sale, through Corpoelec.
Private companies can supply works, goods and services, and can self generate, with a ministry licence from 2 MW.
The Assembly sanctioned a reform opening the chain to private capital on 10 November 2026, but it is not yet in the Official Gazette. This page is the law you must follow today.
Key facts
The rule
1. Sanctions first. GL 48D covers goods and services for generating, transmitting, storing or distributing electricity. GL 49B covers contingent contracts for new investment. GL 48D does not allow new joint ventures or entities to generate, transmit, store or distribute power.
OFAC General License 48D, Paras. (a) and (b)(5), 2026-09-28 official text · verified 2026-11-01 2. The State reserves generation, transmission, distribution and sale through the operator, and dispatch through the electricity ministry, for security, defence, strategy and sovereignty reasons.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 8, 2010-12-14 official text · verified 2026-11-01 3. The operator is Corporación Eléctrica Nacional, S.A. (Corpoelec) or a body created for the purpose, attached to the ministry.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 28, 2010-12-14 official text · verified 2026-11-01 4. Generation, transmission and distribution are carried out exclusively by the operator, and it also carries out sale.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Arts. 43, 48, 50 and 54, 2010-12-14 official text · verified 2026-11-01 5. All activities run under a socialist management model, with participation by workers, users and community organisations.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 9, 2010-12-14 official text · verified 2026-11-01 6. The State may form mixed companies to build works and produce or supply goods and services for the system, keeping at least 60 percent of the capital.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 10, 2010-12-14 official text · verified 2026-11-01 7. The operator must favour Venezuelan talent and goods and services in its contracting.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 10, 2010-12-14 official text · verified 2026-11-01 8. Self generation means power only for the producer's own use, independent of the national grid.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 45, 2010-12-14 official text · verified 2026-11-01 9. Self generation of 2 MW or more needs a ministry licence (habilitación).
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 46, 2010-12-14 official text · verified 2026-11-01 10. In a state of exception, the dispatch body may use self generation capacity of 2 MW or more, and the power supplied is paid for under the law.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 47, 2010-12-14 official text · verified 2026-11-01 11. Generation, transmission, dispatch, distribution and sale are not subject to national, state or municipal taxes.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 57, 2010-12-14 official text · verified 2026-11-01 12. The ministry sets the tariff scheme and must review costs every year. Tariff design also follows national plan guidelines.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Arts. 59, 60 and 62, 2010-12-14 official text · verified 2026-11-01 13. The ministry may require information from anyone in the sector, and they must supply it on time.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 14, 2010-12-14 official text · verified 2026-11-01 14. Cross border power exchanges need ministry approval and must fit system planning.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 12, 2010-12-14 official text · verified 2026-11-01 15. Self generating more than 2 MW without a licence: fine of 5,000 to 10,000 U.T. Paying the fine does not remove the duty to obtain the licence.
Cost to do it: 5,000 to 10,000 U.T. We give no bolívar figure because no official text of the current tax unit value loaded when this page was checked.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Art. 100, 2010-12-14 official text · verified 2026-11-15 16. Owners of self generation plants above 2 MW that refuse to supply power in a declared state of exception: fine of 5,000 to 100,000 U.T., and the licence can also be revoked.
Ley Orgánica del Sistema y Servicio Eléctrico, G.O. 39.573, Defence Ministry copy, Arts. 101 and 102, 2010-12-14 official text · verified 2026-11-11 17. The National Assembly sanctioned a partial reform of this law in second discussion on 10 November 2026. It opens generation and sale to private investment, but it takes effect only once promulgated and published in the Official Gazette, which had not happened when this page was checked.
Reforma Parcial de la Ley Orgánica del Sistema y Servicio Eléctrico, communications ministry note, Sanction in second discussion, 2026-11-10 official text · verified 2026-11-11 · changed: Reform sanctioned by the Assembly on 10 November 2026, pending promulgation and gazette publication. Worked example
- A factory runs a 3 MW diesel plant without a licence. Art. 100 sets a fine of 5,000 to 10,000 U.T., and paying it does not remove the duty to obtain the licence. Confirm the bolívar value of the U.T. that the ministry applies before budgeting.
Step by step
- Decide if your need is self generation, which the law allows, or sale to others, which it does not.
- Below 2 MW, check the limits of the law. From 2 MW, file for the licence.
- For diesel or gas fuel, check supply permits with the hydrocarbons ministry.
- Contract with Corpoelec only after a sanctions review.
- Track the reform sanctioned on 10 November 2026, because the rules change only on gazette publication.
Common traps
- Selling surplus power to a neighbour is not self generation under art. 45, which covers exclusive own use.
- The tax exemption in art. 57 covers listed activities of the system. Check whether it survives once the reform text is published.
- Art. 46 requires the licence from 2 MW, while the art. 100 fine refers to self generation of more than 2 MW. Apply for the licence at exactly 2 MW.
- We found no fee for the self generation licence.
- The text read is a ministry copy. Fines are set in U.T., and this page does not convert them to bolívars because no official text of the current tax unit value could be loaded.