Countries › Bolivia › Guide › 12. Sectors › Rooftop solar, distributed generation and renewable projects

Rooftop solar, distributed generation and renewable projects

Last verified: 2026-11-15 · Status: Changing

Regulated consumers may generate renewable power for their own use and inject surplus under net metering. Since February 2026, plants of 1 to 6 MW can inject into medium voltage networks with a regulator authorization and no generation licence. Distributors may also own renewables up to 15 percent of their maximum demand.

Key facts

Nanogeneration ceiling10 kWD.S. 4477 art. 3 a), text of D.S. 5167 art. 2 II, as of 2026-11-11 · in force
Microgeneration ceiling50 kWD.S. 4477 art. 3 b), text of D.S. 5167 art. 2 II, as of 2026-11-11 · in force
Minigeneration ceiling500 kWD.S. 4477 art. 3 c), text of D.S. 5167 art. 2 II, as of 2026-11-11 · in force
Medium scale floor1 MWD.S. 5549 art. 3 I, as of 2026-02-18 · in force
Medium scale ceiling6 MWD.S. 5549 art. 3 I, as of 2026-02-18 · in force
Distributor renewable ownership ceiling15 % of maximum demandD.S. 5616 (ministry summary), as of 2026-05-01 · in force
Macrogeneration (self producer) ceiling6000 kWResolución AETN 336/2026, as of 2026-06-02 · in force

The rule

1. D.S. 4477 sets the general rules for distributed generation and the payment (retribución) for energy injected into the distribution network.D.S. 4477, Art. 1, 2021-03-24 official text · verified 2026-11-11
2. Sizes are: nano up to 10 kW, micro over 10 kW to 50 kW, mini over 50 kW to 500 kW, macro over 500 kW for self production only, and medium scale from 1 MW to 6 MW.D.S. 4477 as replaced by D.S. 5167 and amended by D.S. 5549, Art. 3 of D.S. 4477 (text of D.S. 5167 art. 2 II; inciso e) added by D.S. 5549 art. 3 I), 2024-06-05 official text · verified 2026-11-11 · changed: D.S. 5167 of 5 June 2024 raised the mini ceiling from 350 kW to 500 kW and added the macro tier; D.S. 5549 of 18 February 2026 added the 1 to 6 MW medium scale tier.
3. A distributed generator is a regulated consumer with a system for its own use and the option of injecting surplus. A medium scale generator may be any natural or legal person with a regulator authorization to connect a plant to the distributor's medium voltage network.D.S. 4477 as amended by D.S. 5549, Art. 2 i) and j) (text of D.S. 5549 art. 2 I), 2026-02-18 official text · verified 2026-11-11
4. The distributor authorizes connection. Installers must be entered in the AETN register and registered and enabled with the distributor, and connection works are at the generator's cost, under the distributor's specifications.
Cost to do it: Connection works are at the generator's cost. Installer registration with AETN is free (inscripción sin costo) under Resolución AETN 301/2026, according to the AETN distributed generation page.D.S. 4477 as amended by D.S. 5167 and D.S. 5549; Resolución AETN 301/2026, Art. 4 a) and c), art. 6 II, 2026-02-18 official text · verified 2026-11-11
5. Distributed generators use net metering, on the balance of energy consumed and injected. The regulator sets the payment method, in Resolución AETN 380/2024 of 4 July 2024.D.S. 4477 as amended by D.S. 5549; Resolución AETN 380/2024, Art. 5 II, 2024-07-04 official text · verified 2026-11-11
6. Self producers may inject at one or more points and withdraw at others in the distributor's area, compensated by hourly blocks, and pay the distributor for use of the network. AETN set their maximum size at over 500 kW up to 6,000 kW.D.S. 4477 as amended by D.S. 5549; Resolución AETN 336/2026, Art. 2 a), k) and o); Res. 336/2026 resolutive part, 2026-06-02 official text · verified 2026-11-11 · changed: Resolución AETN 336/2026 of 2 June 2026 fixed the macro tier range at 500 kW to 6,000 kW.
7. Medium scale plants need no licence or concession if they inject only into distribution networks, with no direct or indirect injection into the trunk grid, and stay out of national economic dispatch. The activity is enabled by an authorization under AETN rules.D.S. 5549, Disposición Adicional Única, 2026-02-18 official text · verified 2026-11-11 · changed: New route created on 18 February 2026.
8. The regulator sets a stabilized energy price for medium scale plants. The plant signs an injection contract with the distributor, and CNDC records monthly transactions. Demand agents in the wholesale market pay in proportion to consumption.D.S. 5549, Art. 3 III, new art. 12 of D.S. 4477, 2026-02-18 official text · verified 2026-11-11
9. AETN approved the payment regulation for medium scale generators with solar PV plants, with stabilized energy prices set by specific PV yield and land costs in an annex.Resolución AETN 180/2026, Resuelve (síntesis resolutiva), 2026-04-01 official text · verified 2026-11-11 · changed: Regulation issued on 1 April 2026.
10. Distributed systems may be installed at electric vehicle charging stations.D.S. 5549, Art. 3 IV, new art. 13 of D.S. 4477, 2026-02-18 official text · verified 2026-11-11
11. Distributors may generate with renewables as long as it does not exceed 15 percent of their maximum demand in the national grid. According to the ministry, the decree uses a levelized cost of energy set under AETN supervision, bars cross subsidies between generation and distribution, requires separate accounts and limits injection into the trunk grid save exceptions. We did not read the decree text, and no official copy that loads gives its exact date; the ministry announced it on 1 May 2026.D.S. 5616 (ministry summary), Not read (Ministry note of 1 May 2026), 2026-05-01 official text · verified 2026-11-15 · changed: New decree announced by the ministry on 1 May 2026.
12. The government sent a Green Energy Promotion bill to the Legislative Assembly. It would set an energy sector taxonomy so eligible green projects can access climate finance. It is pending.Ley de Fomento a las Energías Verdes (bill, pending), Ministry note of 12 October 2026, 2026-10-12 official text · verified 2026-11-11
SizeWhoSale of energyTitle
Up to 10 kWRegulated consumerNet meteringDistributor approval and registration
Over 10 to 50 kWRegulated consumerNet meteringDistributor approval and registration
Over 50 to 500 kWRegulated consumerNet meteringDistributor approval and registration
Over 500 kW to 6,000 kWRegulated consumer, self production onlyOwn use, remote withdrawalAETN inscription and distributor registration as self producer
1 to 6 MWAny personStabilized price under contractRegulator authorization, no licence if the three conditions hold
Above that, or into the trunk gridGeneratorWholesale market or contractLey 1604 regime (concession, licence or registration by activity and size)

Routes by size

Worked example

  • A factory in Santa Cruz with a 400 kW roof system consumes 50,000 kWh in a month, generates 42,000 kWh and injects 12,000 kWh of that at weekends. Under net metering, the balance runs on consumed energy against injected energy, and the regulator's method values the result. Before sizing, ask the distributor how its tariff blocks treat this.

Step by step

  1. Pick a tier and check that the installer is registered with AETN.
  2. File the project with the distributor.
  3. Install and pass inspection.
  4. Sign the contract with the distributor.
  5. For 1 to 6 MW, check feeder capacity and get the regulator's authorization.

Common traps

  • The 1 to 6 MW exemption falls away if energy reaches the trunk grid, directly or indirectly, or if the plant joins dispatch.
  • Medium scale prices are regulated: Resolución AETN 180/2026 sets stabilized prices for solar PV by yield and land cost. We did not read the annex figures, so take the price for your site from the resolution before modelling revenue.
  • Only regulated consumers qualify below medium scale, so a pure investor needs a consumer's site or the medium scale route.
  • D.S. 5549 also gave CNDC 30 working days to adapt its rules. Confirm the CNDC procedures exist before financing.
  • Distributed generators cannot use the Tarifa Dignidad discount (D.S. 4477, Disposición Adicional Segunda).

Sources

Related pages

Related: Bolivia country profile · live dashboard · central bank and release calendar · our posts on X