Countries › Brazil › Guide › 12. Sectors › Distributed generation in Brazil: rooftop and remote solar, net metering credits and the wire charge phase in
Distributed generation in Brazil: rooftop and remote solar, net metering credits and the wire charge phase in
Last verified: 2026-10-27 · Status: Changing
Consumers in Brazil may generate their own renewable or cogeneration power up to 75 kW (micro) or 3 MW non dispatchable and 5 MW dispatchable (mini) and offset it against their bills through the energy compensation system, locally, remotely across their own units or through shared generation. Systems in place when the law was published in January 2022 or requested within the following 12 months keep the old full offset until 31 December 2045. Newer systems pay a rising share of the distribution wire charges on compensated energy, 60 percent in 2026, 75 percent in 2027 and 90 percent in 2028, before ANEEL's cost benefit tariff rules apply from 2029.
Key facts
| Maximum capacity of micro generation | 75 kWLei nº 14.300 art. 1 XI, as of 2026-10-27 · in force |
|---|---|
| Maximum capacity of mini generation, dispatchable sources | 5 MWLei nº 14.300 art. 1 XIII, as of 2026-10-27 · in force |
| Maximum capacity of mini generation, non dispatchable sources | 3 MWLei nº 14.300 art. 1 XIII, as of 2026-10-27 · in force |
| Share of distribution wire components paid on compensated energy in 2026 (non grandfathered units) | 60 %Lei nº 14.300 art. 27 IV, as of 2026-10-27 · in force |
| End of legacy net metering for grandfathered units | 2045-12-31 dateLei nº 14.300 art. 26, as of 2026-10-27 · in force |
The rule
Example: For every R$100 of those distribution components on compensated energy, the unit pays R$60 in 2026, R$75 in 2027 and R$90 in 2028. / For every US$100 of those components: US$60, US$75 and US$90.Lei nº 14.300, Art. 27 caput I to VII, 2022-01-06 official text · verified 2026-10-27
| Year | Standard units | Non dispatchable remote or concentrated shared mini generation above 500 kW |
|---|---|---|
| 2023 | 15 percent | 100 percent plus 40 percent of transmission and other listed components |
| 2024 | 30 percent | Same |
| 2025 | 45 percent | Same |
| 2026 | 60 percent | Same |
| 2027 | 75 percent | Same |
| 2028 | 90 percent | Same |
| 2029 onward | ANEEL rule under art. 17 | ANEEL rule under art. 17 |
Share of distribution wire components charged on compensated energy (Lei nº 14.300 art. 27).
Worked example
- A company installs 2.5 MW of solar in 2026 to supply its branches in the same distribution area through remote self consumption. Solar without batteries is non dispatchable, so the 3 MW cap applies and the project fits as mini generation. Because it is above 500 kW and remote, it pays until 2028 the full distribution wire components plus 40 percent of transmission components on compensated energy (art. 27 § 1), and from 2029 the ANEEL rule.
Step by step
- 1. Check eligibility: renewable or qualified cogeneration source and capacity within 75 kW, 3 MW or 5 MW.
- 2. Choose the modality: local, remote self consumption, multi unit or shared generation.
- 3. File the ANEEL standard access form with the distributor.
- 4. Model bills with the art. 27 phase in for the connection year, and art. 27 § 1 if above 500 kW remote or concentrated shared.
- 5. Keep the unit in the same holder or a valid transfer to preserve credits and any grandfathering.
Common traps
- Free market consumers cannot join the compensation system.
- Splitting a plant to fit the limits is prohibited (art. 11 § 2).
- Grandfathering to 2045 is lost if the contract with the distributor ends, other than by change of holder, or in other cases listed in art. 26 § 2.
- Large remote solar above 500 kW does not benefit from the gradual phase in; it pays the full wire components from the start.
Sources
- Lei nº 14.300 (distributed generation), Congress normas.leg.br
- Lei nº 15.269 of 24 November 2025 (power sector reform), Congress normas.leg.br
Related pages
- sectors/power-generation-and-auctions
- sectors/key-sectors-and-regulators
- investing/energy-transition-incentives
- real-estate/condominiums-and-off-plan-purchases
- /calendar/
- /country/brazil/
- Live dashboard
Related: Brazil country profile · live dashboard · central bank and release calendar · our posts on X
