Before any mining work a holder needs an environmental authorization, a water authority act and a sworn statement to the ministry. Local staff must be at least 80% of the workforce, closure plans start at prefeasibility, and the final plan is due within the two years before the planned end. Since 13 August 2026 certain sales and exports of processed ore to China need sampling before shipment.

Ecuador is dollarized: the US dollar is the currency in use, so local currency and USD amounts are the same and no conversion is applied.

Key facts

Minimum Ecuadorian workforce80 %Ley de Minería art. 75, as of 2026-11-15 · in force
Final closure plan lead time2 yearsLey de Minería art. 85, as of 2026-11-15 · in force
Peak demand above which grid connected mines must self generate fully10 MWReglamento LOSPEE, as of 2026-09-30 · in force

The rule

1. Mining needs prior favorable acts: an environmental administrative authorization under the regime and stage, a water authority act, and a sworn statement before a notary that activities do not affect roads, ports, beaches, telecom networks, military sites, oil, aviation or power infrastructure or heritage. If the ministry sees a possible effect, the competent body has 30 working days to respond, and silence counts as no objection.Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, Registro Oficial Quinto Suplemento 234, 2 March 2026, art. 4 (replaces Ley de Minería art. 26), Ley de Minería art. 26 (RO 234 pp. 9 and 10), 2026-03-02 official text · verified 2026-11-15 · changed: Art. 26 was replaced by art. 4 of the law in RO 234 of 2 March 2026.
2. Holders must employ Ecuadorian staff of at least 80% of the workforce. In the rest, Ecuadorian specialists come first, and foreign staff may be hired only if none are available.Ley de Minería, Registro Oficial Suplemento 517, 29 January 2009 (article not changed by the reforms in RO 2S 461 of 20 December 2023, RO 3S 112 of 28 August 2025 or RO 5S 234 of 2 March 2026), art. 75, 2009-01-29 official text · verified 2026-11-15
3. Environmental studies must include closure planning with its guarantee, starting at the prefeasibility stage. Plans are updated in annual budgets and compliance audits. A final closure plan goes to the environmental authority within two years before the planned end of the project.Ley de Minería, Registro Oficial Suplemento 517, 29 January 2009; art. 85 replaced by art. 16 of the law in RO 2S 37, 16 July 2013, and not changed since, art. 85, 2013-07-16 official text · verified 2026-11-15
4. The State runs information, participation and consultation processes, and cannot delegate this to a private party. If consultation shows majority opposition, the sector minister decides by reasoned resolution.Ley de Minería, Registro Oficial Suplemento 517, 29 January 2009 (article not changed by the reforms in RO 2S 461 of 20 December 2023, RO 3S 112 of 28 August 2025 or RO 5S 234 of 2 March 2026), art. 87, 2009-01-29 official text · verified 2026-11-15
5. A special mandatory consultation procedure applies to communities, peoples and nationalities when exploration or exploitation takes place on their ancestral lands and territories or may affect their interests.Ley de Minería, Registro Oficial Suplemento 517, 29 January 2009 (article not changed by the reforms in RO 2S 461 of 20 December 2023, RO 3S 112 of 28 August 2025 or RO 5S 234 of 2 March 2026), art. 90, 2009-01-29 official text · verified 2026-11-15
6. Mining rights are forfeited automatically, with no further procedure, once the environmental authority has rated and notified environmental damage. Holders may use administrative and court remedies, but these do not suspend or interrupt forfeiture proceedings.Ley Orgánica de Transparencia Social, Registro Oficial Tercer Suplemento 112, 28 August 2025, Disposición Reformatoria Quinta letter b (replaces Ley de Minería art. 108), Ley de Minería art. 108 (RO 112 pp. 53 to 56), 2025-08-28 official text · verified 2026-11-15 · changed: Art. 108 was replaced on 28 August 2025: automatic forfeiture on notified environmental damage, remedies no longer suspend the process, and the response and cure periods became 15 working days each.
7. Metal mining in any phase is banned in protected areas, urban centers and intangible zones.Constitución de la República del Ecuador, Registro Oficial 449, 20 October 2008; second paragraph of art. 407 added by the referendum of 4 February 2018, Registro Oficial Suplemento 180, 14 February 2018, art. 407, 2018-02-14 official text · verified 2026-11-15
8. People and companies without a concession that trade or export metallic minerals, or export non metallic minerals, need a commercial licence from the ministry, valid three years, renewable for equal periods and not transferable. Holders that trade metallic minerals or export non metallic minerals from areas outside their concessions also need one.Ley de Minería, Registro Oficial Suplemento 517, 29 January 2009 (article not changed by the reforms in RO 2S 461 of 20 December 2023, RO 3S 112 of 28 August 2025 or RO 5S 234 of 2 March 2026), arts. 50 and 51, 2009-01-29 official text · verified 2026-11-15
9. Domestic sales and exports of processed mineralized material to China, under any customs regime, are held until lab results are validated if the parties are related or the buyer or its ultimate controller has foreign State participation or control. Without the verification record, shipment and customs release cannot go ahead. The control took effect when signed on 13 August 2026, and the agency was given 30 days to issue the technical instructions.Acuerdo MAE-VM-2026-0001-AM, 13 August 2026, Registro Oficial Cuarto Suplemento 359, 1 September 2026, arts. 2, 3, 6 and 8, Disposición Transitoria Única and Disposición Final Cuarta, 2026-08-13 official text · verified 2026-11-15 · changed: New pre export control signed 13 August 2026, in force on signature, and published 1 September 2026.
10. The ministry may declare mining clusters with shared infrastructure, and the 2026 law adds security protected mining areas where the armed forces give support against criminal groups. The investment promotion article added at the same time states that it creates no acquired rights or automatic exemptions.Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, Registro Oficial Quinto Suplemento 234, 2 March 2026, art. 8 (adds Ley de Minería arts. 66.1 to 66.3), Ley de Minería arts. 66.1 to 66.3 (RO 234 pp. 12 to 17), 2026-03-02 official text · verified 2026-11-15 · changed: Added by art. 8 of the law in RO 234 of 2 March 2026.
11. Mining projects connected to the national grid must include self generation or self supply clauses in their titles. Above 10 MW of peak demand they must self generate 100% of their demand, and up to 10 MW they may choose between that and regulated supply with self supply. Projects off the grid run their own generation under the mining title.Reglamento General de la LOSPEE, last amended RO 380 9S, 30 September 2026, unnumbered art. on supply of oil and mining projects, 2026-09-30 official text · verified 2026-11-15 · changed: Regulation amended by the act in RO 380 9S of 30 September 2026.

Worked example

  • A US$1,000,000 sale of concentrate to a buyer controlled by a foreign State company is held until the sampling result is validated, and customs will not release the shipment without the verification record. The price agreed does not change whether the control applies.

Step by step

  1. Secure environmental, water and sworn statement acts.
  2. Plan hiring around the 80% rule.
  3. Build the closure guarantee into the budget from prefeasibility.
  4. Map communities and ancestral land early.
  5. For China sales, plan storage time for sampling.

Common traps

  • The 30 working day no objection rule covers only the bodies consulted under art. 26, not the environmental or water acts.
  • The State runs consultation, so a company agreement with a community does not replace it.
  • Art. 87 lets the minister proceed after opposition, but Constitutional Court rulings limit how this applies to indigenous consultation: see investing/environmental-permits-and-consultation.
  • The August 2026 control turns on whether the parties are related or who controls the buyer, not on the price agreed. The agency's technical instructions were not found.

Sources

Related pages

Related: Ecuador country profile · live dashboard · central bank and release calendar · our posts on X