Quarries, sand and groundwater in Haiti: the 1984 permit, area caps and the 2026 Code Fiscal fees

Last verified: 2026-11-15 · Status: Changing

Quarrying sand, gravel, limestone and other non metallic materials in Haiti needs a 5 year renewable permit from the Bureau des Mines et de l'Energie under a 1984 decree, capped at 10 hectares per permit and 30 hectares per holder. The 2026 Code Fiscal sets the money side: HTG 50,000 a year for a sand quarry permit, HTG 1 million a year for industrial sand and river quarrying, HTG 500,000 for industrial groundwater use, and per truck eco fees. You also need the Ministry of the Environment's non objection, title deeds, proof of tax compliance and a memorandum of agreement with the State.

USD figures use HTG 130.5300 per US dollar, the Banque de la République d'Haïti reference rate for 30 September 2026 (row 30-Sep-26 of the BRH 2025 2026 rate series). Conversions are for orientation only.

Key facts

Quarry exploitation permit term5 years, renewable yearsDécret du 4 mars 1984, art. 12, as of 2026-11-15 · in force
Maximum area of one quarry permit10 haDécret du 4 mars 1984, art. 17, as of 2026-11-15 · in force
Maximum total quarry area per holder30 haDécret du 4 mars 1984, art. 17, as of 2026-11-15 · in force
Annual fee for a sand quarry exploitation permit50000 HTGCode Fiscal 2026, art. 168, as of 2026-11-15 · in force
Annual fee for industrial sand and river quarrying1000000 HTGCode Fiscal 2026, art. 169, as of 2026-11-15 · in force
Annual fee for industrial groundwater exploitation500000 HTGCode Fiscal 2026, art. 169, as of 2026-11-15 · in force
Eco fee per load of quarry sand on trucks of 8 tonnes or more150 HTGCode Fiscal 2026, art. 170, as of 2026-11-15 · in force

The rule

1. A quarry is any site where non metallic, non energy minerals are extracted, open pit or underground, whatever the setting: mountain, plain, riverbed, ravine or shore. No one may work a quarry, permanently or temporarily, without a prior permit from the ministry in charge of mines, now handled by the Bureau des Mines et de l'Energie (BME), on pain of the sanctions of the decree. Running a quarry is a commercial act, so quarry businesses fall under ordinary commercial and tax law.Décret du 4 mars 1984 réglementant les exploitations de carrières sur toute l'étendue du territoire national (Le Moniteur No. 26 of 2 April 1984), art. 2, 4 and 6, 1984-03-04 official text · verified 2026-11-15
2. Any individual or company may apply, except officials and employees of the ministry. The application identifies the applicant and, for a company, its name, legal form, registered office and representatives with their nationality. It must show competence, experience, solvency and enough financial reserves, and it states the substances, the exact limits and coordinates of the area on a plan at 1/1,000 to 1/10,000, the commune, the working plan, and how damage to the site and landscape will be compensated or the land rehabilitated.Décret du 4 mars 1984 réglementant les exploitations de carrières sur toute l'étendue du territoire national (Le Moniteur No. 26 of 2 April 1984), art. 8 to 10, 1984-03-04 official text · verified 2026-11-15
3. A quarry permit is granted for 5 years and is renewable. One permit may cover at most 10 hectares, and no one may hold, directly or indirectly, permits covering more than 30 hectares in total. The area is surveyed in the presence of an official delegated by the ministry.Décret du 4 mars 1984 réglementant les exploitations de carrières sur toute l'étendue du territoire national (Le Moniteur No. 26 of 2 April 1984), art. 12 and 17, 1984-03-04 official text · verified 2026-11-15
4. The BME procedure adds the documents it checks in practice: a georeferenced site map (WGS 84 UTM), the Ministry of the Environment's non objection certificate backed by an environmental and social impact study, title deeds and survey report, proof of tax compliance (communal patente, quitus, NIF, tax registration for the activity and the receipt for payment of the permit fee to the DGI), a signed undertaking on environmental protection and rehabilitation during and after extraction, proof of technical and financial capacity, the company's bylaws and operating authorization, and a technical form signed by the technical manager. The applicant then negotiates a memorandum of agreement (protocole d'accord) with the State on operating conditions and tax obligations.Décret du 4 mars 1984 réglementant les exploitations de carrières sur toute l'étendue du territoire national (Le Moniteur No. 26 of 2 April 1984), as applied by the BME permit procedure, art. 9 and 10, 1984-03-04 official text · verified 2026-11-15
5. The holder of a sand quarry exploitation permit pays a fee of HTG 50,000 a year, collected by the BME.
Cost to do it: HTG 50,000 a year (US$383.05).
Example: HTG 50,000 / US$383.05Décret remplaçant le Décret du 19 décembre 2022 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 168, 2026-09-30 official text · verified 2026-11-15
6. Industrial exploitation of sand and river quarries pays an annual fee of HTG 1,000,000, and industrial exploitation of groundwater pays HTG 500,000 a year. These fees are due between 1 and 31 October each year.
Cost to do it: Sand and river quarries HTG 1,000,000 (US$7,661.07); groundwater HTG 500,000 (US$3,830.54) a year.
Example: HTG 1,000,000 / HTG 500,000 / US$7,661.07 / US$3,830.54Décret remplaçant le Décret du 19 décembre 2022 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 169, 2026-09-30 official text · verified 2026-11-15
7. Quarry sand loads carry eco fees collected by the BME: HTG 150 per load on heavy trucks of 8 tonnes or more and HTG 100 per load on trucks under 8 tonnes; trucks carrying fill material (bancs d'empoint) pay HTG 15 per m3 (art. 170). Loads of other quarry substances pay HTG 100 per load on 4 tonne trucks and HTG 50 per load on 2 tonne trucks; art. 171 does not say who collects them.
Cost to do it: HTG 150 (US$1.15) per heavy sand load; HTG 15 (US$0.11) per m3 of fill.
Example: HTG 150 per load / US$1.15Décret remplaçant le Décret du 19 décembre 2022 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 170 and 171, 2026-09-30 official text · verified 2026-11-15
8. A quarry is a permanent establishment for income tax, so a foreign company working a quarry in Haiti is taxed in Haiti on the profits of that site. Any tax, duty or fee not carried into the 2026 Code Fiscal is repealed.Décret remplaçant le Décret du 19 décembre 2022 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 60 (7) f and 541, 2026-09-30 official text · verified 2026-11-15
ItemAmountUSDWhenCollected byArticle
Sand quarry exploitation permitHTG 50,000 a yearUS$383.05AnnuallyBME168
Industrial sand and river quarryingHTG 1,000,000 a yearUS$7,661.071 to 31 OctoberNot stated169 (1) a
Industrial groundwater exploitationHTG 500,000 a yearUS$3,830.541 to 31 OctoberNot stated169 (1) b
Quarry sand, truck of 8 tonnes or moreHTG 150 per loadUS$1.15Per loadBME170
Quarry sand, truck under 8 tonnesHTG 100 per loadUS$0.77Per loadBME170
Fill material (bancs d'empoint)HTG 15 per m3US$0.11Per m3BME170
Other quarry substances, 4 tonne truckHTG 100 per loadUS$0.77Per loadNot stated171
Other quarry substances, 2 tonne truckHTG 50 per loadUS$0.38Per loadNot stated171

Quarry and groundwater fees in the 2026 Code Fiscal (USD at HTG 130.5300, BRH rate for 30 September 2026)

Worked example

  • A sand quarry holds a permit and ships 20 loads a day on 10 tonne trucks for 300 working days. Fees: the permit fee of HTG 50,000 plus 6,000 loads x HTG 150 = HTG 900,000, for HTG 950,000 a year (US$7,278.02). If the operation is industrial, art. 169 adds HTG 1,000,000 (US$7,661.07) payable in October; the Code does not say whether the art. 168 permit fee is then also due, so confirm with the BME and the DGI.
  • A bottling plant draws groundwater industrially. It owes HTG 500,000 a year under art. 169, payable between 1 and 31 October, on top of ordinary corporate taxes.

Step by step

  1. Secure the land: title deeds, survey plan and survey report for an area of at most 10 hectares (30 hectares across all your permits).
  2. Commission the environmental and social impact study and obtain the Ministry of the Environment's non objection certificate.
  3. Get tax compliance papers in order: NIF, communal patente, quitus and tax registration for the activity.
  4. File the permit application with the BME in three copies, with the georeferenced map, working plan, rehabilitation undertaking, technical form and proof of capacity; the BME visits the site.
  5. Pay the permit fee and negotiate the protocole d'accord with the State on operating and tax conditions.
  6. Put a load register in place so the per truck eco fees can be paid and reconciled with the BME.
  7. Diary the 1 to 31 October window for industrial fees and the 5 year permit renewal.

Common traps

  • The BME's own quarry page still describes the 2012 finance law charges, including 10 percent on sales of quarry products. That 10 percent charge is not in the 2026 Code Fiscal, and art. 541 repeals any tax not carried into the Code. Confirm the current charges with the DGI before pricing.
  • The BME page dates the quarry decree to 4 March 1984 in one place and 2 March 1984 in another. Cite the Le Moniteur reference (No. 26 of 2 April 1984) in contracts.
  • The 30 hectare cap counts permits held directly or indirectly (art. 17), so related companies' permits are added together.
  • Riverbed and shoreline extraction falls under the quarry decree (art. 2) and usually triggers the strictest environmental review.
  • Ministry officials and employees cannot hold quarry permits (art. 8), which matters when vetting local partners.

Sources

Related pages

Related: Haiti country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.