Sectors in Haiti: electricity, solar, mining, telecoms and the incentive sectors, with the licence rules that apply to each

Last verified: 2026-11-15 · Status: Changing

Haiti has no general sector screening, but four activities need a State title before you start. Electricity needs an ANARSE licence or concession. Mines and hydrocarbons need a permit and then a convention. Telecoms and spectrum need a CONATEL concession or permit. LPG distribution needs an operating authorization. The sectors the State wants to grow are agriculture, crafts, national industry, tourism, export assembly and free zones. Under the 2002 Investment Code as rewritten by the 2026 budget decree, approved firms get up to 10 years of customs franchises and up to 7 years of income tax exemption. The budget decree in force since 1 October 2026 suspends all import duties and taxes on solar panels, lithium ion batteries and inverters. Most of the sector laws date from 1976 to 2016 and their fees are stated in old gourde amounts, so check the specific convention or cahier des charges before you price a project.

USD figures use HTG 130.5300 per US dollar, the Banque de la République d'Haïti reference rate for 30 September 2026 in its dated daily series for fiscal year 2025-2026 (https://www.brh.ht/wp-content/uploads/Serie-taux-25-26.pdf). Conversions are for orientation only.

Key facts

Electricity regulatorAutorité Nationale de Régulation du Secteur de l'Énergie (ANARSE) Décret du 6 janvier 2016, art. 22, as of 2026-11-15 · in force
Fine for operating an electricity business without a licence or concession5000000 HTGDécret du 6 janvier 2016, art. 69, as of 2026-11-15 · in force
Duties and taxes on imported solar panels, lithium ion batteries and invertersSuspended Décret du 30 septembre 2026 (budget 2026-2027), art. 32, as of 2026-11-15 · in force
NDP customs duty on lithium ion batteries (8507.60.00) before suspension20 %Tarif NDP SH 2022, as of 2026-11-15 · in force
Maximum area of a mining exploitation permit25 km2Décret du 3 mars 1976, art. 39, as of 2026-11-15 · in force
Mining concession term25 years, renewable for 10 year periods yearsDécret du 3 mars 1976, art. 45, as of 2026-11-15 · in force
Annual mining concession fee250 HTG per km2Décret du 3 mars 1976, art. 45, as of 2026-11-15 · in force
Maximum mining concession area per holder100 km2Décret du 3 mars 1976, art. 42, as of 2026-11-15 · in force
Telecommunications regimeState monopoly, operated through concessions or permits Décret du 12 octobre 1977, art. 1, as of 2026-11-15 · in force
Maximum income tax holiday for approved investments7 yearsDécret du 30 septembre 2026, art. 23, as of 2026-11-15 · in force
Maximum income tax holiday for free zone promoters and operators10 yearsDécret du 30 septembre 2026, art. 30, as of 2026-11-15 · in force

The rule

1. Electricity was opened to private operators in 2016. Generating, transmitting, distributing or selling electricity, by any means, needs a licence, an exploitation right or a public service concession from the regulator, the Autorité Nationale de Régulation du Secteur de l'Énergie (ANARSE). Production licences are granted either on individual request or through an ANARSE tender. The criteria are the energy source, the site and land use, efficiency, installed capacity and the applicant's ability to finance the project without a State guarantee. Each licence is formalized in an agreement with the regulator covering land, tariffs, sanctions and dispute resolution.Décret du 6 janvier 2016 régissant le Secteur de l'Énergie Électrique (Le Moniteur No. 23 of 3 February 2016), art. 1, 5 to 8, 10 to 13, 2016-01-06 official text · verified 2026-11-15
2. Grid access is open: a transmission or distribution company may not refuse access to a producer whose request is normal and made in good faith, and may not apply discriminatory tariffs. Exclusivity or preferential access clauses in connection contracts are forbidden, and producers must send their connection contracts to the regulator on signature. A producer receives no State subsidy beyond the incentives of the Investment Code and other laws in force.Décret du 6 janvier 2016 régissant le Secteur de l'Énergie Électrique (Le Moniteur No. 23 of 3 February 2016), art. 14 and 16, 2016-01-06 official text · verified 2026-11-15
3. Regulated tariffs must reflect the economic cost of supply and allow a normal rate of return on capital that is high enough to attract new investment. The return is defined in real terms, net of inflation. Every sale must be billed on metered consumption, and flat rate billing is prohibited. Operators pay an annual fee to the regulator and are subject to ordinary tax and customs law, but specific financial, tax and customs advantages may be granted depending on the cahier des charges, the investment required and the network works involved.Décret du 6 janvier 2016 régissant le Secteur de l'Énergie Électrique (Le Moniteur No. 23 of 3 February 2016), art. 61, 65, 67 and 68, 2016-01-06 official text · verified 2026-11-15
4. Running an electricity business without a licence or concession is a crime. Any manager, de jure or de facto, faces 1 to 3 years in prison and a fine of HTG 5 million, or one of these penalties. Putting a generation, transmission or distribution installation into service without a certificate of conformity is punished by 3 to 6 months in prison and a fine of HTG 1 million to HTG 5 million.
Cost to do it: Fine for operating without a licence: HTG 5,000,000 (US$38,305.37). Fine for commissioning without a certificate of conformity: HTG 1,000,000 to HTG 5,000,000 (US$7,661.07 to US$38,305.37).
Example: HTG 5,000,000 / US$38,305.37Décret du 6 janvier 2016 régissant le Secteur de l'Énergie Électrique (Le Moniteur No. 23 of 3 February 2016), art. 69 and 78, 2016-01-06 official text · verified 2026-11-15
5. All duties, taxes and other levies on the sale and import of solar equipment are suspended. This covers lithium ion batteries (tariff heading 8507.60.00), photovoltaic cells, whether or not assembled in modules or panels (8541.42.00 and 8541.43.00), and inverters (8504.40.11 and 8504.40.19). The equipment must be used only to produce, store, distribute or consume solar energy in Haiti. Under the NDP SH 2022 tariff, the ordinary customs duty is 20 percent on lithium ion batteries, 5 percent on other static converters (8504.40.19) and 0 percent on photovoltaic cells and photovoltaic converters, so the suspension matters most for storage.
Cost to do it: No customs duty or import tax on qualifying solar equipment. Without the suspension, lithium ion batteries carry a 20 percent customs duty under the NDP tariff.
Example: HTG 6,526,500 of batteries: HTG 1,305,300 customs duty suspended / US$50,000 of batteries: US$10,000 customs duty suspendedDécret du 30 septembre 2026 établissant le Budget Général, exercice fiscal 2026-2027 (Le Moniteur Spécial N° 49 of 1 October 2026), art. 32, 2026-09-30 official text · verified 2026-11-15 · changed: From 1 October 2026, the start of fiscal year 2026-2027, art. 32 of the budget decree suspends all duties and taxes on the listed solar equipment.
6. LPG importers must require every customer (micro centres, distributors and retailers) to show an up to date patente and an operating authorization from the competent authority. An importer that breaches this rule is fined HTG 100,000. A micro centre, distributor or retailer operating irregularly is fined HTG 50,000, and may also face temporary or permanent closure and criminal prosecution.
Cost to do it: Importer fine HTG 100,000 (US$766.11); distributor or retailer fine HTG 50,000 (US$383.05).
Example: HTG 100,000 / HTG 50,000 / US$766.11 / US$383.05Décret du 30 septembre 2026 établissant le Budget Général, exercice fiscal 2026-2027 (Le Moniteur Spécial N° 49 of 1 October 2026), art. 34, 34-1, 34-2 and 34-3, 2026-09-30 official text · verified 2026-11-15
7. Metallic mining runs on a three step ladder of exclusive titles, each separate from ownership of the land. A prospecting permit covers at most 100 km2 for 2 years, is not renewable and costs HTG 10 per km2 per year, paid in advance. A research permit covers at most 50 km2 for 2 years, is renewable twice for 2 years and costs HTG 50 per km2 per year. An exploitation permit covers at most 25 km2 and costs HTG 250 per km2 per year. Holders who meet their work and reporting obligations get the next permit automatically. Work must start within 3 months, or the permit lapses without refund. Exploitation permits may be transferred, but only with prior authorization.
Cost to do it: Annual fees per km2: prospecting HTG 10 (US$0.08), research HTG 50 (US$0.38), exploitation and concession HTG 250 (US$1.92). These are 1976 amounts that the Bureau des Mines et de l'Energie itself flags for updating.
Example: 25 km2 exploitation permit: HTG 6,250 per year / US$47.88 per yearDécret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 35 to 39, 1976-03-03 official text · verified 2026-11-15
8. An exploitation permit converts automatically into a mining concession on the date of commercial production, meaning the date the installations reach exportable capacity. A concession lasts 25 years and is renewable for 10 year periods. No one may hold more than 100 km2 of concessions. The concession never gives ownership of the resource, its financial terms are subject to periodic revision, and the concession and the mining convention are both instituted by a law or decree published in Le Moniteur.Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 40 to 45, 1976-03-03 official text · verified 2026-11-15
9. Hydrocarbon prospecting permits run 5 years with a 2 year extension over at most 500 km2, at HTG 25 per km2 per year. Research permits cover at most 500 km2 for 5 years, are renewable for 3 year periods and cost HTG 50 per km2 per year, and work must start within 6 months. Applicants file with the Bureau des Mines et de l'Energie and must be a Haitian société anonyme or a foreign company. The file includes a georeferenced site map, the articles of incorporation, the board of directors, proof of technical capacity and two years of consolidated financial statements.Décret du 3 mars 1976 encourageant la prospection minière sur toute l'étendue du territoire et adaptant les structures juridiques existantes aux réalités de l'industrie minière (Le Moniteur No. 19 of 8 March 1976), art. 47 and 48, 1976-03-03 official text · verified 2026-11-15
10. The State holds the monopoly of telecommunications services. It may bring in private persons or companies through concessions or operating permits, and it may limit the number of concessions or permits held by one person. Any installation of telecommunications equipment needs prior authorization. The exceptions are wired systems that do not use the public domain and private broadcast receivers, and equipment operating without authorization is treated as clandestine. Concessions and permits cannot be transferred, assigned or leased without a decision of the competent authority. All radio frequencies belong to the State, which alone assigns them.Décret du 12 octobre 1977 accordant à l'État le monopole des services de télécommunications, art. 1, 2, 13, 18, 19 and 65, 1977-10-12 official text · verified 2026-11-15
11. The sectors the State most wants to grow have dedicated incentive regimes. Approved firms get a full income tax exemption for at most 7 consecutive years. Agricultural, craft, national industry and tourism firms get customs and tax franchises on equipment for at most 10 consecutive years (tourism only where the goods cannot be found locally at the same quality and price). Export firms get franchises on raw materials and equipment plus temporary admission. Free zone promoters and operators get an income tax exemption of at most 10 years and a 7 year exemption from the property tax on built property (CFPB).Décret du 30 septembre 2026 établissant le Budget Général, exercice fiscal 2026-2027 (Le Moniteur Spécial N° 49 of 1 October 2026), art. 23 and 25 to 30 (rewriting Investment Code art. 27, 29, 31, 33, 35 and 38 and art. 21 of the Loi du 9 juillet 2002 sur les zones franches), 2026-09-30 official text · verified 2026-11-15 · changed: The income tax holiday under the 2002 Investment Code was up to 15 years with a phase-in. Since 1 October 2026 it is at most 7 years, then full tax.
SectorTitle neededAuthorityBase textKey numbers
Electricity (generation, transmission, distribution, sale)Licence, exploitation right or public service concessionANARSEDécret du 6 janvier 2016Unlicensed operation: 1 to 3 years and HTG 5,000,000 (US$38,305.37)
Solar equipment importsNone; duty suspension applies to listed equipmentCustoms (AGD)Budget decree of 30 September 2026, art. 32All duties and taxes suspended; ordinary battery duty 20%
LPG distributionPatente plus operating authorizationCompetent authority for sale and distributionBudget decree of 30 September 2026, art. 34Fines HTG 100,000 (importer) and HTG 50,000 (retailer)
Metallic miningProspecting, research, exploitation permit, then concession and conventionBureau des Mines et de l'EnergieDécret du 3 mars 1976Concession 25 years, max 100 km2, HTG 250 per km2 per year
HydrocarbonsProspecting and research permitsBureau des Mines et de l'EnergieDécret du 3 mars 1976, art. 47 and 48Up to 500 km2; HTG 25 and HTG 50 per km2 per year
Telecoms and spectrumConcession or operating permit; prior authorization of installationsCONATELDécret du 12 octobre 1977Frequencies are State property; titles not transferable without approval
Agriculture, crafts, national industry, tourism, export, free zonesOptional approval for incentivesInterministerial Investment Commission; Conseil National des Zones FranchesInvestment Code 2002 as rewritten by the budget decree of 30 September 2026Income tax holiday up to 7 years (free zones 10); customs franchises up to 10 years

Who licenses what in Haiti (verified 15 November 2026)

Worked example

  • A developer imports US$50,000 (HTG 6,526,500 at HTG 130.5300) of lithium ion batteries for a solar plus storage system. Under the NDP tariff, the ordinary customs duty is 20 percent, or US$10,000 (HTG 1,305,300). Under art. 32 of the budget decree in force since 1 October 2026, that duty and all other import duties and taxes on the batteries are suspended, as long as they are used only for solar energy in Haiti. The panels themselves already carry 0 percent customs duty under the tariff.
  • A mining company holds a 25 km2 exploitation permit. Under art. 39 of the 1976 decree, the annual State fee is 25 x HTG 250 = HTG 6,250 (US$47.88), paid in advance. The real economics sit in the mining convention, which is instituted by law or decree and whose financial clauses are revised periodically (art. 43 and 44).

Step by step

  1. Identify whether the activity needs a sector title: electricity (ANARSE), mines and hydrocarbons (Bureau des Mines et de l'Energie), telecoms and spectrum (CONATEL), LPG distribution (operating authorization). Other activities need only ordinary company registration and the patente.
  2. For electricity, decide between an individual licence request and an ANARSE tender. Prepare the technical, financial, environmental and land file listed in art. 8 and 12 of the 2016 decree, and plan to finance the project without a State guarantee.
  3. For mining, apply for a prospecting permit first. Start work within 3 months of grant and file the end of permit report, so the next permit follows automatically.
  4. For telecoms, obtain the concession or permit and the prior authorization of installations before importing or deploying equipment, and have frequencies assigned by the State.
  5. Where the project is in agriculture, crafts, national industry, tourism, export or free zones, file the incentive request with the competent ministry before importing equipment, so the customs franchises apply from day one.
  6. For solar projects, document that each battery, panel and inverter is destined only for solar production, storage, distribution or consumption in Haiti, and match the tariff headings listed in art. 32.
  7. Check the budget decree each 1 October: Haiti's annual budget decrees rewrite incentive and duty rules.

Common traps

  • The electricity decree is criminal law, not just regulation: a manager who operates without a licence risks prison as well as a HTG 5 million fine (art. 69). Self-supply arrangements that sell power to third parties need a licence.
  • Exclusive or preferential access clauses in grid connection contracts are void under art. 16, so do not build a financing case on exclusivity with the grid operator.
  • The solar suspension covers only the listed tariff headings, and only equipment used for solar energy. Ordinary static converters (8504.40.19) carry 5 percent duty and lithium ion batteries 20 percent when the conditions are not met.
  • Mining permit fees are still the 1976 gourde amounts. The Bureau des Mines et de l'Energie itself notes that they were set when US$1 equalled HTG 5 and should be updated, so expect the convention, not the decree, to set the real fiscal terms.
  • Prospecting and research permits cannot be transferred, mortgaged or leased. Only exploitation permits and concessions can be transferred, and only with prior authorization, so structure joint ventures at the right stage.
  • Telecom concessions and permits cannot be transferred, assigned or leased without the authority's decision (art. 18 of the 1977 decree), and this matters in any share or asset sale.
  • The income tax holiday was cut from up to 15 years to at most 7 from 1 October 2026. Older business plans and conventions may assume the longer holiday.

Sources

Related pages

Related: Haiti country profile · live dashboard · central bank and release calendar · our posts on X

Get rule changes weekly

Free. One email a week from The LatAm Thread.

One more step after you press the button: we take you to Substack, where your email is already filled in. Confirm there to start. No spam, unsubscribe anytime, we never share your address. By subscribing you agree to the privacy policy.