Small scale and artisanal mining in Ecuador: limits, permits, gold sales and the bar on foreign partners
Last verified: 2026-11-15 · Status: Changing
The Mining Law sets production ceilings that split small, medium and large mining. Small scale holders pay 3% royalty and a 2% yearly fee per hectare. Artisanal miners hold a non renewable ten year permit of 4 or 6 hectares, and cannot have foreign companies as partners.
Ecuador is dollarized: the US dollar is the currency in use, so local currency and USD amounts are the same and no conversion is applied. Amounts tied to the basic wage use US$482 a month, the 2026 figure shown in INEC's January 2026 basket report.
Key facts
| Maximum artisanal permit term, not renewable | 10 yearsLey de Minería art. 134, replaced by art. 12, RO 5S 234 (2 March 2026), as of 2026-03-02 · in force |
|---|---|
| Small scale yearly fee per hectare | 9.64 USDLey de Minería art. 34, replaced by art. 5, RO 5S 234 (2 March 2026), at a basic wage of US$482, as of 2026-11-15 · in force |
| Small scale metallic underground ceiling | 300 tonnes a dayLey de Minería unnumbered art. after art. 138, as of 2026-11-15 · in force |
The rule
Cost to do it: US$9.64 a hectare a year at the 2026 basic wage of US$482 (INEC, January 2026 basket report).
Example: 100 ha: US$964 a year / US$964Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, Registro Oficial Quinto Suplemento 234, 2 March 2026, amending the Ley de Minería (RO Suplemento 517, 29 January 2009), Ley de Minería arts. 34 (last paragraph) and 93, as replaced by arts. 5 and 10 of the 2026 law, 2026-03-02 official text · verified 2026-11-15
| Mineral and method | Small: up to | Medium: from and to |
|---|---|---|
| Metallic, underground | 300 t/day | 301 to 1,000 t/day |
| Metallic, open pit | 1,000 t/day | 1,001 to 2,000 t/day |
| Metallic, alluvial | 1,500 m³/day | 1,501 to 3,000 m³/day |
| Non metallic | 1,000 t/day | 1,001 to 3,000 t/day |
| Construction, alluvial terraces | 800 m³ | 801 to 2,000 m³ |
| Construction, hard rock quarry | 500 t/day | 501 to 1,000 t |
Production ceilings by regime
Worked example
- A 200 hectare small scale gold title selling US$2,000,000 a year pays US$60,000 in royalty and 200 × US$9.64 = US$1,928 in fees, and shares its 15% profit pool 10% to workers and 5% to the State and local governments (Ley de Minería art. 67).
Step by step
- Match planned output to the regime ceilings.
- Register the small scale status.
- Plan the transition before an artisanal permit expires.
- Sell gold through the central bank or an authorized agent.
Common traps
- Exceeding the ceilings moves a project out of the small scale regime and its 3% and 2% rates.
- A foreign company cannot enter an artisanal holder as a partner: the route is a small scale or larger title.
- Prior permit holders cannot pass an expired area to close relatives.
Sources
- Ley de Minería, official text to RO 2S 602 (December 2021), Ministry of Energy and Mines copy
- Registro Oficial Quinto Suplemento 234, 2 March 2026 (2026 mining and energy reform)
- Acuerdo MAE-MAE-2026-0047-AM
- INEC, canastas analíticas January 2026 (basic wage US$482)
Related pages
- sectors/mining-concessions
- sectors/mining-royalties-and-state-share
- sectors/mining-operations-closure-and-communities
- /country/ecuador/
- /calendar/
- Live dashboard
Related: Ecuador country profile · live dashboard · central bank and release calendar · our posts on X
Get rule changes weekly
Free. One email a week from The LatAm Thread.
One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.