Anyone may generate electricity in Uruguay and sell it to third parties, as long as sales run through the national dispatch center under the wholesale market rules (Decreto Ley Nº 14.694 art. 2, wording of Ley Nº 16.832). Generators contract freely with distributors and large consumers, get non discriminatory access to spare grid capacity, and pay a dispatch fee capped at 2.5 percent; transmission and distribution remain a public service of the State utility UTE unless the Executive grants a concession. International interconnections and power contracts need Executive approval, nuclear power is banned, and small renewable systems on the low voltage grid can sell all injected energy to UTE for 10 years at the tariff energy price (Decreto Nº 173/010).
USD figures use UYU 40.21 per US dollar, the BCU quotation for DLS. USA BILLETE on 27 October 2026; amounts in Unidades Indexadas (UI) use UYU 6.6792 per UI, the BCU quotation for 27 October 2026; amounts in Unidades Reajustables (UR) use UYU 1,940.77, the September 2026 value published by IMPO (Decreto Nº 229/026), the latest available on 27 October 2026. Conversions are for orientation only.
Key facts
| Electricity generation open to private agents | Yes; sales to third parties through the national dispatch and wholesale market Decreto Ley Nº 14.694 art. 2 (Ley Nº 16.832 art. 1), as of 2026-10-27 · in force |
|---|---|
| Cap on national dispatch fee | 2.5 % of supply, export or transit amountLey Nº 16.832 art. 10, as of 2026-10-27 · in force |
| Third party access to spare transmission and distribution capacity | Mandatory and non discriminatory Ley Nº 16.832 art. 12, as of 2026-10-27 · in force |
| Executive approval of international interconnections and power contracts | Required Decreto Ley Nº 14.694 art. 5, as of 2026-10-27 · in force |
| Nuclear power | Prohibited Ley Nº 16.832 art. 27, as of 2026-10-27 · in force |
| UTE purchase obligation for microgeneration | 10 years from commissioningDecreto Nº 173/010 art. 2, as of 2026-10-27 · in force |
| Microgeneration limit on low voltage without UTE consent | 16 amperes (25 for single phase earth return)Decreto Nº 173/010 art. 1, as of 2026-10-27 · in force |
The rule
Cost to do it: No generation licence fee is set by these articles; technical compliance costs depend on the project. Sales to third parties carry the dispatch fee described in the wholesale market rule below.
Example: A solar plant that sells its output to a factory must route the sale through the national dispatch; there is no separate statutory generation licence fee in UYU. / Same: no statutory licence fee in USD for generation itself.Decreto Ley Nº 14.694 (National Electricity Law), art. 2 as worded by Ley Nº 16.832 art. 1, Art. 1, 2 and 3, 1997-06-17 official text · verified 2026-10-27
Cost to do it: Market participation costs are set in the regulation and contracts, not in these articles; network use is paid at the maximum tariffs approved by the Executive (Ley Nº 16.832 art. 17).
Example: A wind farm can sign a 10 year contract with a large industrial consumer at a freely negotiated price in UYU or another agreed unit; the law does not fix the price. / The same contract may be priced in US dollars if the parties agree; the law leaves price terms to the parties.Ley Nº 16.832 (Energy Framework Law); Decreto Nº 360/002 (Wholesale Market Regulation), Ley Nº 16.832 art. 11, 12 and 16; Decreto Nº 360/002 art. 1, 1997-06-17 official text · verified 2026-10-27
Cost to do it: Dispatch fee: at most 2.5 percent of the transaction amount; the applicable rate is fixed by the Executive.
Example: On power sales of UYU 40,210,000 in a year, the dispatch fee cannot exceed UYU 1,005,250. / On US$1,000,000 of sales, at most US$25,000.Ley Nº 16.832; Decreto Ley Nº 14.694 art. 10 as worded by Ley Nº 16.832 art. 6, Ley Nº 16.832 art. 4, 5, 7 and 10, 1997-06-17 official text · verified 2026-10-27
Cost to do it: Connection and interconnection terms, including who pays for grid works, are agreed with UTE and approved by the Executive; no fixed amount is set by law.
Example: A private transmission line built to evacuate a wind farm's output needs Executive authorisation to join UTE's system, with terms agreed with UTE. / Same in USD: the cost of the line and connection is project specific.Decreto Ley Nº 14.694, art. 6 (paragraphs 3 and 4 worded by Ley Nº 16.211 art. 26) and art. 7, Art. 6 and 7, 1991-10-01 official text · verified 2026-10-27
Cost to do it: No statutory approval fee; use of the grid for international contracts is paid at the approved maximum network tariffs.
Example: A generator wishing to export surplus power to an Argentine buyer must obtain Executive approval of the supply contract before performing it. / Same: approval is a condition, not a priced fee.Decreto Ley Nº 14.694 art. 5; Ley Nº 16.832 art. 13, Decreto Ley Nº 14.694 art. 5; Ley Nº 16.832 art. 13, 1997-06-17 official text · verified 2026-10-27
Cost to do it: Network tariffs are set by the Executive; the law fixes the cost recovery principle, not an amount.
Example: A large consumer buying from a private generator pays the generator's contract price plus the approved network tariff for use of UTE's grid. / Same structure in USD.Ley Nº 16.832; Decreto Ley Nº 14.694, Ley Nº 16.832 art. 15, 17 and 18; Decreto Ley Nº 14.694 art. 14, 1997-06-17 official text · verified 2026-10-27
Cost to do it: Not applicable: the activity is banned.
Example: A trader cannot import power under a contract with a nuclear plant abroad. / Same: no USD amount applies.Ley Nº 16.832, Art. 27, 1997-06-17 official text · verified 2026-10-27
Cost to do it: No network use charges (art. 6); the subscriber pays interior equipment, meter box adaptation and the approved connection fee (art. 7 and 8). Equipment cost is project specific.
Example: A shop on a UTE low voltage tariff installs solar panels within its contracted power; every kWh it injects is paid by UTE at the energy charge of its own tariff for 10 years. / Same rule in USD: payment follows UTE's peso tariff, so dollar value moves with the exchange rate.Decreto Nº 173/010 of 1 June 2010, Art. 1 to 9 and 12, 2010-06-01 official text · verified 2026-10-27
| Actor | Role | Legal basis |
|---|---|---|
| Executive (Ministry of Industry, Energy and Mining) | Energy policy, tariffs, concessions, approval of interconnections and cross border contracts | Decreto Ley Nº 14.694 art. 4, 5, 6 and 14 |
| UTE | Public service of transmission and distribution; also generator; buys microgeneration | Decreto Ley Nº 14.694 art. 6; Decreto Nº 173/010 art. 2 |
| ADME | Runs the wholesale market and the national dispatch, funded by the dispatch fee | Ley Nº 16.832 art. 4, 5 and 10 |
| URSEA | Regulator for energy and water services | Ley Nº 17.598 |
| Private generators | Free to generate and sell through the wholesale market | Decreto Ley Nº 14.694 art. 2 |
| Large consumers | Wholesale market agents that may contract directly with generators | Ley Nº 16.832 art. 11 |
Who does what in Uruguay's electricity sector
| Item | Rule |
|---|---|
| Eligible sources | Wind, solar, biomass, mini hydro |
| Size limit | 16 A (25 A single phase earth return) and peak power up to contracted power; more with UTE consent |
| Purchase | UTE buys all injected energy for 10 years |
| Price | Energy charge of the subscriber's own UTE tariff |
| Network charges | None |
| Before connecting | Connection agreement with UTE |
Microgeneration on UTE's low voltage grid (Decreto Nº 173/010)
Worked example
- Dispatch fee ceiling: a private generator selling UYU 40,210,000 (US$1,000,000) of power in a year through the national interconnected system pays at most UYU 1,005,250 (US$25,000) in dispatch fees (Ley Nº 16.832 art. 10); the actual rate is fixed by the Executive.
- Microgeneration: a business that installs rooftop solar within its contracted power signs UTE's connection agreement, pays no grid use charges and sells all injected energy to UTE for 10 years at its own tariff energy price (Decreto Nº 173/010 art. 2, 4 and 6).
Step by step
- 1. Choose the route: sale to third parties through the wholesale market (utility scale) or microgeneration behind a UTE low voltage supply.
- 2. Utility scale: set up the project company (see the entities pages), obtain environmental authorisation where required and register as a wholesale market agent with ADME.
- 3. Negotiate supply contracts with UTE, distributors or large consumers (Ley Nº 16.832 art. 11) and agree connection and interconnection terms with UTE for Executive approval (Decreto Ley Nº 14.694 art. 6).
- 4. For any export or import of power, obtain Executive approval of the interconnection and the contract before performing it (Decreto Ley Nº 14.694 art. 5).
- 5. Microgeneration: check the 16 ampere and contracted power limits, sign the UTE connection agreement and pay the approved meter connection fee (Decreto Nº 173/010 art. 1, 3 and 8).
- 6. Check the COMAP investment promotion regime for generation equipment on the investing pages.
Common traps
- Selling power to third parties outside the national dispatch and wholesale market rules falls outside the generation freedom in Decreto Ley Nº 14.694 art. 2.
- A subscriber may not supply third parties through branches of its installation without the distributor's authorisation (Decreto Ley Nº 14.694 art. 12).
- Microgeneration above 16 amperes or above contracted power needs UTE's prior express consent, and the subscriber bears the cost of any network changes (Decreto Nº 173/010 art. 1).
- Contracts with nuclear generators, or with foreign plants that pollute Uruguayan territory, are prohibited for every market agent (Ley Nº 16.832 art. 27).
- Microgeneration payments follow UTE's peso tariff, so the dollar value of the 10 year purchase obligation moves with the exchange rate.
Sources
- IMPO, Decreto Ley Nº 14.694, National Electricity Law
- IMPO, Ley Nº 16.832, Energy Framework Law
- IMPO, Decreto Nº 360/002, Wholesale Market Regulation
- IMPO, Decreto Nº 173/010, microgeneration
- IMPO, Ley Nº 17.598, URSEA
- BCU, exchange rate and UI quotations
- IMPO, UR, URA and CRA values
Related pages
- sectors/key-sectors-and-rules
- sectors/fuels-biofuels-and-green-hydrogen
- investing/foreign-investment-regime
- regulation/regulatory-compliance-essentials
- trade/trade-and-customs-overview
- /country/uruguay/
- /calendar/
- Live dashboard
- https://theargentinethread.com/guide/
Related: Uruguay country profile · live dashboard · central bank and release calendar · our posts on X