The LatAm Thread

Countries › El Salvador › Guide › 12. Sectors › Distributed generation, rooftop solar and storage

Distributed generation, rooftop solar and storage

Last verified: 2026-11-15 · Status: Changing

Any electricity user may add solar or other renewable systems and inject surplus, and qualified suppliers get broad tax breaks for ten years. A plant selling from a distribution network now sells only to the distributor, through a contract at a price set by the DGEHM. The April 2026 reform ended open ended project selling, so check capacity, price and the transition rules first.

El Salvador is dollarized, so every amount here is already in US dollars. Colón equivalents use the fixed legal rate of ¢8.75 per US$1 under art. 1 of the Ley de Integración Monetaria and are for reference only. SSF copy: https://ssf.gob.sv/wp-content/uploads/ssf2018/Otras%20Leyes/Ley_integracion_monetaria.pdf

Key facts

Sale channel for retail market distributed plantsDistributor only, by CAD contract textD.L. 548 art. 32-A, as of 2026-11-15 · in force
Supplier and user incentive term10 yearsD.L. 436 art. 11, as of 2026-11-15 · in force

The rule

1. Every final user keeps the right to a normal grid connection and may complement or replace it with renewable systems where the connection allows it, and may inject surplus generated or stored if it meets the applicable requirements.Decreto Legislativo Nº 436, Ley de Fomento para el Uso de la Energía Renovable, Art. 5, 2025-10-27 official text · verified 2026-11-15
2. The tariff the distributor pays for injected surplus goes in a pliego under a special regulation. D.L. 436 gave that power to SIGET; D.L. 620, published 8 July 2026 and in force eight days later, makes the DGEHM the competent body for D.L. 436 and reads SIGET references in the electricity sector as the DGEHM.Decreto Legislativo Nº 436, with Decreto Nº 620 of 2026, Art. 4 and 6 of D.L. 436; Art. 3 and 11 of D.L. 620, 2025-10-27 official text · verified 2026-11-15 · changed: D.L. 620 of 2 July 2026 (D.O. 126, 8 July 2026) moved electricity sector powers, including those under D.L. 436, from SIGET to the DGEHM.
3. Suppliers qualify if they hold a NIT, are VAT taxpayers with a registration showing the matching activity, are tax solvent or authorized, and hold a Qualification Agreement.Decreto Legislativo Nº 436, Art. 7, 2025-10-27 official text · verified 2026-11-15
4. Qualified suppliers get full income tax exemption on incentivized activities, no income tax withholding, no VAT on local sales and full import duty and VAT relief on equipment and parts.Decreto Legislativo Nº 436, Art. 8, 2025-10-27 official text · verified 2026-11-15
5. Users buying from a qualified supplier pay no VAT on the purchase or on installation and maintenance, and may deduct the cost from taxable income in that fiscal year with the supplier's tax document.
Cost to do it: On US$50,000.00 (¢437,500.00) of equipment the VAT saved at 13 percent is US$6,500.00 (¢56,875.00).
Example: Purchase ¢437,500.00, VAT saved ¢56,875.00 / Purchase US$50,000.00, VAT saved US$6,500.00Decreto Legislativo Nº 436, Art. 9, 2025-10-27 official text · verified 2026-11-15
6. The fiscal incentives last ten years from entry into force of the law.Decreto Legislativo Nº 436, Art. 11, 2025-10-27 official text · verified 2026-11-15
7. Distributed generators in the retail market may sell only to distributors, through Contratos de Abastecimiento en Distribución. They may instead join the wholesale market, but one plant cannot sit in both.Decreto Legislativo Nº 548, reforms to the Ley General de Electricidad, Art. 5, new art. 32-A, 2026-04-09 official text · verified 2026-11-15 · changed: D.L. 548, published 13 April 2026, created the retail market and this single buyer rule.
8. These contracts come from competitive processes under DGEHM guidelines, started by developers or by the DGEHM. The DGEHM sets the prices and the distributors must sign.Decreto Legislativo Nº 548, Art. 5, new art. 32-B, 2026-04-09 official text · verified 2026-11-15
9. The DGEHM decides maximum distributed capacity for the system and for each circuit, with UT technical support.Decreto Legislativo Nº 548, Art. 5, new art. 32-C, 2026-04-09 official text · verified 2026-11-15
10. Generators must deliver monitoring and control signals, may have to supply frequency reserve themselves or by purchase, and need a compliant commercial meter. Storage is allowed for their own reserve.Decreto Legislativo Nº 548, Art. 5, new arts. 32-D, 32-E, 32-H and 32-I, 2026-04-09 official text · verified 2026-11-15
11. Generators under these contracts earn no firm capacity payment.Decreto Legislativo Nº 548, Art. 5, new art. 32-G, 2026-04-09 official text · verified 2026-11-15
12. Interconnection charges follow DGEHM guidelines. If a third party prepares the study, the distributor reviews it at no added cost.Decreto Legislativo Nº 548, Art. 3, new art. 28-A, 2026-04-09 official text · verified 2026-11-15
13. Distributors must send the DGEHM every request and resolution in the interconnection process within five working days.Decreto Legislativo Nº 548, Art. 4, new art. 29-A, 2026-04-09 official text · verified 2026-11-15
14. Distributors must help contracts signed before D.L. 49 of 17 July 2024 took effect reach operation, and those CAD contracts may be renewed only under DGEHM guidelines. For contracts in operation when D.L. 548 took effect, any change extending term or capacity, or changing plant configuration or price, needs express DGEHM approval.Decreto Legislativo Nº 548, Art. 7 and 8, 2026-04-09 official text · verified 2026-11-15
15. Holders of valid grid access approval, or a favourable feasibility ruling, may sign a contract without a competitive process, on request to the DGEHM and at DGEHM conditions, if they appear in the data sets under Acuerdos 52 and 53 of 2024.Decreto Legislativo Nº 548, Art. 9, 2026-04-09 official text · verified 2026-11-15
16. The DGEHM had 12 months from entry into force to set the interconnection charge method and approve the charges, and the UT has 18 months to prepare to run the retail market. The decree took effect eight days after publication on 13 April 2026.Decreto Legislativo Nº 548, Art. 10, 11 and 13, 2026-04-09 official text · verified 2026-11-15
17. After the reform the DGEHM opened an online update of distributed projects: plants in operation with contracts, projects under construction, feasibility approved or pending, and interconnection approved.DGEHM notice on distributed generation (archived copy of the DGEHM page), Service notice, 2026-05-12 official text · verified 2026-11-15
RouteBuyerPriceFirm capacity
Self consumption with surplusDistributor, for surplusPliego under the special regulationNo
Retail market CADDistributor onlySet by DGEHMNo
Wholesale marketMarket participantsMarket or contractUnder market rules

Three routes for a plant on a distribution network after D.L. 436 of 2025 and D.L. 548 of 2026.

Worked example

  • A factory buys US$50,000.00 (¢437,500.00) of solar from a qualified supplier. It pays no VAT, saving US$6,500.00 (¢56,875.00), and deducts the cost. At a 30 percent income tax rate, assumed for illustration, the deduction is worth US$15,000.00 (¢131,250.00).

Step by step

  1. Decide between self consumption, retail or wholesale; one plant cannot be in two markets.
  2. Confirm the seller holds a current Qualification Agreement.
  3. Check circuit capacity with the distributor and the DGEHM.
  4. File interconnection, with any third party study.
  5. For legacy projects, register in the DGEHM update and ask for the art. 9 contract.

Common traps

  • A developer can no longer sell to a third party user from a distribution network in the retail market.
  • The price comes from the DGEHM, not from the bid alone, so model it as regulated revenue.
  • Tax relief needs the supplier's agreement; buying from an unqualified supplier loses user VAT relief.
  • D.L. 436 names SIGET throughout; under D.L. 620 read those references as the DGEHM since mid July 2026.
  • The monthly injected surplus tariff was not found in an official text, so do not assume net metering at retail price.

Sources

Related pages

Related: El Salvador country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.