Natural gas, LNG and coastal concessions

Last verified: 2026-11-15 · Status: Stable

A 2008 law covers receiving, storing, regasifying, moving, distributing and selling natural gas, open to national and foreign firms. Storage needs authorization and a licence, while pipelines and distribution networks need a concession. Floating and coastal works also need a maritime space concession of up to 50 years, as the 355 MW Acajutla project shows.

El Salvador is dollarized: the US dollar has unrestricted legal tender status (Decreto Nº 201, Ley de Integración Monetaria, art. 3), so every amount here is already in US dollars. Colón equivalents use the fixed legal rate of ¢8.75 per US$1 (same law, art. 1) and are for reference only.

Key facts

Maximum maritime space concession50 yearsD.L. 906 art. 6, as of 2026-11-15 · in force
Acajutla gas project capacity355 MWD.L. 275 art. 2, as of 2026-11-15 · in force
Gas pipeline and distribution concession term30 yearsD.L. 630 art. 17, as of 2026-11-15 · in force

The rule

1. The law regulates reception, storage, regasification, transport, distribution and sale of natural gas. The economy ministry and its hydrocarbons directorate supervise, a role now run through the DGEHM.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 1 and 3, 2008-05-22 official text · verified 2026-11-15
2. Building storage or vehicle gas stations needs prior authorization. After a compliance opinion, the regulator grants the operating licence, which also covers expansions.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 7 and 8, 2008-05-22 official text · verified 2026-11-15
3. Storage plus pipeline for a plant's own use can be authorized without a concession.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 12 and 18, 2008-05-22 official text · verified 2026-11-15
4. An appeal against a final decision goes to the Minister of Economy, filed with the directorate within three working days.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 16, 2008-05-22 official text · verified 2026-11-15
5. Pipeline transport and network distribution need a concession, open to natural or legal persons, national or foreign.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 17, 18 and 23, 2008-05-22 official text · verified 2026-11-15
6. Pipeline transport and network distribution concessions are granted by the ministry for 30 years from award, and the outgoing concessionaire may bid again. A licence for own use storage lasts 30 years, renewable.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 12 and 17, 2008-05-22 official text · verified 2026-11-15
7. Anyone, national or foreign, may import or export natural gas after obtaining the authorization and licence and registering yearly with the directorate, which issues import and export licences.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 5 b) and 50, 2008-05-22 official text · verified 2026-11-15
8. A pipeline concessionaire cannot also take distribution concessions, save where no one else is interested or the project is otherwise not viable.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 21 and 22, 2008-05-22 official text · verified 2026-11-15
9. Distribution concessions go by public bid.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 23, 2008-05-22 official text · verified 2026-11-15
10. Anyone meeting the conditions has non discriminatory access to a pipeline.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 27, 2008-05-22 official text · verified 2026-11-15
11. Concessions can be ended only on listed grounds, such as failing to start or finish works on time or breaching free access.Decreto Legislativo Nº 630, Ley de Gas Natural, Art. 34, 2008-05-22 official text · verified 2026-11-15
12. Private use of maritime and coastal public space, including floating works and seabed cables, needs a concession of up to 50 years, extendable if favourable to the state.Decreto Legislativo Nº 906, Ley de Concesión de Espacios de Dominio Público Marítimo Terrestre, Art. 1, 3 and 6, 2018-02-13 official text · verified 2026-11-15
13. The payment comes from the formula C = N/mc + a(Mi), where N is US$400 for category C or US$800 for A and B, a is US$0.036 per square metre and Mi is 1 or 2 by investment size. For category A the result is a monthly payment; for categories B and C a is US$0.036 a year per square metre and the result is a yearly payment. Safety zones are charged at US$0.036 per square metre, monthly for A and yearly for B. The monthly figure is adjusted yearly for central bank inflation, and the payment period set in the concession decree cannot exceed one year.Decreto Legislativo Nº 906, Art. 7, 2018-02-13 official text · verified 2026-11-15 · changed: Corrected on 2026-11-11: the art. 7 result is a monthly payment for category A, not a yearly one; the yearly rate applies to categories B and C.
14. Requests go to the executive director of the maritime authority AMP. Category A covers private ports with investment above US$1 million or that serve merchant ships.Decreto Legislativo Nº 906, Art. 8 and 9, 2018-02-13 official text · verified 2026-11-15
15. Energía del Pacífico received a 50 year concession for a 355 MW gas plant project near Acajutla, 1.3 km from shore.Decreto Legislativo Nº 275, Art. 2 to 4, 2019-03-21 official text · verified 2026-11-15
16. Its first year payment is US$453,128.88 for operation and safety areas, paid in the first four months of each concession year and adjusted each year for inflation reported by the central bank.
Cost to do it: Year one: US$453,128.88 (¢3,964,877.70), made of US$306,504.96 and US$146,623.92.
Example: ¢3,964,877.70 in year one / US$453,128.88 in year oneDecreto Legislativo Nº 275, Art. 5, 2019-03-21 official text · verified 2026-11-15
ActivityTitle
Storage and regasificationAuthorization then operating licence
Own use storage and pipelineAuthorization
Pipeline transportConcession from the ministry
Network distributionConcession by public bid
Floating terminal or seabed worksMaritime space concession too

Titles under the Ley de Gas Natural and D.L. 906.

Worked example

  • The Acajutla project pays US$25,542.08 a month for operation areas and US$12,218.66 a month for safety areas, or US$453,128.88 (¢3,964,877.70) in year one. That is our sum of the two lines in art. 5 and matches the stated total.
  • Our check of the art. 7 formula: for the 343,640 m² operation area, US$800/343,640 plus US$0.036 × 2 is about US$0.0743 per m² a month, which times 343,640 m² gives about US$25,542 a month, matching the decree's monthly line.

Step by step

  1. Scope the chain: storage, pipeline, power use.
  2. Seek AMP feasibility for sea space.
  3. Apply for gas authorization and the environmental permit.
  4. Build, pass inspection and obtain the operating licence.
  5. Request the import licence from the regulator.

Common traps

  • Three days is a short appeal window.
  • Under art. 7 a category A project's formula gives a monthly charge, so multiply by twelve when budgeting the year.
  • A gas import plant still needs the electricity route for power sales.
  • The law refers to the former directorate; apply it as the DGEHM.
  • Pipeline and network concessions end after 30 years and go back to public bid, so price the rebid risk into long term financing.
  • The regulatory charge amount under art. 20 was not found.

Sources

Related pages

Related: El Salvador country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.