Countries › Ecuador › Guide › 12. Sectors › Electricity market in Ecuador: delegation to private firms, 40 year concessions, lender rights and tariffs
Electricity market in Ecuador: delegation to private firms, 40 year concessions, lender rights and tariffs
Last verified: 2026-11-15 · Status: Changing
Electricity is a public service, but private and foreign State companies can generate, and can win new transmission projects, by exceptional delegation. The March 2026 reform allows concessions of up to 40 years, gives holders a real right they can pledge, and adds lender step in rights. Distribution stays with the State, and the regulator sets the costs that drive tariffs.
Ecuador is dollarized: the US dollar is the currency in use, so local currency and USD amounts are the same and no conversion is applied.
Key facts
The rule
1. The ministry may exceptionally delegate to private companies, foreign State companies and popular economy companies, through public selection, for Master Plan projects where delays exceed two years or there is a deficit risk, where public companies cannot provide the service, in a sector emergency, or where private terms are justifiably better. Non Plan projects qualify in set cases, and renewables, transition energy, self generation and energy districts may also be delegated.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), art. 25 (replaced by art. 16 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 · changed: Art. 25 was amended by art. 16 of the law in RO 234 of 2 March 2026. 2. Delegation needs objective technical, economic and legal studies. The State keeps policy, planning, regulation and control. The ministry sets a yearly MW limit on new generation by technology, with possible exceptions for industrial self supply and strategic projects.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), art. 25.1 (added by art. 17 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 · changed: Added by art. 17 of the law in RO 234 of 2 March 2026. 3. Concession contracts run up to 40 years from commercial operation, depending on technology, and may be renegotiated once, as an exception.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), art. 25.1, last paragraph (added by art. 17 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 4. Delegated companies must be domiciled in Ecuador.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), art. 25, last paragraph (replaced by art. 16 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 5. The ministry issues two titles: an operating authorization for projects of public and mixed companies, and a concession contract for private and popular economy companies.
Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), RO 418 3S, 16 January 2015, arts. 27 to 29, 2015-01-16 official text · verified 2026-11-15 6. A title gives its holder a real right over the concession, its assets and income. Trusts, guarantees, pledges of income and assignment of receivables are allowed.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), art. 27.1 (added by art. 18 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 · changed: Added by art. 18 of the law in RO 234 of 2 March 2026. 7. Project assets may secure financing for generation, storage or transmission, but only liens notified to the ministry are valid against third parties. Secured lenders get step in rights and must sign direct agreements with the grantor.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), arts. 38.1 to 38.3 (added by art. 21 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 · changed: Added by art. 21 of the law in RO 234 of 2 March 2026. 8. Transmission belongs to the State's public company, but private, foreign State and popular economy companies may take new transmission projects by concession as an exception. The assets revert to the State free at the end. Generators and large consumers may build a line for their own needs at their cost with ministry approval.
Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), RO 418 3S, 16 January 2015, text as amended to 9 December 2024 (ARCONEL copy), art. 42 (replaced by art. 9 of the law in RO 475 2S, 11 January 2024), 2024-01-11 official text · verified 2026-11-15 9. Distribution and sale are carried out by the State through qualified entities in exclusive areas. Electric vehicle charging is open to qualified persons, at prices capped by the regulator.
Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), RO 418 3S, 16 January 2015, text as amended to 9 December 2024 (ARCONEL copy), art. 43 (replaced RO 452 4S, 2021; amended RO 475 2S, 2024) and unnumbered art. on vehicle charging (added RO 449 S, 2019), 2024-01-11 official text · verified 2026-11-15 10. Large consumers, rated by the regulator, may buy through bilateral contracts.
Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), RO 418 3S, 16 January 2015, text as amended to 9 December 2024 (ARCONEL copy), art. 44 (first paragraph replaced by art. 13 of the law in RO 452 4S, 14 May 2021), 2021-05-14 official text · verified 2026-11-15 11. CENACE dispatches at minimum hourly cost using audited variable costs based on international fuel prices. Dispatch incentives give preference to non conventional renewables up to 10 MW, and a minimum dispatch to transition energy plants.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), art. 48 (replaced by art. 25 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 · changed: Replaced by art. 25 of the law in RO 234 of 2 March 2026. 12. Transition energy plants that obtain their title within five years after Decreto Ejecutivo 515 have a minimum dispatch of 60% of the energy they can deliver at effective capacity, for the life of the title, assessed quarterly with annual consolidation to March. After those five years the percentage will be set again on the system operator's report.
Decreto Ejecutivo 515, reforms to the Reglamento General de la LOSPEE, RO 380 9S, 30 September 2026, art. 38 (paragraph added to Reglamento art. 100) and Transitoria Segunda, 2026-09-30 official text · verified 2026-11-15 13. The grantor or distributors may back contract payments with contingent funds, trusts and other listed guarantees, in line with public finance rules.
Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, RO 234 5S, 2 March 2026, amending the Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), unnumbered art. after art. 49 on forms of payment guarantee (added by art. 26 of the RO 234 law), 2026-03-02 official text · verified 2026-11-15 · changed: Added by art. 26 of the law in RO 234 of 2 March 2026. 14. Each year, within the first half, ARCONEL sets the generation, transmission, distribution and sale costs on which the next year's end user tariffs rest, and it may set tariffs to promote basic industries. Short term energy is valued at the hourly cost from real dispatch.
Ley Orgánica del Servicio Público de Energía Eléctrica (LOSPEE), RO 418 3S, 16 January 2015, text as amended to 9 December 2024 (ARCONEL copy), arts. 51 (replaced by art. 14 of the law in RO 475 2S, 11 January 2024) and 54, 2024-01-11 official text · verified 2026-11-15 Worked example
- A US$200,000,000 hydro project financed by lenders needs each lien notified to the ministry to bind third parties. The lenders sign a direct agreement, and a loan of 25 years sits within a concession that may run to 40 years from commercial operation.
Step by step
- Check the Master Plan and the yearly MW limit.
- Choose public selection or a private initiative route.
- Form a company domiciled in Ecuador.
- Where the project uses renewable resources, get the National Environmental Authority's authorization to use them (LOSPEE art. 30).
- Sign the title and regulated or other contracts.
- Notify liens and sign the direct agreement.
Common traps
- Private entry remains an exception and needs objective technical, economic and legal studies: art. 25.1.
- Arts. 27 to 29 still name the former Ministerio de Electricidad y Energía Renovable, and art. 41 leaves self generation and its surpluses to ARCONEL regulation. Check ARCONEL's rules.
- A lien not notified to the grantor does not bind third parties.
- When a title ends, assets serving the public service revert to the State at no cost (art. 33 as replaced in March 2026, and art. 42 for transmission concessions). Exclusions include non conventional renewable generators of up to 10 MW and private projects outside the Master Plan.