Bolivia's 1994 electricity law splits the grid into generation, transmission and distribution, with licences for the first two and concessions for distribution. Foreign firms must operate through a local S.A., and since April 2026 most projects under 2,000 kW (6,000 kW for renewables) need no licence. The Constitution keeps the chain under the State, and a bill sent to the Assembly on 30 September 2026 would replace the 1994 law.
USD figures use Bs 12.09 per US dollar, the official rate (TCO) published by the Banco Central de Bolivia for 31 October to 3 November 2026. The rate now floats, so boliviano amounts stay the same while their dollar value changes. Conversions are for orientation only.
Key facts
| Self production without licence, below | 2000 kWRes. AETN 180/2026; D.S. 24043 RCLLP art. 4 b), as of 2026-11-11 · in force |
|---|---|
| Supply to third parties without title, below | 2000 kWRes. AETN 180/2026; D.S. 24043 RCLLP art. 4 a), as of 2026-11-11 · in force |
| Renewable production without title, below | 6000 kWRes. AETN 180/2026; D.S. 24043 RCLLP art. 4 c), as of 2026-11-11 · in force |
| Maximum distribution concession | 40 yearsLey 1604 art. 2, as of 2026-11-11 · in force |
| Regulation fee ceiling | 1 % of salesLey 1604 art. 14, as of 2026-11-11 · in force |
| Ceiling on average monthly change in regulated distribution tariffs | 5 %D.S. 5647 (ministry note of 30 Sep 2026), as of 2026-11-15 · in force |
| Foreign company vehicle | Bolivian S.A. subsidiary textLey 1604 art. 10, as of 2026-11-11 · in force |
| Private generation allowed | Yes, under licence and CPE art. 378 textCPE art. 378; Ley 1604 art. 23, as of 2026-11-11 · in force |
The rule
Cost to do it: S.A. formation cost and capital are on entities/sociedad-anonima.Ley 1604 de Electricidad, Art. 10, 1994-12-21 official text · verified 2026-11-11
Cost to do it: Up to 1 percent of sales.
Example: On sales of Bs 12,090,000, up to Bs 120,900. / On sales of US$1,000,000, up to US$10,000.Ley 1604 de Electricidad, Art. 14, 1994-12-21 official text · verified 2026-11-11
| Activity | Title | Term | Norm |
|---|---|---|---|
| Generation to third parties from 2,000 kW | Licence | Not stated in Ley 1604 | Ley 1604 art. 23; Res. AETN 180/2026 |
| Self production from 2,000 kW | Licence | Not stated in Ley 1604 | Ley 1604 art. 23; Res. AETN 180/2026 |
| Renewable production from 6,000 kW | Licence | Not stated in Ley 1604 | Ley 1604 art. 23; Res. AETN 180/2026 |
| Transmission | Licence | Not stated in Ley 1604 | Ley 1604 art. 23 |
| Distribution | Concession | Up to 40 years | Ley 1604 art. 2 |
| Plant studies using natural resources | Provisional licence | Up to 3 years, one extension | Ley 1604 art. 2 and 24 |
| Distributed generation | Registration or authorization | See renewables page | D.S. 4477 |
Which title for which activity
Worked example
- A 20 MW generator selling Bs 60,450,000 (US$5,000,000) a year pays up to Bs 604,500 (US$50,000) of regulation fee at the 1 percent ceiling, before income tax and remittance withholding.
Step by step
- Form the S.A.
- Choose the site and check environmental and land rules.
- Obtain a provisional licence for studies where needed.
- Apply to AETN for the licence and sign the contract.
- Join the wholesale market under CNDC rules.
- Watch the bill, which may change the structure mid project.
Common traps
- Unbundling means a generator cannot hold a stake in a transmission company, so a developer cannot own a shared line through its generation vehicle without checking art. 15.
- Ley 1604 calls the regulator the Superintendency. It is now AETN.
- Older summaries still quote 300 kW limits for supply to third parties and renewables. Res. AETN 180/2026 sets 2,000 kW and 6,000 kW, and AETN can move the limits again by resolution.
- Some reports call D.S. 5750 a monthly tariff rise; the Presidency says it only changes the exchange rate input to a monthly average. The decree text was not reachable online, so read the official text before relying on it for a contract.
- We did not read the electricity bill itself; its content here comes from the ministry note.
- We found no 2026 official figures for installed capacity or peak demand, so none are shown.
Sources
- Constitución Política del Estado (INRA copy)
- Ley 1604 (AETN copy)
- Resolución AETN 180/2026, power limits without licence
- Presidency note on D.S. 5746 to 5750 of 14 October 2026
- Ministry note on D.S. 5616 of 1 May 2026
- Ministry note on D.S. 5647 of 2 July 2026
- Ministry note of 30 September 2026
- Ministry note of 7 May 2026
- BCB Balance of Payments first half 2026
Related pages
- sectors/renewables-and-distributed-generation
- sectors/sectors-reform-tracker
- entities/sociedad-anonima
- investing/environmental-licensing-and-prior-consultation
- /country/bolivia/
- /calendar/
- Live dashboard
Related: Bolivia country profile · live dashboard · central bank and release calendar · our posts on X
Get rule changes weekly
Free. One email a week from The LatAm Thread.
One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.