Countries › Guatemala › Guide › 12. Sectors › Oil and gas in Guatemala: operating contracts, royalties by API gravity, the State's share and where the money goes
Oil and gas in Guatemala: operating contracts, royalties by API gravity, the State's share and where the money goes
Last verified: 2026-10-31 · Status: Stable
Hydrocarbons belong to the Nation and are worked through contracts, not concessions, signed after an official call, for up to 25 years plus one extension of up to 15. Contractors pay a royalty of 20 percent at 30 degrees API, moving one point per degree with a 5 percent floor, and production sharing contracts give the State at least 30 percent of shareable output on top. State revenue goes through FONPETROL, and receipts have fallen sharply: Q32.8 million for 2025 output months against more than Q1,000 million a year in 2011 and 2012.
USD figures use Q7.64187 per US dollar, the Banco de Guatemala reference rate for 31 October 2026, retrieved from the Banguat exchange rate web service on the verification date. Conversions are for orientation only.
Key facts
| Maximum term of an oil operations contract | 25 yearsDecreto Ley 109-83 art. 12, as of 2026-10-31 · in force |
|---|---|
| Single extension of an oil contract | 15 yearsDecreto Ley 109-83 art. 12, Decreto 71-2008 art. 8, as of 2026-10-31 · in force |
| Crude royalty at 30 degrees API | 20 %Decreto Ley 109-83 art. 61, as of 2026-10-31 · in force |
| Minimum royalty, crude and gas | 5 %Decreto Ley 109-83 art. 61, as of 2026-10-31 · in force |
| Royalty before a commercial declaration | 35 %Decreto Ley 109-83 art. 61, as of 2026-10-31 · in force |
| Minimum State share of shareable hydrocarbons | 30 %Decreto Ley 109-83 art. 66 a), as of 2026-10-31 · in force |
| Tax on signing a contract, before the per hectare amount | 100,000 GTQDecreto Ley 109-83 art. 35 b), as of 2026-10-31 · in force |
| Maximum block size on land | 50,000 hectaresDecreto Ley 109-83 art. 60, as of 2026-10-31 · in force |
| FONPETROL share of producing departments | 20 %Decreto 71-2008 art. 6, as of 2026-10-31 · in force |
| FONPETROL share to the common fund | 72 %Decreto 71-2008 art. 6, as of 2026-10-31 · in force |
The rule
Cost to do it: Signature tax Q100,000 (about US$13,086) plus the per hectare amount set in the call; a full assignment of rights pays Q100,000 (about US$13,086) (art. 35).
Example: A contract signed in 2026 can run to 2051, and to 2066 if the single extension is approved. / A foreign operator may hold the contract directly, as the law's definition of contractor covers foreign persons.Decreto Ley Nº 109-83, Ley de Hidrocarburos (15 September 1983, Diario Oficial 16 September 1983), art. 12 as amended by Decreto 71-2008 art. 8 (Diario de Centro América 30 January 2009), Art. 1, 4, 12, 14 and 15, 2009-01-30 official text · verified 2026-10-31 · changed: Decreto 71-2008 changed art. 12 to allow one extension of up to 15 years subject to better economic terms for the State.
Cost to do it: Well depth and work commitments are set in each call. Penalties for missing work are set in the contract (art. 66 d).
Example: Six land blocks of 50,000 hectares give 300,000 hectares, the land exploration limit, and fall to 150,000 by year 5. / An investor budgeting for one contract area should cover at least one well in years 1 to 3 before any return of area.Decreto Ley Nº 109-83, Art. 58, 60 and 66 e), f) and g), 1983-09-16 official text · verified 2026-10-31
Cost to do it: Late payment: 10 percent fine, plus interest at the highest bank rate plus 10 points, compounded quarterly (art. 37).
Example: 22 degree crude pays 12 percent; 30 degree crude pays 20 percent; 40 degree crude pays 30 percent; 10 degree crude pays the 5 percent floor (the formula alone gives 0). / On 100,000 barrels of 22 degree crude at the January 2026 provisional price of US$36.227 a barrel, the royalty is 12,000 barrels, about US$434,724.Decreto Ley Nº 109-83, as amended by Decreto Ley 161-83, Art. 61, 1983-09-16 official text · verified 2026-10-31
Cost to do it: Which costs can be recovered is set by the Reglamento and the contract.
Example: From 100,000 barrels: royalty 12,000, assumed cost recovery 40,000, shareable 48,000; State minimum 30 percent, 14,400; contractor 33,600. / At US$36.227, the State's total of 26,400 barrels is about US$956,393, and the contractor's pay is about US$1,217,227 before income tax.Decreto Ley Nº 109-83, Art. 66 a), b) and c), 1983-09-16 official text · verified 2026-10-31
Cost to do it: Q100,000 at signature (about US$13,086) plus the per hectare amount in the call.
Example: The law's cost carry forward differs from the general income tax regime, where the taxes section records no loss carryforward. / A US$10 million dividend to a foreign parent would be free of dividend tax on the face of art. 34; see the trap below on checking this against later income tax law.Decreto Ley Nº 109-83, Art. 33, 34 and 35, 1983-09-16 official text · verified 2026-10-31
Cost to do it: No separate charge to the contractor; these are shares of what it already pays.
Example: The MEM table totals Q6,681.8 million from May 2009 to June 2026, of which Q1,336.4 million went to the 20 percent share. / For 2025 output months the total is about Q32.8 million, roughly US$4,292,143.Decreto Nº 71-2008 del Congreso, Ley del Fondo para el Desarrollo Económico de la Nación (Diario de Centro América 30 January 2009), Art. 1, 2, 3, 6 and 7, 2009-01-30 official text · verified 2026-10-31
| Output year | Total (Q million) |
|---|---|
| 2011 | 1,067.2 |
| 2012 | 1,057.5 |
| 2015 | 183.9 |
| 2020 | 69.5 |
| 2022 | 318.0 |
| 2023 | 76.9 |
| 2024 | 91.7 |
| 2025 | 32.8 |
| 2026 to June | 15.8 |
FONPETROL definitive income by output year, summed from the MEM table of 16 September 2026. 2026 covers January to June.
| Contract | Holder as listed | Area | Status in the list |
|---|---|---|---|
| 1-2011 exploration | City Peten, S. de R.L. | Paso Caballos and Yalcanix | 25 years from 26 August 2013 |
| 2-2014 exploration | Legacy Holding, S.A. | El Cedro | 25 years from 2 January 2015 |
| 1-15 exploration | Island Oil Exploration Services, S.A. | Laguna Blanca | 25 years from 12 June 2015 |
| 1-2006 production | City Peten, S. de R.L. | Ocultún | 25 years from 21 September 2006 |
| 01-2025 emergency services | Industrial de Servicios, S.A. | Bloque 7A | 10 years shown, from 8 August 2025 |
| 1-19 pipeline operation | Perenco Guatemala Limited | Stationary transport system | Unilateral termination notice in process |
Contracts in the MEM list published in October 2025.
Worked example
- A producer lifts 100,000 barrels of 22 degree crude. Royalty: 20 percent less 8 points, 12 percent, 12,000 barrels.
- Assume 40,000 barrels of approved cost recovery. Shareable: 48,000 barrels. State minimum share: 30 percent, 14,400 barrels. Contractor: 33,600 barrels.
- At the January 2026 provisional Rubelsanto price of US$36.227, the State's 26,400 barrels are about US$956,393, or Q7,308,629.45 at the reference rate.
- The 30 percent is a floor; the contract's scale can raise it as output or value rises.
Step by step
- 1. Watch for an official call: outside art. 64 cases a contract can only be signed after one (art. 14).
- 2. Obtain contractor status with the Ministry and prove technical and financial capacity (art. 15).
- 3. Bid against the model terms and bases; the contract sets work, penalties and share scales.
- 4. Pay the Q100,000 signature tax plus the per hectare amount, and register the contract.
- 5. Run the mandatory wells and area returns, and pay the royalty ahead of any cost recovery.
- 6. Budget for environmental approval and, where relevant, consultation with indigenous peoples.
Common traps
- Calling it a concession. Art. 14 gives only the rights written in the contract.
- Relying on art. 34 for dividends without checking later law. The article predates the 2012 income tax law, and this page did not confirm how the two fit. Take advice before modelling a nil rate.
- Producing before a commercial declaration. Crude from an undeclared field pays 35 percent.
- Assuming heavy crude escapes the royalty. The formula bottoms out at the 5 percent floor, so low API crude still pays.
- Reading the MEM contract list as current. It is dated October 2025, and it shows several contracts in termination. Ask the Ministry for status.
- Using a 2026 headline price. The Ministry sets monthly prices provisionally and adjusts them later (Reglamento art. 171; Acuerdos Ministeriales 410 and 411-2025/SG).
Sources
- Decreto Ley 109-83, Ley de Hidrocarburos, compiled (Ministerio de Energía y Minas)
- Acuerdo Gubernativo 1034-83, Reglamento General de la Ley de Hidrocarburos (Ministerio de Energía y Minas)
- Decreto 71-2008, Diario de Centro América 30 January 2009, Congress copy on FAOLEX
- FONPETROL income table, MEM, 16 September 2026
- Listado de contratos de operaciones petroleras, MEM
- Acuerdos Ministeriales 410 and 411-2025/SG on crude prices, Diario de Centro América 22 December 2025 (MEM copy)
- Banco de Guatemala exchange rate web service
Related pages
- sectors/energy-mining-and-key-sectors
- sectors/fuel-import-storage-and-retail
- /country/guatemala/
- /calendar/
- Live dashboard
Related: Guatemala country profile · live dashboard · central bank and release calendar · our posts on X