Guatemala's wholesale power market: who may be an agent, how to register, large users and distributor tenders
Last verified: 2026-10-31 · Status: Stable
To trade in Guatemala's wholesale power market a company must be entered in the Ministry of Energy and Mines register of agents and large users, and meet a size test by activity. The tests in the 2020 registration decree are 5 MW for a generator, 10 MW for a transporter, a 5 MW firm contract for a trader, and over 100 kW of demand for a large user; registration fees run from Q7,500 to Q15,000. Regulated distributors must buy through open tenders of up to 15 years, normally five years ahead, and homes using up to 300 kWh sit on a social tariff set by a separate 2000 law.
USD figures use Q7.64187 per US dollar, the Banco de Guatemala reference rate for 31 October 2026, retrieved from the Banguat exchange rate web service on the verification date. Conversions are for orientation only.
Key facts
| Minimum size for a generator to be a wholesale market agent | 5 MWAG 129-2020 art. 4; AG 256-97 art. 39, as of 2026-10-31 · in force |
|---|---|
| Minimum capacity for a transporter agent | 10 MWAG 129-2020 art. 4, as of 2026-10-31 · in force |
| Minimum firm contract for a trader, importer or exporter | 5 MWAG 129-2020 art. 4 and 9, as of 2026-10-31 · in force |
| Register fee, generators, distributors and transporters | 15,000 GTQAG 129-2020 art. 11, as of 2026-10-31 · in force |
| Register fee, traders | 10,000 GTQAG 129-2020 art. 11, as of 2026-10-31 · in force |
| Register fee, large users | 7,500 GTQAG 129-2020 art. 11, as of 2026-10-31 · in force |
| Time for the Directorate to register a complete file | 10 daysAG 129-2020 art. 6, as of 2026-10-31 · in force |
| Maximum term of a distributor supply tender | 15 yearsAG 256-97 art. 65 Bis, as of 2026-10-31 · in force |
| Minimum lead time of a distributor tender, unless reduced by the CNEE | 5 yearsAG 256-97 art. 65 Bis, as of 2026-10-31 · in force |
| Consumption ceiling of the social tariff | 300 kWhDecreto 96-2000 art. 1, as of 2026-10-31 · in force |
The rule
Cost to do it: The sworn statements are notarial records, a private notary cost. Registration fees are in the next rule.
Example: A 12 MW solar plant qualifies as a generator agent. A 3 MW plant does not, so it sells through a distributor connection or as distributed generation. / A trader with a US$20 million supply book needs a live contract of at least 5 MW; the registration lapses with that contract (AG 129-2020 art. 9).Acuerdo Gubernativo Nº 256-97, Reglamento de la Ley General de Electricidad, as amended by AG 68-2007; Acuerdo Gubernativo Nº 129-2020 (26 August 2020, Diario de Centro América 31 August 2020), Reglamento art. 39; AG 129-2020 art. 4, 2020-08-31 official text · verified 2026-10-31 · changed: AG 129-2020 replaced AG 244-2003 and moved the register to the Dirección General de Energía. Its recitals say the limits were fixed by Acuerdo Ministerial 195-2013, which is why the compiled Reglamento no longer shows the working numbers.
Cost to do it: Generators, distributors and transporters Q15,000 (US$1,963); traders Q10,000 (US$1,309); large users Q7,500 (US$981); data update Q1,500 (US$196); certification Q1,000 (US$131). The certificate for a first registration is free.
Example: A factory registering as a large user pays Q7,500 and needs the notarial statement if it is new, or three months of metering records if it already exists. / A generator pays Q15,000, about US$1,963, once, plus a Q1,500 update fee for a change of accountant, name, merger or transfer of authorization (art. 8).Acuerdo Gubernativo Nº 129-2020; Acuerdo Gubernativo Nº 299-98, Reglamento del Administrador del Mercado Mayorista, AG 129-2020 art. 2, 3, 6, 8 and 11; RAMM art. 5, 2020-08-31 official text · verified 2026-10-31
Cost to do it: No fee to keep the entry, but loss of status means returning to the distributor's terms and a fresh registration fee.
Example: A large user whose demand falls to 80 kW after a plant shutdown can lose its status under art. 7 and be cancelled under art. 9. / A data centre with a US$ priced supply contract should keep metering evidence above 100 kW, since the contract does not protect the status by itself.Acuerdo Gubernativo Nº 129-2020, Art. 7 and 9, 2020-08-31 official text · verified 2026-10-31
Cost to do it: Tender costs and bonds are set in each tender's bases, not in the Reglamento.
Example: A 50 MW wind developer can bid for a 15 year contract in a distributor tender; the award is the bankable revenue line. / On 50 MW at a 35 percent capacity factor, about 153,300 MWh a year; each US$10 per MWh of price is about US$1.53 million a year over up to 15 years (arithmetic only, not a market price).Acuerdo Gubernativo Nº 256-97, Reglamento de la Ley General de Electricidad; Decreto Nº 93-96, Ley General de Electricidad, Reglamento art. 65 Bis; LGE art. 53 and 62, 2007-03-06 official text · verified 2026-10-31 · changed: Art. 65 Bis was added to the Reglamento; the compiled CNEE text marks it as an amended article.
Cost to do it: No cost to investors directly; relevant for generators bidding into the tenders that supply it.
Example: A home using 250 kWh a month falls in the social tariff band; one using 400 kWh does not. / Relevant to a generator pricing a distributor tender: the end customer bracket does not change the contract price.Decreto Nº 96-2000 del Congreso, Ley de la Tarifa Social para el Suministro de Energía Eléctrica (19 December 2000), Art. 1, 2 and 3, 2000-12-19 official text · verified 2026-10-31
| Category | Test | Fee |
|---|---|---|
| Generator | More than 5 MW maximum power, or an MEM contract for use of public property | Q15,000 (US$1,963) |
| Transporter | 10 MW of transport capacity, or an MEM contract | Q15,000 (US$1,963) |
| Distributor | Private: at least 100 kW of demand, or the Ministry limit | Q15,000 (US$1,963) |
| Trader, importer, exporter | Contract to buy or sell at least 5 MW of firm offer or demand | Q10,000 (US$1,309) |
| Large user | Demand over 100 kW; single meter point | Q7,500 (US$981) |
Register of agents and large users: tests and fees under AG 129-2020, at Q7.64187 per US dollar.
Worked example
- A manufacturer with 900 kW of demand wants to leave its distributor's regulated tariff. It collects three months of metering records, confirms a single meter point and files with the Dirección General de Energía.
- Fee Q7,500, about US$981. Time: 10 days to register, 5 days for the certificate, if the file is complete.
- It then signs a supply contract with a generator or trader and pays network tolls.
- If demand later falls below the test under art. 7, the AMM reports it and the Ministry cancels the entry.
Step by step
- 1. Choose the category and confirm the test in AG 129-2020 art. 4, not the older numbers in the compiled Reglamento.
- 2. Gather legalized copies of the deed, patents, appointment and identity document, plus a digital copy.
- 3. Prepare the notarial sworn statement or, for an existing plant, the metering records for the last three months.
- 4. File at the registry window of the Dirección General de Energía and pay the art. 11 fee.
- 5. Register with the AMM and follow its coordination rules; keep the art. 7 tests and calendar any trader sworn statement.
Common traps
- Using the 2 MW trader limit. The compiled Reglamento still shows 2 MW, but AG 129-2020 art. 4 and 9 work with 5 MW.
- Using the 15,000 user test for distributors. AG 129-2020 art. 4 asks a private distributor for at least 100 kW of demand.
- Treating registration as permanent. Art. 7 and 9 allow cancellation when the test stops being met, with disconnection within 30 days.
- Assuming art. 11 fees are the only cost. The notarial statements, legalized copies and AMM rules add private cost not fixed in the decree.
- Reading Acuerdo Ministerial 195-2013 from a secondary source. Its text was not located; the limits above come from AG 129-2020, which is the official working statement.
Sources
- Acuerdo Gubernativo 129-2020, Diario de Centro América 31 August 2020 (Ministerio de Energía y Minas)
- Reglamento de la Ley General de Electricidad, compiled (CNEE)
- Reglamento del Administrador del Mercado Mayorista, compiled (CNEE)
- Decreto 93-96, Ley General de Electricidad (CNEE)
- Decreto 96-2000, Ley de la Tarifa Social (CNEE)
- Banco de Guatemala exchange rate web service
Related pages
- sectors/energy-mining-and-key-sectors
- sectors/distributed-generation-and-self-supply
- investing/renewable-energy-incentives
- /country/guatemala/
- /calendar/
- Live dashboard
Related: Guatemala country profile · live dashboard · central bank and release calendar · our posts on X