Haiti has no producing oil or gas fields. Exploration runs under the same 1976 decree as mining, through two permits from the Bureau des Mines et de l'Energie: prospecting (up to 500 km2, 5 years plus 2) and research (up to 500 km2, 5 years renewable for 3 year periods). The fees are HTG 25 and HTG 50 per km2 a year, still in 1976 gourdes, so the commercial terms sit in a convention negotiated with the State. The BME records 11 wells drilled from 1945 to 1977 with no confirmed hydrocarbons, and two exploration permits signed between 2015 and 2019.

USD figures use HTG 130.7437 per US dollar, the Banque de la République d'Haïti reference rate shown for 16 November 2026 on the BRH taux du jour page, retrieved on 17 November 2026. That page shows only the latest rate and BRH publishes no dated series online. Conversions are for orientation only.

Key facts

Maximum area of a hydrocarbon prospecting permit500 km2Décret du 3 mars 1976, art. 47, as of 2026-11-15 · in force
Hydrocarbon prospecting permit term5 years plus a 2 year extension yearsDécret du 3 mars 1976, art. 47, as of 2026-11-15 · in force
Annual hydrocarbon prospecting permit fee25 HTG per km2Décret du 3 mars 1976, art. 47, as of 2026-11-15 · in force
Maximum area of a hydrocarbon research permit500 km2Décret du 3 mars 1976, art. 48, as of 2026-11-15 · in force
Hydrocarbon research permit term5 years, renewable for 3 year periods yearsDécret du 3 mars 1976, art. 48, as of 2026-11-15 · in force
Annual hydrocarbon research permit fee50 HTG per km2Décret du 3 mars 1976, art. 48, as of 2026-11-15 · in force
Deadline to start work after a hydrocarbon research permit is granted6 monthsDécret du 3 mars 1976, art. 48, as of 2026-11-15 · in force

The rule

1. A hydrocarbon prospecting permit follows the same legal regime as a mining prospecting permit, so it is exclusive, separate from land ownership and cannot be assigned, leased or mortgaged, with three differences. The holder may drill deep holes and take samples to build a geological model. The permit lasts 5 years with a 2 year extension and covers at most 500 km2. The annual fee is HTG 25 per km2 for each permit.
Cost to do it: HTG 25 per km2 per year: a 500 km2 permit costs HTG 12,500 a year (US$95.61).
Example: HTG 12,500 / US$95.61Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 47 (and art. 35 by reference), 1976-03-03 official text · verified 2026-11-15
2. A hydrocarbon research permit allows all research operations, including pumping tests, within its limits. It is exclusive and indivisible, separate from land ownership, and cannot be leased, mortgaged, assigned or transmitted. It must sit inside the prospecting area it comes from and cover at most 500 km2. It lasts 5 years and is renewable for 3 year periods. The applicant lists the target substances and pays HTG 50 per km2 per year in advance.
Cost to do it: HTG 50 per km2 per year in advance: a 500 km2 permit costs HTG 25,000 a year (US$191.21).
Example: HTG 25,000 / US$191.21Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 48, 1976-03-03 official text · verified 2026-11-15
3. Research work must start within 6 months of grant and continue without interruption except for force majeure, or the permit is cancelled automatically with no refund of fees. Bulk samples for industrial tests may be extracted and exported only with prior written authorization from the mining authority (the decree names the Institut National des Ressources Minérales). At expiry the holder files a detailed report of the work and results.Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 48, 1976-03-03 official text · verified 2026-11-15
4. To apply, a company writes to the Bureau des Mines et de l'Energie (BME) with a site map showing the georeferenced corners of the perimeter (WGS 84 UTM). It must be a Haitian société anonyme or a foreign company and files its articles and bylaws, its board of directors, its technical capacity (prior work, CVs of technical staff) and its consolidated financial statements for the last 2 years, and names an experienced technical director as the BME contact. At the research stage the BME requires a Haitian société anonyme with its registered office in Haiti and a mining convention negotiated with the State under art. 21 of the 1976 decree, followed by a full feasibility study.Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), as applied by the BME permit procedure, art. 21, 47 and 48, 1976-03-03 official text · verified 2026-11-15
5. An oil or gas well is a permanent establishment for income tax, so a foreign company producing in Haiti is taxed in Haiti on the profits of that site.Décret du 30 septembre 2026 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 60 (7) f, 2026-09-30 official text · verified 2026-11-15
6. Downstream, excise duties on petroleum products are not fixed in the Code Fiscal itself. They are set under the decree on how petroleum product prices are fixed and by order of the Minister of Economy and Finance.Décret du 30 septembre 2026 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 202 (2), 2026-09-30 official text · verified 2026-11-15
7. A taxpayer under a formal payment demand can be banned, until it pays in full, from acquiring a mining exploitation title or a concession. The ban is published in a large circulation newspaper and on the tax administration website.Décret du 30 septembre 2026 portant Code Fiscal (Le Moniteur Spécial N° 48-A of 30 September 2026), art. 329 (1) f and (2), 2026-09-30 official text · verified 2026-11-15
PermitMax areaTermAnnual feeTransferableStart of work
Prospecting500 km25 years plus 2 year extensionHTG 25 per km2 (US$0.19)No (mining prospecting regime, art. 35)Within 3 months under the mining prospecting regime (art. 35, applied by art. 47)
Research500 km2, inside the prospecting area5 years, renewable for 3 year periodsHTG 50 per km2 (US$0.38), in advanceNoWithin 6 months (art. 48)

Hydrocarbon permits under the 1976 decree (USD at HTG 130.7437)

PeriodWhat happened
1939 to 1981Geological studies, gravity and magnetic surveys and drilling by several foreign companies
1945 to 197711 wells drilled (8 onshore, 3 offshore) in the Cul de Sac plain, Artibonite plain, Central Plateau and Gonâve island; no confirmed hydrocarbons
Leads named by the BMEGonâve island, Rochelois bank (Miragoâne), Central Plateau and Cul de Sac plain
2015 to 2019Three companies applied for exploration permits; two obtained signed permits and one started field work at Bellevue, Boucan Carré

Exploration record as published by the Bureau des Mines et de l'Energie

Worked example

  • A company takes a 500 km2 prospecting permit for the full 7 years: 500 x HTG 25 x 7 = HTG 87,500 (US$669.25). It then takes a 500 km2 research permit for 5 years: 500 x HTG 50 x 5 = HTG 125,000 (US$956.07), paid in advance. The State fees are trivial next to seismic and drilling costs, which is why the convention, not the decree, decides the fiscal take.

Step by step

  1. Review the BME exploration record and data for the target basin, and check the mining cadastre for existing permits.
  2. Send the BME a prospecting request with a georeferenced perimeter map (WGS 84 UTM), company documents, technical references and 2 years of consolidated financial statements; name a technical director as the BME contact.
  3. Pay the fees and start work within the deadline; keep a log of any force majeure event, since only that stops the clock.
  4. Before the prospecting permit ends, file the detailed report and, if the results justify it, the research permit request with the list of target substances.
  5. Incorporate or convert to a Haitian société anonyme with its seat in Haiti and negotiate the convention with the State, including fiscal terms, stabilization and dispute resolution.
  6. Get written BME authorization before exporting any bulk sample for testing.

Common traps

  • The decree has no production sharing or modern petroleum contract model. Everything commercial, from royalty to cost recovery, has to be negotiated into the convention.
  • Research permits cannot be assigned or transmitted (art. 48), so a farm in partner cannot take a direct interest in the permit.
  • Missing the 6 month start deadline cancels the research permit with no refund (art. 48).
  • The BME itself says the HTG 50 per km2 research fee needs updating, so expect fee changes in any new law.
  • From the research stage, a foreign company needs a Haitian société anonyme with its seat in Haiti, which brings Haitian corporate, tax and audit obligations.

Sources

Related pages

Related: Haiti country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.