The LatAm Thread

Countries › Haiti › Guide › 12. Sectors › Mining titles in Haiti: prospecting, research and exploitation permits, concessions and the mining convention under the 1976 decree

Mining titles in Haiti: prospecting, research and exploitation permits, concessions and the mining convention under the 1976 decree

Last verified: 2026-11-15 · Status: Stable

Metallic mining in Haiti runs on a ladder of exclusive titles from the 1976 decree. You start with a prospecting permit (up to 100 km2, 2 years), then a research permit (up to 50 km2, 2 years plus two renewals) and an exploitation permit (up to 25 km2), which becomes a 25 year concession once commercial production starts. The fees per km2 are still in 1976 gourdes (HTG 10, 50 and 250 a year), so the real fiscal terms sit in a mining convention negotiated with the State and published in Le Moniteur. The BME accepts a Haitian société anonyme or a foreign company for the prospecting request, but its procedure then requires a Haitian société anonyme with its registered office in Haiti and a negotiated mining convention.

USD figures use HTG 130.5300 per US dollar, the Banque de la République d'Haïti reference rate for 30 September 2026 in its daily series (https://www.brh.ht/wp-content/uploads/Serie-taux-25-26.pdf, row 30-Sep-26). Conversions are for orientation only.

Key facts

Maximum area of a mining prospecting permit100 km2Décret du 3 mars 1976, art. 35, as of 2026-11-15 · in force
Mining prospecting permit term (not renewable)2 yearsDécret du 3 mars 1976, art. 35, as of 2026-11-15 · in force
Annual mining prospecting permit fee10 HTG per km2Décret du 3 mars 1976, art. 35, as of 2026-11-15 · in force
Maximum area of a mining research permit50 km2Décret du 3 mars 1976, art. 37, as of 2026-11-15 · in force
Mining research permit term2 years, renewable twice for 2 years yearsDécret du 3 mars 1976, art. 37, as of 2026-11-15 · in force
Annual mining research permit fee50 HTG per km2Décret du 3 mars 1976, art. 37, as of 2026-11-15 · in force
Annual mining exploitation permit fee250 HTG per km2Décret du 3 mars 1976, art. 39, as of 2026-11-15 · in force
Deadline to start work after a prospecting or research permit is granted3 monthsDécret du 3 mars 1976, art. 35 and 37, as of 2026-11-15 · in force

The rule

1. A prospecting permit is the first title for metallic minerals. It is exclusive, indivisible and separate from ownership of the land, and it cannot be leased, mortgaged, assigned or transferred. It covers at most 100 km2 for 2 years and cannot be renewed. The applicant must meet the eligibility conditions of art. 16 and 17 and, once approved, pays in advance, for the whole term, an annual fee of HTG 10 per km2. Work must start within 3 months of grant and continue without interruption except for duly established force majeure, or the permit is cancelled automatically with no refund of fees. At expiry the holder files a detailed work report.
Cost to do it: HTG 10 per km2 per year, paid in advance for the full term: a 100 km2 permit costs HTG 2,000 for 2 years (US$15.32).
Example: 100 km2 x HTG 10 x 2 years = HTG 2,000 / US$15.32Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 35, 1976-03-03 official text · verified 2026-11-15
2. A holder who meets the prospecting work and reporting obligations is automatically entitled to a research permit. The research permit is exclusive and cannot be leased, mortgaged, assigned or transferred. It must sit inside the prospecting area and cover at most 50 km2. It lasts 2 years and can be renewed for two consecutive 2 year periods. The applicant lists the substances targeted and files the prospecting results, then pays in advance HTG 50 per km2 per year. The same 3 month start rule and no refund cancellation apply. Bulk samples for industrial tests may be extracted and exported only with prior written authorization, and a detailed results report is due at expiry.
Cost to do it: HTG 50 per km2 per year in advance: a 50 km2 permit costs HTG 2,500 a year (US$19.15).
Example: 50 km2 x HTG 50 = HTG 2,500 a year / US$19.15Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 36 and 37, 1976-03-03 official text · verified 2026-11-15
3. A research permit holder who files the final research report is automatically entitled to an exploitation permit. The exploitation permit is exclusive and cannot be mortgaged, but it can be assigned, transmitted and leased with prior authorization under art. 31. It must sit inside the research area and cover at most 25 km2. The fee is HTG 250 per km2 per year, paid in advance. The holder builds and develops the mine within the permit area and files a feasibility study on the conditions of exploitation.
Cost to do it: HTG 250 per km2 per year: a 25 km2 permit costs HTG 6,250 a year (US$47.88).
Example: HTG 6,250 / US$47.88Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 38 and 39, 1976-03-03 official text · verified 2026-11-15
4. The exploitation permit converts automatically into a mining concession on the date of commercial production, meaning the date the mine reaches exportable production capacity. The concession is indivisible, of limited term, separate from land ownership and cannot be mortgaged; it can be assigned, transmitted and leased with prior authorization, and it never gives ownership of the resource. It stays inside the exploitation permit area, and no one may hold more than 100 km2 of concessions. It lasts 25 years, is renewable for 10 year periods and pays HTG 250 per km2 per year.Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 40 to 42 and 45, 1976-03-03 official text · verified 2026-11-15
5. The financial clauses of the mining convention are subject to periodic review during the concession, and both the concession and the convention are instituted by laws or decrees published in Le Moniteur, the official gazette.Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 43 and 44, 1976-03-03 official text · verified 2026-11-15
6. The BME procedure for metallic substances starts with a letter requesting a prospecting permit, with a site location map whose perimeter corners are georeferenced (WGS 84 UTM). The applicant must be a Haitian société anonyme or a foreign company and files its articles and bylaws, its board of directors, proof of technical capacity (prior work, CVs of technical staff) and financial capacity (consolidated financial statements for the last 2 years), names an experienced geologist as the contact with the BME and pays the fees set by law. After the detailed prospecting report, the BME list goes on to require a Haitian société anonyme with its registered office in Haiti, a mining convention negotiated with the State under art. 21 of the 1976 decree, and, at the end of the research permit, a detailed report including a full feasibility study.Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), as applied by the BME procedure for metallic substances, art. 21, as cited in the BME procedure, 1976-03-03 official text · verified 2026-11-15
7. A mine is a permanent establishment for income tax. A foreign company that runs a mine, oil or gas well, quarry or any other place of extraction of natural resources in Haiti is taxed in Haiti on the profits of that establishment.Décret du 30 septembre 2026 remplaçant le Décret du 19 décembre 2022 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 60 (3) b and (7) f, 2026-09-30 official text · verified 2026-11-15
8. A taxpayer under a formal payment demand can be banned, until it pays in full, from acquiring a mining exploitation title or a concession, as well as from bidding for public contracts, acquiring a land title or getting a building permit. The ban is published in a widely circulated newspaper and on the tax administration website.Décret du 30 septembre 2026 remplaçant le Décret du 19 décembre 2022 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 329 (1) a, d, e and f, and (2), 2026-09-30 official text · verified 2026-11-15
TitleMax areaTermAnnual feeTransferableHow you get it
Prospecting permit100 km22 years, not renewableHTG 10 per km2 (US$0.08)NoApplication to the BME (art. 35)
Research permit50 km2, inside the prospecting area2 years, renewable twice for 2 yearsHTG 50 per km2 (US$0.38)NoAutomatic if prospecting obligations are met (art. 36)
Exploitation permit25 km2, inside the research areaUntil commercial productionHTG 250 per km2 (US$1.92)Yes, with prior authorization (art. 31)Automatic if the research report is filed (art. 38)
Mining concessionInside the exploitation area; 100 km2 cap per holder25 years, renewable for 10 year periodsHTG 250 per km2 (US$1.92)Yes, with prior authorization (art. 31)Automatic conversion at commercial production; instituted by law or decree with the convention (art. 40, 44)

The metallic mining title ladder (Décret du 3 mars 1976; USD at HTG 130.5300, BRH reference rate of 30 September 2026)

DecreeSubject
Décret du 3 mars 1976 (Le Moniteur No. 19 of 8 March 1976)Titles, eligibility, mining convention, holders' duties, transfers, closed zones and relations with landowners
Companion decree10 percent levy for INAREM on all amounts collected in its field
Companion decree25 cents per m3 levy on quarry material and river sand for INAREM
Companion decreePurchase of alluvial gold entrusted to INAREM

What the BME calls the Haitian mining code (four decrees of March 1976, as listed on the BME site)

Worked example

  • A junior explorer takes a 100 km2 prospecting permit, then a 50 km2 research permit renewed twice, then a 25 km2 exploitation permit. State fees under the decree: prospecting 100 x HTG 10 x 2 years = HTG 2,000; research 50 x HTG 50 x 6 years = HTG 15,000; exploitation 25 x HTG 250 = HTG 6,250 a year. Total fees over the 8 years before exploitation are HTG 17,000 (US$130.24). The economics of the project are set by the mining convention, not by these fees.
  • The same explorer misses the 3 month deadline to start work on its research permit. Under art. 37 (d), the permit is cancelled automatically and the fees paid in advance are not refunded, which also breaks the automatic path to an exploitation permit.

Step by step

  1. Check the BME potential maps and the mining cadastre unit for open ground, then send the BME a prospecting request with a georeferenced site map (WGS 84 UTM).
  2. File the company documents: articles and bylaws, board composition, technical references and CVs, and 2 years of consolidated financial statements; name an experienced geologist as the BME contact.
  3. On grant, pay the fees for the full term in advance and start work within 3 months (art. 35).
  4. Before the prospecting permit expires, file the detailed report and the research permit request with the list of target substances (art. 36, 37).
  5. Following the order of the BME procedure, after the prospecting report set up or convert to a Haitian société anonyme with its registered office in Haiti and negotiate the mining convention with the State (art. 21).
  6. File the final research report to obtain the exploitation permit, then the feasibility study; plan the law or decree that institutes the concession and convention (art. 38 to 44).
  7. Keep tax filings current: a formal payment demand can block the grant of an exploitation title or concession (Code Fiscal art. 329).

Common traps

  • The fees are 1976 amounts. The BME notes they were set when US$1 equalled HTG 5 and should be updated under the draft new mining law, so model the convention terms, not the decree fees.
  • Prospecting and research permits cannot be transferred, leased or mortgaged (art. 35, 37). Farm ins and joint ventures at those stages must be structured at the level of the holder's shares or by contract, not by assigning the permit.
  • No mining title can be mortgaged, including exploitation permits and concessions (art. 39, 41). Lenders need other security.
  • The financial clauses of the convention are subject to periodic review during the concession (art. 43), so stabilization must be negotiated expressly.
  • Missing the 3 month start deadline cancels the permit with no refund (art. 35, 37), and only force majeure that is duly established stops the clock.
  • The 100 km2 concession cap applies per holder (art. 42), so plan group structures with that limit in mind.

Sources

Related pages

Related: Haiti country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.