Countries › Mexico › Guide › 13. Regulation › Hazardous waste and the circular economy law in Mexico: generator categories, registration, six month storage limit, SEMARNAT authorizations and extended producer responsibility
Hazardous waste and the circular economy law in Mexico: generator categories, registration, six month storage limit, SEMARNAT authorizations and extended producer responsibility
Last verified: 2026-10-26 · Status: Changing
Every business that generates hazardous waste in Mexico falls into one of three categories by annual volume: large generators (10 tonnes or more) register with SEMARNAT, file a management plan and annual report and carry environmental insurance; small generators (400 kg to under 10 tonnes) register and keep a log; microgenerators register with state or municipal authorities. Waste may be stored for no more than six months, carriers and treatment, recycling and disposal firms need SEMARNAT authorization, and the generator remains jointly liable if it hands waste to an unauthorized operator. The General Law of Circular Economy of DOF 19 January 2026 adds extended producer responsibility: producers and importers must organize and finance circularity schemes for their products and register their circular management in a national platform, with details set by regulations and product specific implementation agreements.
USD conversions use MXN 18.6638 per US dollar, the US Federal Reserve H.10 noon buying rate in New York for 23 October 2026 (FRED series DEXMXUS), the latest observation available when this page was verified. Peso amounts set in UMA use the 2026 daily UMA of MXN 117.31, in force since 1 February 2026 (INEGI publication in the DOF of 9 January 2026, as cited in IMSS Technical Council agreement ACDO.AS2.HCT.270126/9.P.DIR). Conversions are for orientation only.
Key facts
| Annual hazardous waste volume from which a business is a large generator | 10 tonnesLGPGIR art. 5, section XII, as of 2026-10-26 · in force |
|---|---|
| Annual hazardous waste volume up to which a business is a microgenerator | 400 kgLGPGIR art. 5, section XIX, as of 2026-10-26 · in force |
| Maximum storage period for hazardous waste without extension | 6 monthsLGPGIR art. 56, as of 2026-10-26 · in force |
| Maximum LGPGIR fine (days of minimum wage read as UMA) | 50000 UMALGPGIR art. 112, section V, as of 2026-10-26 · in force |
| Federal duty for a hazardous waste confinement authorization, 2026 | 134197.72 MXNLFD art. 194-T, section VII, as of 2026-10-26 · in force |
| Term for the Executive to issue the Circular Economy Law regulations | 180 calendar daysLGEC transitory Second, as of 2026-10-26 · in force |
The rule
Cost to do it: Registration is an administrative filing; large generators add a management plan, annual report and insurance premium.
Example: A plant generating 12 tonnes of spent solvents and oily rags a year is a large generator: it must register, file a management plan and annual report, and insure. / A small office generating fluorescent tubes and batteries below 400 kg a year is a microgenerator under state or municipal control.Ley General para la Prevención y Gestión Integral de los Residuos (LGPGIR), DOF 8 October 2003, last reform DOF 19 January 2026, Arts. 5, sections XII, XIX and XX, 43, 44, 46, 47 and 48, 2003-10-08 official text · verified 2026-10-26
Cost to do it: Contracting authorized carriers and disposal firms; checking their authorizations is a low cost control.
Example: Drums of waste generated in January must leave the site by July unless SEMARNAT grants an extension. / Using a cheaper unlicensed hauler leaves the generator liable for any dumping.LGPGIR arts. 42 (reformed DOF 8 May 2023) and 56, Arts. 42 and 56, 2023-05-08 official text · verified 2026-10-26
Cost to do it: From MXN 3,872.69 (USD 207) for recycling to MXN 134,197.72 (USD 7,190) for confinement, per application.
Example: A recycler of used lubricants applies for a recycling authorization (MXN 3,872.69) and, if it collects from clients, a transport authorization (MXN 6,137.82). / Total about USD 536.LGPGIR art. 50; Ley Federal de Derechos art. 194-T; Resolución Miscelánea Fiscal para 2026, Annex 4, DOF 28 December 2025, LGPGIR art. 50; LFD art. 194-T, 2025-12-28 official text · verified 2026-10-26
Cost to do it: Fine range MXN 2,346.20 to MXN 5,865,500 (about USD 126 to USD 314,271).
Example: A maquiladora under a temporary import program that leaves its waste in Mexico instead of returning it breaches art. 106, section XXII. / Up to about USD 314,271 per sanction, plus remediation.LGPGIR art. 106 (section II reformed DOF 19 January 2026) and art. 112; deindexation decree DOF 27 January 2016, transitory Third, LGPGIR arts. 106 and 112, 2026-01-19 official text · verified 2026-10-26 · changed: Decree DOF 19 January 2026 added breaches of the Circular Economy Law and extended producer responsibility agreements to art. 106, section II.
Cost to do it: Cost depends on the implementation agreements per product category: take back, recycling or compensation schemes, typically shared through a sector coordinating body.
Example: An importer of packaged consumer goods must expect to register a circular management plan for its packaging and finance its recovery once the REP agreements for that category are issued. / A foreign brand selling through a Mexican importer should allocate REP costs in the distribution contract.Ley General de Economía Circular (LGEC), new law DOF 19 January 2026, Arts. 2, section XXXI, 36 to 41; transitory articles First to Third, 2026-01-19 official text · verified 2026-10-26 · changed: New law DOF 19 January 2026 created extended producer responsibility and the circular economy registry, and reformed the LGEEPA and LGPGIR.
| Category | Annual volume | Register with | Main duties |
|---|---|---|---|
| Large generator | 10 tonnes or more | SEMARNAT | Management plan, log, annual report, environmental insurance |
| Small generator | 400 kg to under 10 tonnes | SEMARNAT | Log of volumes and handling, management plans where applicable |
| Microgenerator | Up to 400 kg | State or municipal authority | Local management plans, authorized collection or transport |
Hazardous waste generator categories (LGPGIR arts. 5 and 46 to 48)
| Activity | MXN 2026 | About USD |
|---|---|---|
| Collection and transport | MXN 6,137.82 | USD 329 |
| Collection and storage center | MXN 6,134.51 | USD 329 |
| Recycling or co processing | MXN 3,872.69 | USD 207 |
| Reuse | MXN 3,872.69 | USD 207 |
| Treatment | MXN 10,111.10 | USD 542 |
| Incineration | MXN 81,499.65 | USD 4,367 |
| Confinement or final disposal | MXN 134,197.72 | USD 7,190 |
| Handling services | MXN 9,590.09 | USD 514 |
Hazardous waste authorization duties in 2026 (LFD art. 194-T; USD at MXN 18.6638)
Worked example
- A foreign owned electronics assembler in Baja California generates 25 tonnes of hazardous waste a year: it registers as a large generator, files a management plan and annual report, insures, and hires a SEMARNAT authorized carrier after checking its authorization (LGPGIR arts. 42 and 46). Waste from components imported temporarily must be returned or handled as the law requires (art. 106, section XXII), and drums cannot sit on site more than six months (art. 56). Under the 2026 Circular Economy Law it should also map which of its products and packaging will fall under extended producer responsibility agreements.
Step by step
- 1. Measure annual hazardous waste volumes and determine the generator category.
- 2. Register with SEMARNAT (large and small) or the state or municipality (micro); large generators file a management plan and get insurance.
- 3. Keep a log, label and store waste under the official standards, and ship before six months.
- 4. Contract only authorized carriers and disposal firms and verify their SEMARNAT authorizations.
- 5. File the annual report; notify emergencies and losses.
- 6. Track REP implementation agreements under the Circular Economy Law for your product categories and plan registration of the circular management plan.
Common traps
- Storing waste beyond six months without an extension (LGPGIR arts. 56 and 106, section VII).
- Assuming the hauler takes over all liability: the generator remains jointly responsible and fully liable if the provider is unauthorized (art. 42).
- Closing a plant without removing all hazardous waste (art. 106, section XX).
- Ignoring the 2026 Circular Economy Law until product agreements arrive: breaching it or REP agreements is now an LGPGIR infringement (art. 106, section II).
Sources
- Ley General para la Prevención y Gestión Integral de los Residuos, Chamber of Deputies consolidated text (last reform DOF 19 January 2026)
- LGPGIR, copy consulted
- Ley General de Economía Circular, Chamber of Deputies text (DOF 19 January 2026)
- Ley General de Economía Circular, copy consulted
- Ley Federal de Derechos, Chamber of Deputies text
- Resolución Miscelánea Fiscal para 2026, Annex 4 (DOF 28 December 2025), SAT
- Constitution, deindexation decree DOF 27 January 2016 (transitory Third)
- IMSS Technical Council agreement citing the 2026 UMA of MXN 117.31 (INEGI, DOF 9 January 2026)
- US Federal Reserve H.10 via FRED, Mexican pesos per US dollar (DEXMXUS)
Related pages
- regulation/overview
- regulation/environmental-impact-authorization
- regulation/environmental-liability-and-contaminated-sites
- trade/immex
- sectors/mining-concessions
- /country/mexico/
- /calendar/
- Live dashboard
Related: Mexico country profile · live dashboard · central bank and release calendar · our posts on X
